欢迎来到装配图网! | 帮助中心 装配图网zhuangpeitu.com!
装配图网
ImageVerifierCode 换一换
首页 装配图网 > 资源分类 > DOC文档下载
 

Incoming Inspection

  • 资源ID:38267611       资源大小:200.50KB        全文页数:8页
  • 资源格式: DOC        下载积分:15积分
快捷下载 游客一键下载
会员登录下载
微信登录下载
三方登录下载: 微信开放平台登录 支付宝登录   QQ登录   微博登录  
二维码
微信扫一扫登录
下载资源需要15积分
邮箱/手机:
温馨提示:
用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
支付方式: 支付宝    微信支付   
验证码:   换一换

 
账号:
密码:
验证码:   换一换
  忘记密码?
    
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

Incoming Inspection

Company NameCompany Group, Division, LocationDocument Title: Incoming InspectionDocument Number:Document NumberDocument Filename:Document FilenameCONTROLLED COPY/ MASTER COPYSTAMP HEREOTHERSTAMP HERERevision LevelRevision DateDCO/ECONumberDescription of RevisionRevision AuthorDRAFTDD/MM/YYYY-00000DraftAuthor Name1.00DD/MM/YYYY-00000Initial ReleaseAuthor NameCOMPANY PROPRIETARY AND CONFIDENTIALCompany NameIncoming InspectionCompany Group, Division, LocationDocument NumberRev x.xxDD/MM/YYTable of Contents1.0Purpose32.0Scope33.0Definition Of Terms33.1Goods33.2Production Material33.3Process Material33.4Inspection Criteria34.0Responsibilities34.1Quality Assurance (QA)34.2Shipping/Receiving34.3Engineering35.0References36.0Procedure46.1First Article Inspection (if applicable)46.2Documentation Verification46.2.1Verify Engineer Drawings and Specifications46.2.2Verify Material Identification Label Accuracy46.2.3Verify Certification Receipt and Accuracy46.2.4Verify Markings and Packaging46.2.5Verify Approved Supplier Status46.2.6Verify Receipt Record (RR) Accuracy and Completeness56.2.7Verify Expiration Date56.3Inspect Material56.3.1Material Inspected at the Supplier56.3.2Inspect at Incoming Inspection56.3.3Accept56.3.4Reject56.3.5Release Prior to Inspection56.4Disposition66.4.1Accepted Material66.4.2Rejected Material67.0Flow Chart77.1Incoming Inspection Flow Chart78.0Appendix88.1Guidelines for Writing Inspection Criteria81.0 PurposeThis document establishes an inspection system and documentation requirements for incoming (received) material requiring inspection.2.0 ScopeThis procedure applies to production and process material received at the facilities of Company Name. This procedure also may be applied to other received materials at the discretion of the Purchasing Requisitioner.3.0 Definition Of Terms3.1 GoodsMaterial with utility and/or intrinsic value purchased by, internally produced by, and/or supplied to a company.3.2 Production MaterialMaterial that becomes part of a shippable product.3.3 Process MaterialMaterials that are required in the manufacturing process, but do not become part of the shippable product.3.4 Inspection Criteria The criteria used to inspect and accept or reject production and process material. Inspection Criteria must define the attributes or features to inspect, the sampling plan, and the accept/reject criteria.4.0 Responsibilities4.1 Quality Assurance (QA)Quality Assurance is responsible for the timely inspection of incoming material, and for notifying Inventory when incoming inspection is complete. Quality Assurance is also responsible for determining incoming material Inspection Criteria which are adequate and appropriate for the material being inspected, taking into account recommendations from engineering.4.2 Shipping/Receiving Shipping/Receiving is responsible for all normal receiving activities, including material receipt, creation of a Receipt Record (RR), and location of material requiring inspection at incoming inspection (along with all certifications, test results and other related documentation for the shipment). When material requiring incoming inspection has been received, Receiving moves it to Incoming Inspection.Shipping/Receiving is also responsible for moving and properly locating material after inspection, based on inspection results.4.3 EngineeringEngineering is responsible for recommending key attributes to inspect for all commercial items and customdesigned items released by Engineering.5.0 ReferencesMaterial Review BoardFirst Article InspectionAcceptance Sampling PlansQuality RecordsPart History RecordFirst Article Inspection Data SheetInspect Inquiry for Non-Inventory Parts6.0 ProcedureNote: Before opening any packages and handling material review and follow all handling precautions in the Inspection Criteria for the material.When notified that material that requires inspection has been received, gather relevant documentation for the material, which may include Inspection Criteria, Component Specification, Purchase Order, Vendor History, and Certificate of Compliance or Test. Documentation may be paper or electronic format.6.1 First Article Inspection (if applicable)If first article inspection is required, perform according to the First Article Inspection procedure. See that procedure for guidelines on when to perform first article inspection.If first article inspection is not required, continue with this procedure.6.2 Documentation VerificationBegin an Inspection Report (First Article or Part History Record) for the material. Record Item Number, Item Description, Revision (if applicable), Date Received, Quantity received, Lot Number, Purchase Order (PO) Number, Supplier ID, and Inspection Document(s) and revision. Record the following documentation verification results on the Inspection Report.6.2.1 Verify Engineer Drawings and SpecificationsVerify that the engineering drawings and specifications used for inspection are at the appropriate revision level.6.2.2 Verify Material Identification Label AccuracyCompare the documentation and the material received to the Material Identification Label(s), to assure that each label is accurate. Have Shipping/Receiving correct any label discrepancies.6.2.3 Verify Certification Receipt and AccuracyVerify that material certification was received. Assure that the certification matches the material received. Notify Purchasing immediately if certification is missing or incorrect as required. QA will contact the vendor and request a faxed copy of the certification. Reject material for which certification cannot be obtained.6.2.4 Verify Markings and PackagingVerify all material markings and/or packaging required by the Drawing, Component Specification or Purchase Order.6.2.5 Verify Approved Supplier StatusVerify that the material was purchased from an approved supplier. Verify that manufacturer and manufacturer part number and/or supplier and supplier part number are identical to those listed in the Component Specification.6.2.6 Verify Receipt Record (RR) Accuracy and CompletenessVerify that the attached Receipt Record is accurate and complete.6.2.7 Verify Expiration DateFor material with a finite shelf life, verify that the correct expiration date has been recorded on each package. Record the expiration date on the Part History Report or First Article Inspection Report.6.3 Inspect Material6.3.1 Material Inspected at the SupplierA Company Name onsite inspector or Quality Assurance may inspect and accept material at the supplier prior to shipment to Company Name. Any such material received properly labeled as "Accepted" and accompanied by (or received separately) a completed Part History Record or First Article Inspection Report from the inspector, has passed incoming inspection and need not be reinspected. Go to Disposition of Accepted Material in this procedure to properly disposition material accepted at the supplier.6.3.2 Inspect at Incoming InspectionInspect the material according to its Inspection Criteria.Inspection Criteria are found in the Part History File and may be determined by Quality Assurance and/or Engineering. Randomly select any samples. Record inspection results on the Inspection Report, attaching additional sheets as necessary, and numbering each sheet "Page _ of _.” Highlight any nonconformities.6.3.3 AcceptA shipment of material is accepted if Document Verification is satisfactory, and the material meets or exceeds all of the acceptance criteria in the Inspection Criteria. For sample inspection, acceptance criteria is met if the number or percentage of nonconformities found in the sample is less than or equal to the acceptance number for the sampling plan. Disposition as nonconforming material any sample material found with nonconformities.6.3.4 RejectA shipment of material is rejected if Document Verification is not satisfactory, or if the material does not meet one or more of the acceptance criteria in the Inspection Criteria. For sample inspection, acceptance criteria is not met if the number or percentage of nonconformities found in the sample is greater than or equal to the rejection number for the sampling plan.6.3.5 Release Prior to InspectionIn rare instances, a shipment of material will be needed by production before incoming inspection is complete. At the discretion of the Quality Assurance Director, part or all of the shipment (less samples retained by Quality Assurance for inspection) may be released to production, providing a positive recall system is in place to identify and recover the shipment if it is rejected when inspected. Lot tracing the shipment to all stocking locations and assemblies is one positive recall method.6.4 Disposition6.4.1 Accepted MaterialComplete the Inspection Report and Receipt Record, including quantity accepted, quantity rejected, page numbering. Date, initial, and stamp the report. Attach material certifications to the report if applicable.Status the material "Accepted" by attaching the appropriate material label and making entries in Dataworks.Retain (file) the Inspection Report and the Supplier History Form (ref QualityRecords).Move material to inventory as required. 6.4.2 Rejected MaterialComplete the Inspection Report, including quantity accepted, quantity rejected, NCMR number (see Material Review Board procedure), page numbering, and date and initial the report. Attach material certifications to the report.Complete a manual NCMR form.Status the material "Rejected" by attaching the appropriate material label and making entries in Dataworks.Record the electronic NCMR number (from Dataworks) on the manual NCMR form.Retain (file) the Inspection Report and the Supplier History form (ref Quality Records). Note: Rejected incoming material will be dispositioned by the Material Review Board (MRB). Since the Inspection Report contains information needed by the MRB, to save time, MRB paperwork may be initiated before filing the Inspection Report.Rejected material must be quarantined in the MRB room. 7.0 Flow Chart7.1 Incoming Inspection Flow Chart8.0 Appendix8.1 Guidelines for Writing Inspection CriteriaInspection Criteria are to verify that material meets engineering specifications. Inspection Criteria cannot impose new design requirements or workmanship standards on the material.Engineering and Quality Engineering are responsible for writing Inspection Criteria and to: Select the attributes to be inspected and the sampling plan for each attribute. See Acceptance Sampling Plans for the list of available sampling plans. Select or recommend inspection equipment and conditions. For material that may be damaged by handling or storage during inspection (i.e. static, temperature, or humidity sensitive material, or clean material), handling precautions must be specified. When selecting attributes to inspect, focus attention on key attributes. For example, for a mechanical component, key attributes may be dimensions with the tightest tolerance, or dimensions which interact with mating components. Engineering is responsible for initially recommending attributes to inspect. All product labeling (labels, inserts, physicians manuals, registration cards, etc.) must be, at a minimum, sample inspected. Inspection Criteria for customer supplied or furnished material will be written. Unless Company Name has agreed to provide inspection services for the customer, only customer accepted material will be supplied to Company Name. Therefore, Company Names inspection will consist of checking for shipping damage and verifying proper material identification.Inspection Criteria are documented by one of the following: An Inspection Instruction A Component Specification with an Inspection Criteria section A printout of the current revision of a drawing, markedup to indicate the attributes to inspect and the sampling plan for the attributes. The markedup drawing is created and signed by Engineering and Quality Engineering, and is maintained in the incoming inspection file folder.Document FilenameCOMPANY PROPRIETARY AND CONFIDENTIALPage 7 of 7

注意事项

本文(Incoming Inspection)为本站会员(1888****888)主动上传,装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知装配图网(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!