1、Discuss the construction temperature and crack of the concrete lightlyBy G. K. Kululanga, W. Kuotcha, R。 McCaffer, Member, ASCE, and F. Edum-Fotwe ,The American Society of Civil EngineersThe summary , In order to prevent the owners of the concrete work of claims, we must do a good job in the constru

2、ction process in the temperature and crack control,through observation live for many years, through consulting the monograph about stress within the concrete, explain to concrete temperature reason , on-thespot concrete control and measure , prevention of crack of temperature that crack produce. Key

3、word Concrete Temperature stress Crack Control 1。 The concrete occupies the important position in modern engineering construction。 But today, the crack of the concrete is comparatively general, the cracks are nearly omnipresent in the science of bridge building. Though we take various kinds of measu

4、res in constructing, careful, but the crack still occurs now and then. Tracing it to its cause, it is one of them incompletely that our change to concrete temperature stress pays attention to。 In the large volume concrete, temperature stress and temperature control are significant. This is mainly be

5、cause of the reason of two respects. First of all, concrete often appear the temperature crack in not constructing, influence the globality and durability of the structure。 Secondly, in the course of operating, the temperature change has remarkable influence that cant be ignored on the stress state

6、of the structure。 We meet to construct temperature crack in mainly, so only to origin cause of formation and treatment measure, concrete of crack make a discussion in constructing this text. Reason of a crack Have many kinds of reasons to produce the crack in the concrete, it is mainly the changes o

7、f temperature and humidity, fragility and disparity of the concrete, and the structure is unreasonable, the raw materials is not up to standard (if the alkali aggregate react), the template is out of shape, the foundation does not subside etc. evenly . The cement emits a large amount of heat of hydr

8、ation when the concrete is hardenned, inside temperature is rising constantly, cause the stress of drawing on the surface。 In the course of lowering the temperature , is it congeal foundation pay restrain to mix always later stage, will present the stress of drawing within the concrete . Reducing of

9、 temperature can surface cause heavy stress of drawing very in concrete too. When these draw the stress and go beyond resisting the ability of splitting of concrete , namely will present the crack 。 A lot of inside humidity of concrete change very light or change relatively slow, surface humidity mi

10、ght change heavy the violent change takes placing. Such as maintaining thoroughly, when getting wetter when not doing,contract surface there arent deformation doing, often cause the crack too. The concrete is a kind of fragility material , tensile strength is about 1/10 of the compression strength,

11、is it carry on ones shoulder or back limit when draw out of shape to have *104 only , is it carry on ones shoulder or back limit location when stretch out of shape to there is 104 to add for a long time to add a short time. Because raw materials even, water dust than unstable, transport and build ph

12、enomenon of emanating of course, its tensile strength is not even in the same concrete, a lot of resist the ability of drawing very low, it is apt to present the weak position of the crack。 Among armored concrete , draw stress to undertake by reinforcing bar mainly , concrete bear stress of keeping

13、just. Or reinforcing bar mix if edge position gone to to congeal present the stress of drawing in the structure in plain concrete, must rely on the concrete oneself to bear 。 Require to avoid the stress of drawing or only very small stress of drawing appears of the the general design. But the concre

14、te is cooled from maximum temperature to the steady temperature of operating period in constructing, often cause sizable to draw the stress within the concrete. The temperature stress can exceed other outsides and load the stresses caused sometimes, know change law , temperature of stress for carry

15、on reasonable structural design and construct extremely important. Analysis of 2 temperature stresses Can be divided into following three stages according to the forming process of the temperature stress: (1)It is early: Build concrete is it is it over basically to send out heat to cement to begin ,

16、 generally one one day by oneself. Two characteristics at this stage, first, the cement emits a large amount of heat of hydration, second , mix and congeal the changing sharply of elastic model quantity。 Because of the change of elastic model quantity , form the remaining stress in the concrete in t

17、his period. (2)Middle period: Up till the concrete is cooled until stability temperature from cement send out heat function basically when expiring, in this period, the temperature stress is mainly because the cooling of the concrete and external temperature change cause, these stresses and remnants

18、 stresses that is formed in early days are superposed , mix and congeal the elastic mould amount that goes to and does not change much during this period。 (3)Later period: Operation period after the complete cooling of concrete. Temperature stress whether external temperature change cause mainly, th

19、ese stresses and first two kinds of remnants stresseses are changed and added . Can be divided into two kinds according to the reason why the temperature stress causes: (1)Spontaneous stress: There are not any restraint or totally static structure at the border, if inside temperature is nonlinear di

20、stribution, temperature stress appearing because structure restrains from each other. For example, the body of mound of the bridge, the physical dimension is relatively large, surface temperature is low when the concrete is cooled, inside temperature is high, present the stress of drawing on the sur

21、face, present the stress of pressing in the middle. (2)Restrain the stress: All of the structure ones or it restrain external one some border,cant out of shape and stress not cause not free. Such as case roof beam roof concrete and guardrail concrete。 This two kinds of temperature stresses draw back

22、 stresses caused to act on with the doing of concrete together frequently. It is a more complicated job to want to analyse the distribution , size of the temperature stress accurately according to known temperature。 In case of great majority , need to rely on the model test or the number value to ca

23、lculate。 To is it make temperature stress have sizable limp to creep concrete, at the stress accounting temperature, must consider the influence that creep , calculate concretly that no longer states thinly here。 Control and preventing the measure of the crack of 3 temperature For prevent crack , li

24、ghten temperature stress can from control temperature and is it is it set about to restrain terms from two to improve. The measure of controlling temperature is as follows: (1)Is it improve aggregate grade mix , is it do rigid concrete to spend , mix mixture to adopt, is it guide angry pharmaceutica

25、l or plastification pharmaceutical ,etc. measure in order to reduce cement consumption of concrete to add; (2)Add water or the water to cool the broken stone in order to reduce the temperature of building of the concrete while mixing and shutting the concrete; (3)Reduce the thickness of building whi

26、le building the concrete on hot day, utilize and build the aspect to dispel the heat; (4)Bury the water pipe underground in the concrete, enter the cold water to lower the temperature openly; (5)Stipulate rational form removal time, the temperature keeps warm the surface while lowering suddenly, in

27、case that the rapid temperature gradient takes place in the concrete surface; (6)The concrete with medium and longterm and exposed construction builds a piece of surface or thin wall structure, take the measure of keeping warm in cold season; The measure of improving condition of restraining is: (1)

28、Divide and sew and divide one rationally ; (2)Prevent the foundation from rising and falling too big; (3)Rational arrangement construction process, prevent the too big discrepancy in elevation and side from exposing for a long time; In addition, improve the performance of the concrete and improve an

29、d resist the ability of splitting, strengthen maintenance , prevent the surface from being done and contracted , especially guarantee the quality of the concrete is very important to preventing the crack, should pay special attention to avoiding producing and running through the crack , the globalit

30、y resumed its structure after appearing is very difficult, so should rely mainly on preventing the emergence of the running through crack while constructing。 In construction of concrete , for raise turnover rate of template , demand concrete form removal as soon as possible that build newly often。 S

31、hould consider form removal time properly when concrete temperature is higher than the temperature, so as not to cause the superficial early crack of concrete. Building the early form removal newly, cause very large stress of drawing on the surface, the phenomenon that temperature is assaulted ” app

32、ears. Build initial stage in concrete, because heat of hydration is sent out, the surface causes sizable to draw the stress, surface temperature is also higher than temperature at this moment, remove the template at this moment , surface temperature is lowered suddenly, must cause temperature gradie

33、nt , thus add and draw the stress on the surface , change and add with the heat of hydration stress, in addition, the concrete dries and contracts , the superficial stress of drawing reaches very great number value, have danger of causing the crack, but cover a lightduty heat insulator with on the s

34、urface in time after removing the template , for instance foam sponge ,etc。, for prevent concrete surface from produce the too big stress of drawing, have remarkable results. Add muscle influence to large volume temperature stress of concrete very light , because large volume concrete include muscle

35、 to be rate very much low. Just have influence on the general armored concrete。 On terms that temperature is not very high and the stress is less than limit of surrendering, every performance of the steel is steady, and have nothing to do with stress state , time and temperature。 Line bloated coeffi

36、cient of steel and concrete line bloated coefficient difference very light, take place little internal stress very only between the two while changing in temperature。 Because elastic mould amount of steel concrete elastic mould 715 of quantity, reach as interior concrete stress tensile strength and

37、when fracturing, the stress of the reinforcing bar will not exceed 10000kg/cm2. 。 So is it is it prevent tiny appearance difficulty very much of crack from to make use of reinforcing bar to want among concrete。 But the crack in the structure generally becomes numerous, the interval is little, the wi

38、dth and depth are smaller after adding the muscle。 And if diameter of reinforcing bar detailed and when interval dense, to improve concrete resist result of person who split better. Concrete and surface , armored concrete of structure can take place detailed and shallow crack often, among them the g

39、reat majority belong to and do and draw back the crack. Though this kind of crack is generally all relatively light, it stills have certain influence on the intensity and durability of the structure。 In order to guarantee concrete project quality , prevent fracturing , improve the durability of the

40、concrete, use the admixture to reduce one of the measures that fractures correctly. Whether is it reduce water is it split pharmaceutical to defend , I summarize his main function in practice to use。 (1)There is pore Dao of a large number of mao in the concrete , produce capillary tension in the cap

41、illary after water is evaporated, make concrete is it contract out of shape to do. Increasing the thin aperture of hair can reduce the capillary surface tension , but will make the intensity of concrete reduce . This surface tension theory has already been confirmed in the world as far back as the s

42、ixties。 (2)Water dust than influence important factor that concrete shrink, is it reduce water is it split pharmaceutical can make concrete water consumption reduce by 25% to defend to use. (3)Cement consumption important factor, concrete of person who shrink too, is it add and subtract water is it

43、split concrete reducible 15% of the cement consumption on terms that keep the intensity of concrete of pharmaceutical to defend to mix, its volume is supplemented by increasing aggregate consumption。 (4)Reduce water is it split pharmaceutical can improve consistency of grout , reduce concrete secret

44、e ink to defend, reduce and sink and draw back deforming。 (5)Improve glueing the strength of forming of the grout and aggregate, the concrete improved resists the performance of splitting。 (6)Concrete is it produce stress of drawing to restrain from while shrinking, crack when drawing the stress and

45、 is greater than concrete tensile strength can produce. Reduce water is it split pharmaceutical effective concrete tensile strength of improvement very to defend , improve resisting the performance of splitting of concrete by a wide margin. (7)It can make the concrete density good to add the admixtu

46、re to mix , can improve resisting carbonization of concrete effectively , reduce carbonization to shrink。 (8)Is it reduce water is it split slow coagulation time proper concrete under pharmaceutical to defend , on the basis of preventing the fast water of cement from sending out heat effectively to

47、mix, prevent the plasticity shrink that brings because the cement is not congealed for a long time from increasing。 (9)Mix admixture concrete and getting easy and kind , surface easy to feel flat , form little membrane, reduce the moisture to evaporate, reduce drily and shrink. A lot of admixture al

48、l have the functions of slow coagulation , increasing and apt , improvement plasticity, the experiment that we should carry on in this respect more in the project practice is compared with and studied, than lean against not improving terms more simple,may getting simple and more direct, economy。 Ear

49、ly maintenance of 4 concrete Practice has proved , the common crack of concrete , most is the surface crack of different depth, main reason its whether temperature gradient cause cold temperature of area lower too easy to form crack suddenly. So say the warm keeping of the concrete is especially imp

50、ortant to preventing the early crack of surface. From the viewpoint of temperature stress, should reach and require to keep warm followingly: 1)Prevent concrete internal and external temperature poor and concrete surface gradient from , prevent the surface crack。 2)Prevent concrete from to be ultra

51、and cold , should is it is it make the minimum temperature is not lower than the steady temperature of concrete service time construction time in concrete to try to try ones best。 3)Prevent the old concrete subcooling , in order to reduce the restraint among the old and new concrete。 The early maint

52、enance of the concrete, the main purpose lies in keeping the suitable warm and humid condition , in order to get the result of two respects, on the other hand make the concrete avoid the invasion and attack of the unfavorable and warm , humidity out of shape, the ones that prevent from harmfully are

53、 cold to contract and do to contract。 On one hand make cement water function go on smoothly , is in the hope of reaching the intensity designed and resisting the ability of splitting。 The suitable warm damp condition is interrelated. Mix warm keeping measure paid to congeal often protect wet results

54、 too。 Analyse , water concrete include moisture can meet demand , cement of water have enough and to spare newly theoretically. But because the reason of evaporating etc. often causes losses of the moisture, thus postpone or hinder water of the cement from, the surface concrete receives this kind of

55、 adverse effect easiestly and directly。 Key period when maintained in initial a few days after so the concrete is built, should pay attention to conscientiously in constructing。 Conclusions Construction temperature and relation of crack in concrete the above carry on preliminary discussion of theory

56、 and practice, though the academia has different theories to origin cause of formation and computing technology of the concrete crack, but to concrete prevention and improving the measure suggestion to relatively unify , application in practice result fine too at the same time, concrete to is it obs

57、erve , compare more more by us to want in constructing, analyse more , summarize more after going wrong , combine many kinds of prevention and deal with the measure, the crack of the concrete can be avoided. 2。Quality control of waterproof concrete constructionCombined with experience, from formwork

58、 design, fabrication and installation, assembing reinforoement, pouring and curing of concrete and other aspects construction technology of fairfaced concrete is introduced as well as quality control measures and standards in order to reduce engineering cost to acquire satisfied economic and social

59、benefits。 The factors of influening waterproof- concrete quality are very many Any links does not pay attention to the waterproof concrete of field loss hinders the water function without exception jointly with degree。Engineering construction in the basement adopts secondary form board fabrication a

60、nd installation, reinforced bar fabrication and bind, concrete stirring and mixing system and transport, concrete concrete covibration beat with a stick, construction joint practice, concrete curing and dismantle model and beingready for backfill and so on aspects。These are very critical to quality

61、method to ensure that waterproof concrete self waterproof, and the way of practice has wan out. Method being under construction2.1 Fabrication and InstallationAccording to the concrett of closely knit , demand of reason why to form board since the waterproof also concrete have made and have assemble

62、d corresponding rise is special , be to require that not leaving out thick fluid , firm closely knit block of wood deformation , water absorption Character should be small and ought to give priority to select and using bamboo slab rubber form board or the steel form. Strict control form board room g

63、ap size, necessary exceeding 2 mms uses foam rubber or plastic to squeeze a crack in , porous form board nonutility without exception to board face Be ready for wall post at the same time rotting the prevention and cure job Adopt the cement mortar pouring same ,indicia in before the root segment sti

64、cking the foam rubber or plastic strip , the bottom puts on a cement mortar , concrete a concrete, first 5 cm 10 cm. Since water-proof, concrete structure wall thickness is mostly more infertile .Be to ensure that component geometry dimension , Chang adopt the inside and outside bolt to pull the mea

65、sure meeting attention to, responds to on play receive bolt centre interpose stop water iron plate, to prevent water from forming pilotage passage along bolt leakage.2。2 Assembing reinforoement Waterproof concrete structure has demanding as follows to the reinforced bar 1) reinforced bar should adop

66、t twisted steel as far as possible , increases by hold wrap a force composing in reply a water ability 2) reinforced bars connect should try ones best to adopt to solder connection , stop using and being needless to bind connection to the full3) when binding a reinforced bar, the iron wire head responds to inner bending.4) stri

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!