外研版必修3模块六readingppt课件(21)
《外研版必修3模块六readingppt课件(21)》由会员分享,可在线阅读,更多相关《外研版必修3模块六readingppt课件(21)(21页珍藏版)》请在装配图网上搜索。
1、Readingthe Map of the Three Gorges DamThree Gorges DamThe Three Gorges Dam is a hydroelectric dam that spans跨越跨越 the Yangtze River by the town of Sandouping,located in the Yiling District of Yichang,in Hubei province,China.The Three Gorges Dam is the worlds largest capacity容量容量 hydroelectric power s
2、tation with a total generating capacity of 18,200 MW.The dam body was completed in 2006.megawatt 百万瓦特百万瓦特 Look at the map and complete the following tasks.1)Find the area which is to be flooded in the map and circle it.2)Mark out the site of the Three Gorges Dam.Area to be floodedThree Gorges Dam Co
3、nstruction SiteThree Gorges Dam Construction SiteStill Life (Sanxia Haoren)by Jia Zhangke,a poetic film about the construction of Chinas Three Gorges Dam,wonGolden Lion for Best Film at the 63rd Venice Film Festival.威尼斯金狮奖威尼斯金狮奖Before-reading(page 52)Decide if the sentences are true or false.1.Carvi
4、ngs are made by animals.2.Construction is another word for building.3.Relics are things that were made in the last 100 years.4.Site is another word for location.5.A temple is a place of great importance to Buddhists.FTFTTFast-readingRead the text carefully,match the paragraphs with their general ide
5、as.Para.1Para.2Para.3Para.4Para.5advantages disadvantages brief introductionCareful-readingRead the passage again and write questions for the answers.(p 53)1.Why _?To control flooding and provide hydro-electric power.2.How high _?Two hundred meters.was the Three Georges Dam builtis the Dam3.How _?On
6、e and a half kilometers.4.Who _?Sun Yat-sen.wide is the Damfirst suggested the idea5.How much _?Three quarters.6.How many _?Four thousand.of Chinas energy is produced by burningvillages were flooded when the dam was coalbuiltWhat do you think of the advantages and the disadvantages of building the T
7、hree Georges Dam?Discussion The Advantages of Three Gorges Dam1)Benefit to flood control.2)Output of plant is great.3)Navigation航海航海 benefit is obvious.4)Drought relief解除,减轻解除,减轻 function is great.The Disadvantages of Three Gorges DamA total of 1.24 million people had to move to different places because their homes were flooded by the dam.A large amount of animal habitat栖息地栖息地 will also be destroyed.A lot of silt(泥沙泥沙,淤泥淤泥)that is carried by the river will be trapped in the reservoir.Led to various economic and environmental issues.
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。