1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .香丽高速公路第7合同段工程项目 冲孔灌注桩施工方案 香丽高速公路第7合同段上补洛大桥冲孔桩基施工方案编 制 人:_审 核 人:_批 准 人:_

24、实施日期:_单位名称:云南建工第四建设有限公司 香丽高速第7合同段一工段项目经理部 编制日期:2015.9.23目录第一章、编制依据及原则4编制依据4编制原则4第二章、工程概况52.1、设计概况52.2、施工自然、地质条件52.2.1、地质条件62.2.2、气候、水文8第三章、冲孔灌注桩施工工艺73.1、施工准备83.1.1现场准备83.1.2、机械准备83.1.3、劳动力计划93.1.4、材料准备93.1.4、进度计划11 3.2、施工工艺流程图123.3、冲孔桩基施工工艺及工序133.3.1、桩基测量定位133.3.2、泥浆池和沉淀池分布原则133.3.3、埋设护筒133.3.4、成孔施工

25、方法133.3.5、清孔153.3.6、测沉渣153.3.7、安放钢筋笼153.3.8、下灌注导管173.3.9、水下砼灌注173.3.9、施工发生的异常情况和处理防治措施19第四章、质量、安全、文明施工204.1、质量保证措施204.1.1、质量检验程序图204.1.2、工程质量控制指标、检验频率及检验办法214.1.3、分项工程报验程序214.2、材料质量保证措施214.3、桩基主要施工危险源及应对措施224.4、冲孔灌注桩施工中相关机械、人员安全操作规程254.4.1、桩机安全操作规程254.4.2、装载机安全操作规范264.4.3、钢筋弯曲机操作规范274.4.4、电气焊工及设备安全操

26、作规范284.4.5、电焊机安全操作规范294.4.6、氧气乙炔安全使用规程304.4.7、钢筋笼制作及吊装安全操作规程324.4.8、混凝土灌注过程安全操作规程344.5、施工用电安全354.6 、雨季施工技术措施364.6.1、雨季施工部署364.6.2、雨季施工技术措施364.6.3、雨季施工作业安全用电防护措施37第一章 编制依据及原则1.1 编制依据(1)、香丽高速公路第7标段两阶段施工图设计;(2)、我国现行公路、桥涵工程施工规范及质量检验评定标准; 、公路桥涵施工技术规范JTJ041-2000; 、公路施工手册桥涵(上册);、公路工程集料试验规程-JTJ085-2000; 、公路

27、工程质量检验评定标准-JTJ071-98;、钢筋焊接及验收规范-JTJ18-96;、建筑桩基技术规范(JGJ 94-2008) 、公路工程技术标准(JTG B01-2014) 、云南省高速公路施工标准化实施要点第1册工地建设 、云南省高速公路施工标准化实施要点第2册工程施工(3)、现场实际情况和通过调查所掌握的有关资料信息。 (4)、我公司的综合实力、机械设备能力、技术力量和类似工程建设的经验。1.2 编制原则(1)、严格遵循招标、投标文件的内容及设计文件要求,确定本工程的创优规划,并据此来编制施工组织设计。 (2)、仔细考察工程实地,认真研究招标、投标文件、设计图纸和有关规定,充分考虑本桥的

28、特点、场地、交通、水文、运输、料源、民情、水电供应、气候等实际情况的基础上编制。4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate docu

29、mentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application ther

30、e shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 200

31、21980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating rang

32、e must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount deter

33、mines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of t

34、he interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 2

35、0021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a sepa

36、rate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification

37、documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format.

38、Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency a

39、cknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .云南建工第四建设有限公司 37 / 38GUANGXI ROAD & BRIDGE CORP第二章 工程概况1、工程概况上补落大桥(K68+010)位于香格里拉至丽江高速公路SJ1合同段,设计为双向四车道左右分离式桥梁,桥面宽度为12m,设计速度

40、80Km/h,汽车荷载标准:公路一级,地震动峰值加速度:0.3g,地震基本烈度度:8度。本桥为跨越山谷而设,最高主墩108m,主跨为连续刚构,是本合同段的控制性工程之一。大桥左幅桥梁全长429m,起点桩号:K67+796,终点桩号:K68+225,桥跨布置为:(229)m连续T梁+(83+150+83)m连续刚构+(225.8)m连续T梁。右幅桥梁全长472m,起点桩号:K67+759,终点桩号:68+231,桥跨布置为:(330)m连续T梁+(83+150+83)m连续刚构+(230)m。上补洛大各桥墩及左幅丽江台下部基础设计为孔桩基础,桩基按摩擦桩设计。主桥墩设计桩基础为群桩基础,地形位置

41、较平整,桩长分42m、44m两种,引桥位于两侧山谷坡上,地形较陡,设计桩长较短,分别为13m、15m、19m、21m、22m,由于受地形限制及结合桩长情况,主墩桩基较深,位于河坝渗水丰富,采用冲孔桩,其它桩基较短,位于山坡地形,适合采用人工挖孔桩。2、施工自然、地质条件2.1自然条件工区内属受季风影响的大陆性高原气候,气候特征表现为干湿季节分明,垂直变化显著,山区气温较低,金沙江河谷两岸较炎热;年、日气温变化均大,年内最高温度在金沙江河谷地区,高达30(6月)以上,高山地区最低温度为-30(12月),并发育现代山岳冰川;根据气候的垂直差异,可分为高山寒带与山地温带、河谷亚热带三个垂直气候带,海

42、拔20002500米的山地温带年平均气温为12.913.5,降雨量894.6927.4毫米,蒸发量2177.12399.9毫米,相对湿度63.669.3%;2500米以上的高山寒带11月次年5月为雪季,气温一般为-12-25,79月为雨季,平均降雨量为617.6毫米,49月间时有冰雹袭击,气候较恶劣;2000米以下的河谷亚热带气候炎热,年平均气温18,降雨量较少,一般700毫米以下。2.2地质构造桥位地处山地斜坡中下部,属构造侵蚀、溶蚀中山地貌区,地形相对较陡,植被茂密,桥位处地质作用以流水冲蚀、重力、风化作用为主。综合地质调绘、物探及钻探资料,场地岩土构成自上而下分述如下。1)、覆盖层场区地

43、表覆盖层主要为第四系冲积层块石土、第四系残坡积块石土、第四系残坡积碎石土,现分别叙述如下:第四系冲积层块石土:灰黄色、灰褐色,稍湿,中密,块石成分以板岩为主,由碎石和粉质黏土充填。承载力基本容许值550kpa,摩阻力标准值180kpa;第四系残坡积块石土:浅灰绿色,湿,密实,块石成分以玄武岩、板岩为主,由碎石圆砾充填,承载力基本容许值650kpa,摩阻力标准值200kpa;第四系残坡积碎石土:灰黄色、黄褐色,稍密,碎石以板岩为主,由粉质黏土及角砾充填。承载力基本容许值350kpa,摩阻力标准值120kpa;第四系残坡积碎石土:灰黄色、黄褐色,中密,碎石以板岩为主,由粉质黏土及角砾充填。承载力基

44、本容许值450kpa,摩阻力标准值160kpa;2)、基岩场区下伏基岩按岩体节理裂隙发育及风化程度分为三叠系上统、强风化板岩、三叠系上统中风化板岩。 三叠系上统、强风化板岩:灰褐色,强风化,泥质胶结,变余结构,板状构造,节理裂隙发育,多呈碎石状,承载力基本容许值500kpa,摩阻力标准值140kpa。 三叠系上统中风化板岩:灰褐色,中风化,泥质胶结,变余结构,板状构造,薄中层状,多呈碎石状。承载力基本容许值700kpa,摩阻力标准值160kpa。 3、施工交通、用水、用电 3.1、施工交通 原有村公路可直接到达施工现场,可满足材料、设备运送,交通较为方便。施工场地内沿线路走向修筑施工便道通至每

45、个墩台,便道过河在河道上搭设贝雷桥。 3.2、工程用水、用电 3.2.1、工程用水 在施工现场有小河从所设计桥下通过,雪山融水,常年不断,河水清澈干净,可保证施工现场用水,施工用水可考虑在河道边修筑施工用水水池。 3.2.2、施工用电 长远施工用电架设施工动力专用输电线路进入施工现场;由于供电线路还没有开始架设,现在施工在即,为满足施工用电需要,先前桩基施工采用柴油发电机发电,根据12台冲孔机即配套设备、钢筋笼加工等计算用电量,需配备2台500KW的柴油发电机供急用以及以后施工备用。第三章 冲孔灌注桩施工工艺3.1 施工准备3.1.1施工准备1)、调查现场及周边地区,对设计提供的地质、水文、气

46、象资料进行复核,复核施工图纸的桩位、高程及桥梁跨径、桥台位置与地形是否一致。2)、所需用机械设备及施工人员、辅助人员全部到位,机械设备性能良好,能满足施工需要。3)、根据设计要求结合实际情况,编制冲孔灌注桩单项施工组织设计,向施工技术人员进行一级技术交底及安全交底,向班组和民工个人进行详细的二、三级技术、安全、操作交底。确保施工过程中的质量及人身安全。4)、平面高程测量,由测量人员根据设计图纸放样定位确定各孔桩位置及场地平整高度。 5)、钻孔场地进行杂物清除、换除软土、平整压实,周围设置排水措施。3.1.2机械设备配备序号机械设备名称规格型号单位数量总功率(KW)1冲孔灌注桩桩机台122挖掘机

47、PC210台1117 KW3钢筋切断机台14电焊机台25气割设备套16砼搅拌机台17发电机台2500KW8电焊机500A台53.1.3、劳动力组织序号名 称人数工 作 范 围1桩机组长4桩机操作2桩机技术工2桩机行走、定位3电焊工2钢筋焊接4机械修理工1机械保养和维修5砼工8砼拌制及浇灌6钢筋工6钢筋笼加工安装7电工1施工用电线路搭设和连接8测量工1放轴线和桩位9工长1现场指挥、生产计划安排合计283.1.4、材料准备序号名称型号单位数量备注1钢筋28t602钢筋16t33钢筋10t104混凝土C30m3500商供3.1.5施工进度计划 上补洛大桥主墩(左幅3、4号墩,右幅4、5号墩)地势平坦

48、且靠近河道,地下渗水丰富,设计桩长42m、44m两种,适宜机械成孔。全桥共计冲孔桩基45根,合计1908延长米,桩径200cm。根据总工期安排需要,每个墩按排3台冲孔桩机,12台冲孔桩基同时作业。工期按排如下:施工准备时间:2015.11.012015.11.15左幅3#墩19号桩基施工时间: 2015.11.202016.02.10左幅4#墩112号桩基施工时间: 2015.11.162016.02.10右幅4#墩112号桩基施工时间: 2015.11.162016.02.10右幅5#墩112号桩基施工时间: 2015.11.162016.02.103.2、施工管理人员组织3.2.1、组织机

49、构设置根据组织机构设置的目的和原则,结合我公司的有关规定,充分考虑本工程的实际情况,结合类似工程的施工经验,按照现代项目法施工原则组建“云南建工第四建设有限公司香丽高速第7合同段一工段项目经理部”。选聘技术水平高、施工管理经验丰富的人员组成经理部决策层和管理层,负责本合同工程的实施;从公司抽调具有或类似公路施工和管理的工程技术人员和技术工人,按专业组建施工队伍承担本合同工程项目的施工任务。项目经理部作为公司的派出机构,全权负责在施工现场按合同要求组织工程的实施,按期优质完成本工程任务,对业主负责。项目经理部设“七部一室”,下设上香丽高速补洛大桥专业施工队。人工挖孔桩施工管理组织机构图项目经理:

50、白新华施工负责人:技术负责人:金宪应施工组组长: 质检、安全组组长: 材料、设备组组长: 人工挖孔桩施工队伍3.2.2、管理及施工、技术检测人员安排上补洛大桥梁人员安排如下: 施工负责人施工技术总负责人质量负责人试验负责人安全工程师机械设备负责人材料保障负责人协调保障负责人后勤保障负责人技术实施质量检测测量控制试验检测现场主要施工员管理、实施、控制、检测人员共计 人3.3施工工艺流程图施 工 准 备基桩轴线控制点及水准基点设置场地清障/平整/加固桩机进场/安装/调试回灌冲洗液稳定孔内水头/泥浆性能调整对护筒进行中间验收制 作 钢 筋 笼桩 位 放 样埋 设 护 筒桩机对位调平冲、钻 进 成 孔

51、第一次清孔测沉渣终 孔 验 收吊放钢筋笼/焊接灌注混凝土/初灌量控制/剪球/灌注/拔管/至施工的桩顶第二次清孔测沉渣卸导管料斗/起护筒转移桩机至下一个桩位钢筋笼质量检查制 作 泥 浆设置泥浆池/沉淀池/循环槽/安装泥浆泵制作混凝土试块/养护拌 制 混 凝 土水泥/砂/石等材料进场,送检及配合比试验钢筋进场/材料及试件送检安放导管及球塞对持力层岩土验样测定混凝土坍落度测定各段混凝土顶面高度及控制拔管高度3.4施工工艺及工序3.4.1 桩基测量定位 场地平整完成后由测量人员根据设计图纸精确放样孔桩中心桩位,并设置护桩以便施工过程中检查钻孔中心,护桩用水泥砂浆固定。并现场做好各孔桩位置标示牌,详细记

52、录各孔编号及需冲孔深度。3.4.2 泥浆池设置在靠近线路沿小河沟下游侧施工红线内挖6米长,5米宽,2米深的泥浆池,选择和备足良好的造浆粘土或膨润土,造浆量为2倍桩的混凝土体积,泥浆比重可根据钻进不同地层及时进行调整。3.4.3 埋设护筒护筒采用8mm厚的钢板加工制成,护筒内径比桩径大20cm,护筒上部开设一个溢浆孔;校核桩位中心后,在护筒四周用黏土分层回填夯实,护筒采用人工挖埋及锤击方法埋设,护筒上部高出地下水位或孔外最高水位1.5米以上,并高出地面0.3米。护筒埋置深度符合下列规定:黏性土不小于1m,砂类土不小于2m。当表层土松软时将护筒埋置到较坚硬密实的土层中至少0.5m。护筒顶面中心与设

53、计桩位偏差不大于3cm,倾斜度不大于1%。3.4.4、钻机调试、就位钻机就位前由专业人员对钻机进接电检查并调试,调试完成后进行钻机就位。安装钻机时用枕木、木板把钻机底部垫平,保持钻机稳定,不得产生位移和沉陷,钻头在护筒中心偏差不得大于30mm。钻机就位完成后由测量人员对钻头中心进行检查。3.4.5钻孔施工1)泥浆制备: 冲击成孔使用高比重、高粘度泥浆护壁和浮渣,也可直接向孔内投入粘土或泥球护壁。泥浆性能主要参数为:项目比重粘度PH值胶体率含砂率选用参数1.151828s7995%成孔时2%清孔时0.5%本场地粘土层比较厚所以可采用自然造浆的办法,在自然造浆不够用的情况下可以从外拉进较粘的黄土进

54、行造浆,并定期检测泥浆的性能,认真做好泥浆性能的维护调整,及时清理泥浆循环系统的沉渣和废浆。2) 冲击成孔、开孔阶段:开始时用小冲程密击,锤高0.40.6m,并及时加片石,砂砾石和粘土泥浆护壁,孔深不足34m时,不宜捞渣,应尽量使钻渣挤入孔壁。捞渣筒的直径宜选择桩孔直径50%70%。、钻进过程:钻进过程中,勤松绳和适量松绳,不得打空锤;勤抽碴,使钻头经常冲击新鲜地层。每次松绳量按地质情况、钻头形式、钻头重量决定。如护筒外侧土质松软发现漏浆时,可提起钻锥,向孔中倒入粘土,再放下钻锥冲击,使胶泥挤入孔壁堵住漏浆孔隙,稳住泥浆继续钻进。孔深达护筒下34m后,加快速度,加大冲程,将锤提高至1.52.0

55、m以上,每钻进0.51.0m应捞渣一次,每次捞渣 45筒为宜。在卵石、漂石层进尺小于5cm/h,在松散地层进尺小于15 cm/h时,应及时捞渣,减少钻头的重复破碎现象。、在钻进过程中每12m要检查一次孔的垂直度。如发现偏斜应立即停止钻进,采取措施进行纠偏。对于变层处和易于发生偏斜的部位,应采用低锤轻击,间断冲击的办法穿过,以保持孔形良好。、每钻进2m或地层变化处,在泥浆槽中捞取钻渣样品,查明土类并记录,及时排除钻渣并置换泥浆,使钻锥经常钻进新鲜地层。同时注意土层的变化,在岩、土层变化处均须捞取渣样,判明土层并记入记录表中以便与地质剖面图核对。、开始前调制足够数量的泥浆,钻进过程中,如泥浆有损耗

56、、漏失,予以补充。并按泥浆检查规定,按时检查泥浆指标,遇土层变化增加检查次数,并适当调整泥浆指标。、 每次捞渣后,应及时向孔内补充泥浆或粘土,保持孔内水位高于地下水位1.52.0m。泥浆循环系统示意图、终孔条件 a:桩终止锤击的控制应视桩端土质而定,一般情况下以桩端设计标高为主,实际钻孔深度应与设计深度基本相符,若相差太大应征得设计部门认可方可终孔。 b:终孔时桩进尺速度(贯入度)应符合要求,且进尺速度应对应于一定的锤重和标高。3.4.6检孔钻孔完成后,用检孔器进行检孔。孔径、孔垂直度、孔深检查合格后,再移走钻机,否则重新进行扫孔。3.4.7清孔清孔的目的是使孔底沉碴、泥浆相对密度、泥浆中含钻

57、渣量等指标符合规范要求,钻孔达到要求深度后采用灌注桩孔径监测系统进行检查,各项指标符合要求后立即进行清孔。捞渣清孔是冲孔桩常用的一种清孔方法,清孔过程应边捞渣边向孔内注水,并保持孔内水头高度1.52.0m,防止发生塌孔事故,并应随时观测孔底沉渣厚度和观测冲洗液含渣量,当冲洗液含渣量小于4%时,孔底沉渣厚度小于300mm即可停止清孔。3.4.8测沉渣测沉渣使用的工具:测锤(直径130150mm,高度180200m,质量35),水纹测绳.测沉渣方法:沉渣厚度以钻头或圆锥底部中点标高为测量起点。3.4.9安放钢筋笼 钢筋笼的制作:钢筋笼下料,应按规范要求,钢筋连接采用电弧焊,双面焊接5d,单面焊接为

58、10d。焊接时焊口必须符合规范规定,布筋成型时焊接处应按规范错开(同一截面内的接口不得超过总数50%)。加劲箍筋焊接成闭合的圆箍,且应设在钢筋的内侧,每与纵向钢筋的交接点全部焊接牢固,以便其真正起到加劲钢筋的作用,使钢筋笼在运吊中避免产生不可恢复的变形。螺旋箍在纵向钢筋的外侧,其焊接应均匀,间隔距离符合设计和规范要求。控制平整度误差不超过20mm,钢筋笼外形尺寸比护壁内径小12cm。钢筋笼成型后应经有关人员验收合格后方可安装。吊装钢筋笼的桩孔,应预先清理干净,并标出定高度。钢筋笼入孔后,应按其保护层厚度要求调正固定,使其在捣桩芯砼时,不移动,不上浮。焊接质量要求:、焊缝长度不应小于搭接长度,焊

59、缝高度h0.3d,并不得小于4mm;焊缝宽度b0.7d,并不得小于10mm。、焊缝表面平整,不得有较大的凹陷、焊瘤。、接头处不得有裂纹。、焊接过程中及时清渣,加强焊缝应平缓过渡,弧坑应填满。钢筋笼制作成型后采用现场吊车运至对应桩位进行吊装就位。若钢筋笼太长可分段制作安装,每段长度不大于10米,自重不大于1.3t。根据吊车起重性能,其最远(50米)吊载能力为1.32t,满足起重要求。局部吊车覆盖不到的桩位则利用桩机自身的吊机(起重能力为3t)吊运钢筋笼。将钢筋笼对中缓慢放到设计标高和中心位置,采取固定措施,待桩身砼灌注完毕,砼达到初凝后即可解除钢筋笼的固定措施。3.4.10下灌注导管 1)导管的

60、选用和连接a、导管的选用:导管直径(mm)初灌埋深(m)连续灌注埋深(m)桩顶部灌注埋深(m)2501.261.2 b、导管用法蓝连接;法蓝连接需装密封胶垫和“0”型 密封圈,胶垫厚度为5mm,“0”型密封圈直径为5mm,法盘与导管连接应加焊三角形加劲板,防止法蓝盘挂住钢筋笼。 2) 导管的下放a、导管的下放是利用桩机自带的卷扬机进行吊装。开始灌注时,导管下到距孔底4080左右b、钢筋笼安装完成后必须进行二次清孔,其原理和方法与第一次相同。直至经施工员,监理或甲方检测孔深和沉渣均达到设计要求并同意灌注后再进行下一道工序施工。3.4.11水下砼灌注 水下混凝土浇注方法:桩基水下混凝土采用集中拌和

61、,混凝土搅拌罐车运输和混凝土输送泵输送,用吊车或卷杨机提升导管。 混凝土原材料质量及配合比符合规范要求。 作业场地整洁,各项材料储量满足施工要求。 搅拌站、搅拌罐车、输送泵、电力设施调试正常,且有备用,劳动力分工明确,保证混凝土浇注的连续。 浇注前检查孔底沉渣、泥浆指标,符合规范及设计要求后方可浇注水下混凝土。 隔水球用8#铁丝悬挂于导管内泥浆面上约530,在导管中的隔水球的上部先灌入同设计砼标号的水泥砂浆0.20.3m3和约2m3的砼,使管内的隔水球上方所受的重力较大,以便剪断铁丝后隔水球在导管下行顺畅,不易被卡住。 首批混凝土数量必须且能满足导管首次埋深(1.2m)和填充导管底部的需要。混凝土利用搅拌运输罐车运输至料斗进行灌注。 首批混凝土下落后,将连续浇注。浇注过程中注意保持孔内水头,并以测绳勤测孔内混凝土面位置,及时调整导管埋深,使之埋置深度控制在1.0 m和填充导管底部间隙的

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!