Incoming Inspection

上传人:1888****888 文档编号:38267611 上传时间:2021-11-06 格式:DOC 页数:8 大小:200.50KB
收藏 版权申诉 举报 下载
Incoming Inspection_第1页
第1页 / 共8页
Incoming Inspection_第2页
第2页 / 共8页
Incoming Inspection_第3页
第3页 / 共8页
资源描述:

《Incoming Inspection》由会员分享,可在线阅读,更多相关《Incoming Inspection(8页珍藏版)》请在装配图网上搜索。

1、Company NameCompany Group, Division, LocationDocument Title: Incoming InspectionDocument Number:Document NumberDocument Filename:Document FilenameCONTROLLED COPY/ MASTER COPYSTAMP HEREOTHERSTAMP HERERevision LevelRevision DateDCO/ECONumberDescription of RevisionRevision AuthorDRAFTDD/MM/YYYY-00000Dr

2、aftAuthor Name1.00DD/MM/YYYY-00000Initial ReleaseAuthor NameCOMPANY PROPRIETARY AND CONFIDENTIALCompany NameIncoming InspectionCompany Group, Division, LocationDocument NumberRev x.xxDD/MM/YYTable of Contents1.0Purpose32.0Scope33.0Definition Of Terms33.1Goods33.2Production Material33.3Process Materi

3、al33.4Inspection Criteria34.0Responsibilities34.1Quality Assurance (QA)34.2Shipping/Receiving34.3Engineering35.0References36.0Procedure46.1First Article Inspection (if applicable)46.2Documentation Verification46.2.1Verify Engineer Drawings and Specifications46.2.2Verify Material Identification Label

4、 Accuracy46.2.3Verify Certification Receipt and Accuracy46.2.4Verify Markings and Packaging46.2.5Verify Approved Supplier Status46.2.6Verify Receipt Record (RR) Accuracy and Completeness56.2.7Verify Expiration Date56.3Inspect Material56.3.1Material Inspected at the Supplier56.3.2Inspect at Incoming

5、Inspection56.3.3Accept56.3.4Reject56.3.5Release Prior to Inspection56.4Disposition66.4.1Accepted Material66.4.2Rejected Material67.0Flow Chart77.1Incoming Inspection Flow Chart78.0Appendix88.1Guidelines for Writing Inspection Criteria81.0 PurposeThis document establishes an inspection system and doc

6、umentation requirements for incoming (received) material requiring inspection.2.0 ScopeThis procedure applies to production and process material received at the facilities of Company Name. This procedure also may be applied to other received materials at the discretion of the Purchasing Requisitione

7、r.3.0 Definition Of Terms3.1 GoodsMaterial with utility and/or intrinsic value purchased by, internally produced by, and/or supplied to a company.3.2 Production MaterialMaterial that becomes part of a shippable product.3.3 Process MaterialMaterials that are required in the manufacturing process, but

8、 do not become part of the shippable product.3.4 Inspection Criteria The criteria used to inspect and accept or reject production and process material. Inspection Criteria must define the attributes or features to inspect, the sampling plan, and the accept/reject criteria.4.0 Responsibilities4.1 Qua

9、lity Assurance (QA)Quality Assurance is responsible for the timely inspection of incoming material, and for notifying Inventory when incoming inspection is complete. Quality Assurance is also responsible for determining incoming material Inspection Criteria which are adequate and appropriate for the

10、 material being inspected, taking into account recommendations from engineering.4.2 Shipping/Receiving Shipping/Receiving is responsible for all normal receiving activities, including material receipt, creation of a Receipt Record (RR), and location of material requiring inspection at incoming inspe

11、ction (along with all certifications, test results and other related documentation for the shipment). When material requiring incoming inspection has been received, Receiving moves it to Incoming Inspection.Shipping/Receiving is also responsible for moving and properly locating material after inspec

12、tion, based on inspection results.4.3 EngineeringEngineering is responsible for recommending key attributes to inspect for all commercial items and customdesigned items released by Engineering.5.0 ReferencesMaterial Review BoardFirst Article InspectionAcceptance Sampling PlansQuality RecordsPart His

13、tory RecordFirst Article Inspection Data SheetInspect Inquiry for Non-Inventory Parts6.0 ProcedureNote: Before opening any packages and handling material review and follow all handling precautions in the Inspection Criteria for the material.When notified that material that requires inspection has be

14、en received, gather relevant documentation for the material, which may include Inspection Criteria, Component Specification, Purchase Order, Vendor History, and Certificate of Compliance or Test. Documentation may be paper or electronic format.6.1 First Article Inspection (if applicable)If first art

15、icle inspection is required, perform according to the First Article Inspection procedure. See that procedure for guidelines on when to perform first article inspection.If first article inspection is not required, continue with this procedure.6.2 Documentation VerificationBegin an Inspection Report (

16、First Article or Part History Record) for the material. Record Item Number, Item Description, Revision (if applicable), Date Received, Quantity received, Lot Number, Purchase Order (PO) Number, Supplier ID, and Inspection Document(s) and revision. Record the following documentation verification resu

17、lts on the Inspection Report.6.2.1 Verify Engineer Drawings and SpecificationsVerify that the engineering drawings and specifications used for inspection are at the appropriate revision level.6.2.2 Verify Material Identification Label AccuracyCompare the documentation and the material received to th

18、e Material Identification Label(s), to assure that each label is accurate. Have Shipping/Receiving correct any label discrepancies.6.2.3 Verify Certification Receipt and AccuracyVerify that material certification was received. Assure that the certification matches the material received. Notify Purch

19、asing immediately if certification is missing or incorrect as required. QA will contact the vendor and request a faxed copy of the certification. Reject material for which certification cannot be obtained.6.2.4 Verify Markings and PackagingVerify all material markings and/or packaging required by th

20、e Drawing, Component Specification or Purchase Order.6.2.5 Verify Approved Supplier StatusVerify that the material was purchased from an approved supplier. Verify that manufacturer and manufacturer part number and/or supplier and supplier part number are identical to those listed in the Component Sp

21、ecification.6.2.6 Verify Receipt Record (RR) Accuracy and CompletenessVerify that the attached Receipt Record is accurate and complete.6.2.7 Verify Expiration DateFor material with a finite shelf life, verify that the correct expiration date has been recorded on each package. Record the expiration d

22、ate on the Part History Report or First Article Inspection Report.6.3 Inspect Material6.3.1 Material Inspected at the SupplierA Company Name onsite inspector or Quality Assurance may inspect and accept material at the supplier prior to shipment to Company Name. Any such material received properly la

23、beled as Accepted and accompanied by (or received separately) a completed Part History Record or First Article Inspection Report from the inspector, has passed incoming inspection and need not be reinspected. Go to Disposition of Accepted Material in this procedure to properly disposition material a

24、ccepted at the supplier.6.3.2 Inspect at Incoming InspectionInspect the material according to its Inspection Criteria.Inspection Criteria are found in the Part History File and may be determined by Quality Assurance and/or Engineering. Randomly select any samples. Record inspection results on the In

25、spection Report, attaching additional sheets as necessary, and numbering each sheet Page _ of _.” Highlight any nonconformities.6.3.3 AcceptA shipment of material is accepted if Document Verification is satisfactory, and the material meets or exceeds all of the acceptance criteria in the Inspection

26、Criteria. For sample inspection, acceptance criteria is met if the number or percentage of nonconformities found in the sample is less than or equal to the acceptance number for the sampling plan. Disposition as nonconforming material any sample material found with nonconformities.6.3.4 RejectA ship

27、ment of material is rejected if Document Verification is not satisfactory, or if the material does not meet one or more of the acceptance criteria in the Inspection Criteria. For sample inspection, acceptance criteria is not met if the number or percentage of nonconformities found in the sample is g

28、reater than or equal to the rejection number for the sampling plan.6.3.5 Release Prior to InspectionIn rare instances, a shipment of material will be needed by production before incoming inspection is complete. At the discretion of the Quality Assurance Director, part or all of the shipment (less sa

29、mples retained by Quality Assurance for inspection) may be released to production, providing a positive recall system is in place to identify and recover the shipment if it is rejected when inspected. Lot tracing the shipment to all stocking locations and assemblies is one positive recall method.6.4

30、 Disposition6.4.1 Accepted MaterialComplete the Inspection Report and Receipt Record, including quantity accepted, quantity rejected, page numbering. Date, initial, and stamp the report. Attach material certifications to the report if applicable.Status the material Accepted by attaching the appropri

31、ate material label and making entries in Dataworks.Retain (file) the Inspection Report and the Supplier History Form (ref QualityRecords).Move material to inventory as required. 6.4.2 Rejected MaterialComplete the Inspection Report, including quantity accepted, quantity rejected, NCMR number (see Ma

32、terial Review Board procedure), page numbering, and date and initial the report. Attach material certifications to the report.Complete a manual NCMR form.Status the material Rejected by attaching the appropriate material label and making entries in Dataworks.Record the electronic NCMR number (from D

33、ataworks) on the manual NCMR form.Retain (file) the Inspection Report and the Supplier History form (ref Quality Records). Note: Rejected incoming material will be dispositioned by the Material Review Board (MRB). Since the Inspection Report contains information needed by the MRB, to save time, MRB

34、paperwork may be initiated before filing the Inspection Report.Rejected material must be quarantined in the MRB room. 7.0 Flow Chart7.1 Incoming Inspection Flow Chart8.0 Appendix8.1 Guidelines for Writing Inspection CriteriaInspection Criteria are to verify that material meets engineering specificat

35、ions. Inspection Criteria cannot impose new design requirements or workmanship standards on the material.Engineering and Quality Engineering are responsible for writing Inspection Criteria and to: Select the attributes to be inspected and the sampling plan for each attribute. See Acceptance Sampling

36、 Plans for the list of available sampling plans. Select or recommend inspection equipment and conditions. For material that may be damaged by handling or storage during inspection (i.e. static, temperature, or humidity sensitive material, or clean material), handling precautions must be specified. W

37、hen selecting attributes to inspect, focus attention on key attributes. For example, for a mechanical component, key attributes may be dimensions with the tightest tolerance, or dimensions which interact with mating components. Engineering is responsible for initially recommending attributes to insp

38、ect. All product labeling (labels, inserts, physicians manuals, registration cards, etc.) must be, at a minimum, sample inspected. Inspection Criteria for customer supplied or furnished material will be written. Unless Company Name has agreed to provide inspection services for the customer, only cus

39、tomer accepted material will be supplied to Company Name. Therefore, Company Names inspection will consist of checking for shipping damage and verifying proper material identification.Inspection Criteria are documented by one of the following: An Inspection Instruction A Component Specification with

40、 an Inspection Criteria section A printout of the current revision of a drawing, markedup to indicate the attributes to inspect and the sampling plan for the attributes. The markedup drawing is created and signed by Engineering and Quality Engineering, and is maintained in the incoming inspection file folder.Document FilenameCOMPANY PROPRIETARY AND CONFIDENTIALPage 7 of 7

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!