南水北调东线第一期工程临清市汇通河截污导流工程水土保持监测报告书



《南水北调东线第一期工程临清市汇通河截污导流工程水土保持监测报告书》由会员分享,可在线阅读,更多相关《南水北调东线第一期工程临清市汇通河截污导流工程水土保持监测报告书(54页珍藏版)》请在装配图网上搜索。
1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia
2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements
3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the
4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi
5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli
6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar
7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc
8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated
9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc
10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher people's Government or the developme
11、nt and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent ...Pig is not
12、 a pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost
13、and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production a
14、nd consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industry's annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced
15、 6.52 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International
16、pig industry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from China's meat consumption habits and economic analysis of the development situation, t
17、he emergence of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central a
18、nd Western bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requi
19、rements. Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and oth
20、er marketing methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important "River pig" resource market, the city's commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international re
21、putation is high. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year aroun
22、d 18 million, about 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported.
23、 It is predicted that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease ... 前 言 1 1编制依据 3 1.1法律法规文件 3 1.2规范性文件依据 4 1.3技术
24、标准依据 4 1.4技术资料及其批复文件依据 5 2项目及项目区概况 1 2.1项目概况 1 2.1.1 工程布局 1 2.1.2 工程建设内容及设计 3 2.2项目区概况 5 2.2.1地理位置 5 2.2.2气候气象 6 2.2.3地形地貌 6 2.2.4土壤 6 2.2.5植被 7 2.2.6水文地质 7 2.2.7社会经济状况 8 2.2.8水土流失与水土保持状况 8 2.3 项目区水土保持防治体系 9 2.3.1 水土保持防治目标 9 2.3.2水土保持措施布局 10 2.3.3水土保持主要建设内容及工程量 10 2.3.4水土保持方案实施进度计
25、划 11 3监测实施 12 3.1监测目标与原则 12 3.1.1水土保持动态监测目标 12 3.1.2水土保持动态监测原则 12 3.2监测工作实施情况 14 4监测内容与方法 16 4.1监测任务 16 4.2监测范围及监测重点 16 4.3监测内容 16 4.4监测点布设 17 4.5监测方法和频次 18 4.5.1监测方法 18 4.5.2监测时段及频次 19 4.6调查监测仪器及具体方法 20 4.6.1 调查监测仪器 20 4.6.2调查监测的具体方法 20 5不同侵蚀单元侵蚀模数的分析确定 23 5.1侵蚀单元划分 23 5.2各侵蚀单元侵蚀
26、模数 23 5.2.1原地貌侵蚀模数 23 5.2.2施工过程中各地表扰动类型侵蚀模数 23 5.2.3防治措施实施后侵蚀模数 25 6水土流失动态监测结果与分析 25 6.1防治责任范围动态监测结果 25 6.2弃土弃渣动态监测结果 26 6.2.1设计弃土弃渣情况 26 6.2.2实际弃渣量及占地面积监测结果 26 6.3 土壤流失量动态监测结果 27 6.4 监测点土壤物理性状监测结果 27 6.5水土流失危害监测结果与分析 29 7水土流失防治动态监测结果 30 7.1水土流失防治措施 30 7.1.1工程措施 30 7.1.2植物措施 31 7.2水土
27、流失防治效果动态监测结果 32 7.2.1扰动土地整治率 32 7.2.2水土流失总治理度 32 7.2.3拦渣率 32 7.2.4土壤流失控制比 33 7.2.5林草植被恢复率 33 8 监测结论 35 8.1结论 35 8.1.1水土保持分类分级评价 35 8.1.2水土保持治理达标评价 36 8.1.3监测工作中的经验 37 8.2建议 37 4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding
28、 agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application sh
29、all have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the
30、application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agent's service charges (meter prices [2002]1980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering
31、agent's service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-ag
32、ent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for
33、 fares). Than the selected person tendering agent's service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agent's service charges (meter prices [2002]1980) of tendering agent's service fees under 1
34、00%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agent's service charges (meter prices [2002]1980) of tendering agent's service fees under 80%. Tendering agent's service charge base should include the following tenders: constr
35、uction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agent's service fees. Tendering agent's service fee payment in accordance with the General Office of the
36、 State development and Reform Commission on tendering agent's service charge of notification on the relevant issues (the change price [2003]857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not
37、violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and select
38、ion of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th
39、chapter application format notes: bidding agent ...43 前 言 临清市南水北调工程管理局于2008年7月委托山东省水利勘测设计院编制了《南水北调东线第一期工程临清市汇通河截污导流工程初步设计报告》,并依据设计报告所编制的水土保持措施内容进行了全面实施。根据《中华人民共和国水土保持法》、《<中华人民共和国水土保持法>实施条例》和水利部第16号令《开发建设项目水土保持设施验收管理办法》等法律、法规和文件规定,在开发建设项目施工期间和运行期间,需对建设项目防治责任区的水土保持情况进行监测,其目的是为了及时掌握工程区水土流失状况,评价工程建
40、设对水土流失的实际影响,了解工程区各项水土保持措施的实施效果和合理性,为工程安全生产建设、运行和水土保持方案实施服务。同时,通过对工程水土保持设施的运行状况及水土流失防治效果的监测,为提高水土流失防治效果提供技术管理依据和补充措施的设计依据。2009年7月临清市南水北调工程管理局委托具有水土保持监测资质的山东农业大学,对该项目的水土流失情况和水土保持状况进行监测。 为保证项目监测的顺利实施,山东农业大学成立了以专业教师和研究生为主体的水土保持监测项目组,根据《开发建设项目水土保持方案技术规范》(SL204-98)、《水土保持监测技术规程》(SL277-2002)、《开发建设项目水土保持监测设
41、计与实施计划编制提纲(试行)》(水保监[2006]16号)的有关规定,以及山东省水利勘测设计院编制的《南水北调东线第一期工程临清市汇通河截污导流工程初步设计报告》提出的水土保持监测要求(报批稿),在对现场进行全面调查、踏勘和资料收集的基础上,确定了本工程项目水土保持监测实施方案,并依据该方案在项目建设区进行了全面细致的监测,通过实地调查和定位监测,获得了相应的监测数据,于2009年11月编制完成了《南水北调东线第一期工程临清市汇通河截污导流工程水土保持监测报告》。 该项目的水土保持监测工作始于主体工程建设基本结束的中期。因此,本监测报告主要反映南水北调东线第一期工程临清市汇通河截污导流工程实
42、施过程中水土保持监测结果,评价内容主要包括2009年7月至10月份的水土流失防治责任范围、地表扰动、弃土弃渣、土壤流失及实施的水土保持措施,重点是对已完成的各项水土保持设施及防治效果进行监测。 通过对项目区现场调查资料和地面监测等资料数据的分析处理,得出以下结论:该项目扰动土地面积为8.21 hm2,其扰动土地整治面积为8hm2,水土流失总面积为8.21hm2,水土保持措施实施后将逐步发挥应有的水保效益,可使项目区内土壤流失量控制在9.93t,经计算项目区容许土壤流失量为16.42t。项目区实施水土保持措施后,工程扰动土地治理率达到97.5%,水土流失治理度达到了96.1%,土壤流失控制比总
43、体达到1.65,拦渣率可达98%以上,林草覆盖率为43%,植被恢复系数为96%。 南水北调东线一期工程临清市汇通河截污导流工程水土保持监测报告编制过程中得到了临清市南水北调工程管理局的大力支持,在此表示真诚的谢意! 1编制依据 1.1法律法规文件 (1)《中华人民共和国水土保持法》(1991年6月29日实施); (2)《中华人民共和国环境保护法》(1989.12.26第七届全国人民代表大会常务委员会第十一次会议通过); (3)《中华人民共和国土地管理法》(1986.6.25第六届全国人大常委会第十六次会议通过,1998.8.29第九届全国人大常委会第四次会议修订); (4)《中华
44、人民共和国水法》(1988.1.21第六届全国人大常委会第二十四次会议通过,2002.8.29第九届全国人民代表大会常务委员会第二十九次会议修订); (5)《中华人民共和国防洪法》(1997.8.29第八届全国人民代表大会常务委员会第二十七次会议通过); (6)《中华人民共和国水土保持法实施条例》(国务院令第120号,1993年8月1日); (7)《开发建设项目水土保持设施验收管理规定》(水利部第16号,2002年10月14日); (8)《中华人民共和国河道管理条例》(1988.6.10国务院第3号令); (9)《山东省实施<中华人民共和国水土保持法>办法》(1992年11月21日山
45、东省第七届人大常委会第三十一次会议通过,1999年6月18日山东省第九届人大常委会第九次会议修订); 1.2规范性文件依据 (1)《水土保持监测资格证书管理办法》(水保[2003]202号,关于印发《水土保持监测资格证书管理办法》的通知); (2)《水土保持生态环境监测网络管理办法》(2000.1.31水利部第12号令); (3)《山东省生态环境保护纲要》(山东省人民政府 鲁政发[2003]119号); (4)《山东省水土流失重点防治区通告》(山东省人民政府,1999年3月3日); (5)《水利工程建设监理规定》(2006.12.18水利部令第28号); (6)《水利部关于印发
46、水土保持生态建设工程监理管理暂行办法的通知》(水建管[2003]79号); (7)《关于开发建设项目水土保持咨询服务费用计列的指导意见》(水利部保监(2005)22号)。 1.3技术标准依据 (1)SD239-1987 《水土保持试验规范》; (2)GB/T15772-1995 《水土保持综合治理规划通则》; (3)GB/T15774-1995 《水土保持综合治理效益计算方法》; (4)GB/T16453.1-1996 《水土保持综合治理技术规范》 ; (5)SL190-1996 《土壤侵蚀分类分级标准》; (6)SL204-1998 《开发建设项目水土保持方案
47、技术规范》; (7)GB50201-1994 《防洪标准》; (8)SL277-2002 《水土保持监测技术规程》。 1.4技术资料及其批复文件依据 (1)山东省水利勘测设计院,南水北调东线第一期工程临清市汇通河截污导流工程初步设计报告,2008.9 (2)南水北调东线第一期工程临清市汇通河截污导流工程水土保持监测合同,2009.7 2项目及项目区概况 2.1项目概况 2.1.1 工程布局 南水北调东线工程山东境内分为南北干线和东西干线,南北干线全长487.0km,自苏鲁省界经韩庄运河进入南四湖,经梁济运河、柳长河进入东平湖,在解山
48、和位山之间穿黄河(隧道),入小运河,沿卫运河入七一、六五河,在武城进入大屯水库调蓄。东西干线即胶东输水干线,全长704.5km,由东平湖渠首分水闸引水,沿济平渠道、小清河至引黄济青,再由引黄济青至宋庄分水闸分水至烟台、威海。干线汇水区域包括东平湖、南四湖流域、海河流域和胶东半岛,涉及枣庄、临沂、济宁、菏泽、泰安、莱芜、聊城、德州、济南等市。 图2-1 临清市汇通河截污导流工程位置示意图 截污导流工程是南水北调东线第一期工程的重要组成部分,是贯彻“三先三后”原则的重要措施,是南水北调输水干线在输水期间防止沿线工业、城镇生活污废水(中水)排放而影响调水水质的控制性工程。南水北调东线第一期工
49、程临清市汇通河截污导流工程位置图如图2-1所示。 工程建设任务是将污水处理厂处理后的中水改排,不再排入临清六分干,以保证南水北调输水干线的水质,中水排放规模6万t/d;同时,通过河渠、管道连接工程输送中水,利用胡家湾水库、友谊渠和尚潘渠等拦蓄利用,用以灌溉周边的农田,实现污水资源化,以最大限度的利用和节约水资源。另外,临清市原排入六分干的城市非汛期雨涝水不再排入六分干,进行改排,另外寻找出路。主要建设内容包括:城区汇通河河道的清淤疏浚,红旗渠的渠道清淤疏浚及建筑物改建等河(渠)道整治工程;红旗渠至北大洼、北大洼至石河、汇通河头闸口至入卫新河的管道铺设,胡家湾倒虹吸(一座),红旗渠入卫穿堤涵闸
50、(一座)等新建工程。总体布置是临清市污水处理厂处理后的中水进入红旗渠后,在红旗渠西端利用银河纸业厂区内的输水涵洞向南入北大洼,在北大洼南侧穿过市政排水盖板涵后,沿北环路北侧向西至公路监测站门口,再向南穿北环路后沿北环路南侧向西至大众路口,沿大众路向南至先锋路口处建设输水管道,再向南新建连通管线2.832 km连通石河,通过整治汇通河(头闸口至二闸口)与小运河相连,新建汇通河头闸口至胡家湾倒虹吸铺设管道1.85km、在入卫新河桩号78+593处新建倒虹吸输水入胡家湾水库。在红旗渠穿卫运河大堤处建穿堤涵闸。在输水河渠穿越道路处,根据道路的具体情况,布设4座桥涵。另外,城区中北部非汛期涝水通过新铺设
51、管道和红旗渠汇流后,在红旗渠西端新建穿堤涵闸排水入卫运河。 2.1.2 工程建设内容及设计 临清市汇通河截污导流工程控制流域面积为22.7km2,共需铺设管道总长度为3.502km。永久占地10.7亩,临时占地6.0亩。工程在施工过程中,工程扰动原地貌、损坏土地及植被面积为106.1亩,土方开挖共33.86万m³,回填20.26万m³,弃方13.6万m3,在施工过程中临时堆弃一段时间后全部集中外运。砌石0.20万m³混凝土及钢筋混凝土0.48万m³,钢筋制安65.97吨。工期一年,总投资3155.99万元。 临清市汇通河截污导流工程主要建设内容包括河(渠)道整治工程和新建工程。其工程建设
52、内容布局如图2-2所示。 河(渠)道整治工程总长度度6.28km,包括:①城区汇通河1.18km河道清淤疏浚;②城区石河1.07km河道清淤疏浚;③红旗渠4.03km渠道清淤疏浚及建筑物改建。城区内疏浚整治旧河道,采用梯形断面,边坡系数2.0;红旗渠为梯形断面土渠,边坡系数2.0。石河整治段、汇通河整治段河底底宽3 m;红旗渠河底底宽保持不变,六分干闸前~京九铁路段底宽6m,京九铁路~入卫穿堤涵闸段底宽4m。 临清市汇通河截污导流工程输水河(管)道工程需新建工程包括: ①建连通管道 新建连通管道设计采用钢筋砼排水管,管线长度为3.502km,其中石河至北大洼长2.832km(双排5.66
53、4km)。双管铺设,企口连接形式,接口处设120°混凝土管道基础。 ②汇通河头闸口至入卫新河铺设管线长度1.85km,采用预应力钢筋砼管道输送水,设计输水流量0.7 m3/s,管径1.2m。 ③新建胡家湾倒虹吸和红旗渠入卫穿堤涵闸各一座。 图2-2临清市汇通河截污导流工程建设内容及线路示意图 红旗渠入卫穿堤涵闸工程位于红旗渠渠道末端,用于排除不能拦蓄利用的中水和城区非汛期涝水,设计排水流量8.06 m3/s。工程包含进口段、穿堤涵洞、出口段、下游明渠段。进口段由连接段、闸室段组成。连接段为砌石结构,长度10m,并设反滤层;闸室段为钢筋砼结构,长8m。穿堤涵洞为钢筋砼箱涵结构,单
54、孔,孔径2×2m(宽×高),共分7节,其中大堤下4节单节长度7m,其余单节长度14m。出口段由闸室段、消力池段组成。闸室段为钢筋砼结构,长8m;消力池段总长11.60m。滩地明渠采用砼板进行全断面衬砌,衬砌渠道总长430.06m,渠道末端接陡坡段长10m、抛石槽段长6m。 胡家湾倒虹吸工程设计输水流量0.7m3/s,设计输水管径1.2m。胡家湾倒虹吸工程由洞身段、出口段组成。洞身段采用5m一节承插式预应力钢筋砼管道,管道接头为柔性接头,直径1.2m。上游水平段长30m,上游斜坡段长11.44m,渠底水平段长70m,下游斜坡段长6.80m,下游水平段长70m。管身转角处采用钢筋砼封闭式镇墩型式
55、。出口段由闸室段、连接段组成。闸室段为钢筋砼结构,长3m,连接段为砌石和抛石结构,其中砌石段长度22.90m,抛石段长度3.5m。 工程施工完毕之后的中水排放路线从北向南:污水处理厂~红旗渠~造纸厂涵管(红旗渠至塔湖)~新铺设管道(塔湖~大众路~先锋路)~石河~汇通河~新铺设管道(汇通河头闸口至入卫新河)~胡家湾水库(友谊渠、尚潘渠)。而非汛期排水路线正相反,城区南部涝水就近通过头闸口排涝涵闸排水入卫运河,城区中北部的涝水从南向北,流至红旗渠后,汇合红旗渠的涝水,通过穿堤涵闸排入卫运河。 2.2项目区概况 2.2.1地理位置 临清市位于我国京九铁路进入山东省北部第一站上,地处鲁西北平
56、原,位于聊城市的西北角,属华北平原,地理位置北纬36°39′~36°55′、东经115°27′~116°02′之间,西隔卫河与河北省临西县相望,东隔马颊河与高唐、茌平二县为邻,北部与德州地区夏津县相连,南部与聊城市和冠县接壤,全境东西长55.44km,南北宽29.88km,总面积957km2。 2.2.2气候气象 临清市处于半湿润半干旱地区,属温带大陆性季风气候,多年平均气温15℃,年内变化明显,一月份最低,平均-2℃,七月份最高,平均27℃,极端最低气温-20℃,最高气温42.6℃,年日照时间为2591小时,多年平均无霜期206天。降雨主要受太平洋东南季风影响,多年平均年降雨量为533m
57、m,降雨量年际丰枯悬殊,最大年降雨量为979 mm(1964年),最小降雨量186.9 mm (1992年);降水量主要集中在汛期,临清站长系列资料统计,汛期(6~9月)四个月的降水量达395.9mm,约占全年降水量的74.5%;7、8两个月降水量为289.4mm,占全年降水量的29.8%。降水年际变化较大,降水量的年际变化既有相邻年份的旱涝交替,又存在连枯和连丰的丰枯水年段;既存在30年左右的长周期变化,也存在3~5年短周期振荡。多年平均蒸发量为1480mm。多年平均大风日数3.6天,大风风向以西北风为主,最大十分钟平均风速17.0m/s。春季干旱多风,夏季炎热多雨,秋季雨量减少,冬季寒冷干
58、燥,构成了春早、夏涝晚秋又旱的气候特征。 2.2.3地形地貌 工程区地处黄泛冲积平原,地势西南高,东北低,地面高程在40~25m之间,地面坡降为1/7000~1/10000。由于受黄河历次决口改道和自然侵蚀的影响,形成了地形局部微度起伏,岗、坡、洼相间的平原微地貌形态。 2.2.4水文地质 工程区属于黄河冲积平原水文地质区,区内地下水为第四纪孔隙潜水,以大气降水和引黄灌溉为主要补给来源,以地面蒸发、人工抽取及缓径流为排泄方式。地下水化学类型主要为重碳酸盐,对混凝土无腐蚀性。境内天然降水所产生的地表径流为13091万m3,补给的浅层地下水量10220万m3。可利用量包括降雨径流拦蓄可利用
59、及浅层地下水源可利用总量为9932万m3。地下水以大气降水,河道侧渗为主要补给来源,以蒸发、径流人工开采为主要排泄方式。 临清市境内河流有卫运河及马颊河两大水系,均属海河流域。主要过境河流有卫运河、马颊河和小运河。 市区范围内主要河(湖)道有:汇通河、石河、红旗渠、北大洼引黄入卫新河、十八里干沟、临清六分干。 2.2.5土壤 汇通河截污导流工程沿线,第四系厚度一般30.0~270.0m。第四系分为更新统和全新统,更新统主要为河湖相沉积,岩性上部为浅黄棕色砂土夹砂壤土为主,夹有粉砂和细砂,结构松散;下部多浅棕黄色、浅黄棕色、浅红棕色粘土、粉砂质粘土及浅灰绿色粉砂、细砂呈不等厚互层组成,底
60、部为一层锈黄色泥砾、砾卵石层,该套地层属于冲积、洪积、湖积成因的地层。土壤由黄河冲积土发育而成,土壤类型多为潮土,质地为沙壤土和轻壤土、沙质土。土壤结构疏松,具有一定的流动性,保水、保肥能力差,常受风沙危害。测定表明,区内土壤贫瘠,肥力低,耕层土壤养分普遍缺少磷、氮、钾,有机质偏低。 2.2.6植被 研究区植被稀少,多为农作物、人工栽培的用材林、农田林网、四旁树木和经济林果及草本植物群落。树种主要以杨树、毛白杨、垂柳、旱柳等为主,经济林果主要有苹果、梨、枣,其次为杏、桃、葡萄等。农作物以小麦、玉米、棉花、花生、大豆等为主。自然植被主要有反枝苋、茅草、马绊草、蟋蟀草、芦草、碱蓬等。 2.2
61、.7社会经济状况 临清市总面积为957km2。城市建成区面积22.7km2,常住人口20万人,城市化水平达到34%,三次产业结构比例为14:64:22。临清市已形成门类比较齐全的工业体系。市区包括三个街道办事处,是全市政治、经济、文化中心。 2.2.8水土流失与水土保持状况 (1)水土流失状况 根据山东省发改委、山东省水利厅编制的《山东省水土保持规划》中的水土流失分区和山东省人民政府《关于发布水土流失重点防治区的通知》中的规定,项目区地处鲁西北黄泛平原区中度风蚀水蚀区,属于山东省水土流失重点治理区。水土流失类型主要为风蚀,并伴生一定的水蚀。风蚀主要发生在2~5月份,其次是11~1月份,
62、水蚀主要发生在6~9月份。 根据2004年上半年第二次水土流失遥感普查资料,并结合实地调查,工程所经历临清市的水土流失总面积为147km2,以风蚀为主,其中轻度风蚀占占46.88%,中度风蚀占33.92%。通过对项目区地形坡度、地面组成物质、植被覆盖度、气候等自然条件和影响因子之间关系进行综合分析,确定工程项目区水土流失分级属于轻度流失,原地貌土壤侵蚀模数为460~1100t/km2.a,根据土壤侵蚀强度分级和土壤侵蚀容许标准,项目区土壤侵蚀容许量200t/km2.a。 (2)水土保持状况 近年来,在各级政府的领导下,项目区各有关部门以农田基本建设为基础、以改良土壤为重点、以利用土地资源
63、为目的,植树造林,治理风沙,长期坚持开展群众性的水土保持,加强水土流失防治工作,取得了较为显著的成绩。 通过以小流域为单元,大力开展农田基本建设和植树造林活动,发展节水灌溉,种草、种树,营造水保林;进行荒地整治和沟道治理、发展农田林网设施,完善沟、路、桥、涵配套建设,发展经济林和水土保持涵养林,增加植被覆盖率。 据统计,项目区截止到2005年底,先后对建设水土保持专项设施230余项,构筑农田林网15万亩,实施林粮间作8万亩,营造成片水保林3.6万亩,栽植经济林果2.8万亩,治沙改土3.9万亩。经现场调查,项目区河道疏浚工程、新开挖渠道工程和建筑物工程区大部分为农业植被,植被
64、覆盖率约为96%(包括农作物的季节性植被)。 2.3 项目区水土保持防治体系 2.3.1 水土保持防治目标 临清市汇通河截污导流工程是南水北调东线第一期工程的配套工程,工程等别为四等,同时项目区为山东省水土流失重点治理区,经综合考虑,该工程水土流失防治标准执行二级标准。 2.3.2水土保持措施布局 根据工程特点及水土保持目标要求,做到主体工程建设与水保方案相结合,预防措施与治理措施相结合,工程措施与植物措施相结合,重点治理和综合防护相结合,治理水土流火和恢复、提高土地生产力相结合,力争改善项目区及周边区域水土环境。其水土保持措施防治体系详见图2-3。 注:★为本次新增水
65、土保护措施 图2-3 水土保持措施体系图 2.3.3水土保持主要建设内容及工程量 新增的水土保持工程主要以植物措施为主,以工程措施为辅的相互结合的水土保持防护措施,同时在工程施工的整个过程中,相应配置临时防护工程。根据水总局科(2005)3号和水利水电工程量计算规定,工程措施和植物措施工程量的阶段系数为1.05。其中,工程措施为堤防整治在主体工程中考虑:狗牙根和紫羊草籽90360m2,临时措施编织袋装土779.63m3,防尘网8940m2。 2.3.4水土保持方案实施进度计划 水土保持方案实施进度应与主体工程施工进度协调一致。 (1)按照“三同时”原则,坚
66、持预测为主,及时防治: (2)永久占地区工程措施坚持“边施工边防护”的原则,及时控制施工过程中的水土流失;临时占地区施工完毕后及时拆除清理临时设施,并进行场地整治,以便复耕或种植植物; (3)尽量利用主体工程已有的设施和施工临时发施,避免重复; (4)植物措施在具备条件后尽快实施。 根据主体工程实施进度,本工程总共划为12个月。 工程建设中水土保持实施进度与主体工程进度相适应,结合季节性施工,保证重点,兼顾整体。 3监测实施 3.1监测目标与原则 3.1.1水土保持动态监测目标 本工程水土保持监测的宏观目标就是为水土保持监督执法提供技术支持。具体目标主要有以下四个方面: 一是落实水土保持方案的重要环节,通过监测来规范建设活动,特别是弃土、弃渣行为,督促建设单位落实水土保持方案各项防治措施; 二是通过对建设活动造成的水土流失动态监测分析,掌握水土流失的特点、分布、规模,为水土流失防治提供依据和实施监督管理提供技术服务; 三是评价水土流失防治效果,检验水土保持防治工程技术合理性及水土保持方案的科学性,为项目竣工验收和水土保持设施运行
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 职场中典型的学生思维
- 质量管理知识100题(除答案)
- “五四精神”专题党课范文(三篇)
- 巡视巡察整改感悟及体会范文(三篇)
- 第四届全国节约用水知识大赛题库完整版(1-180题含答案)
- 党员干部在学习教育读书班上的交流发言范文(三篇)
- 各行业在2025年五四青年节演讲会上的演讲稿范文(四篇)
- 2025年度党风廉政建设工作会议上的讲话范文(四篇)
- 在全市“十五五”规划编制工作推进会上的讲话范文(三篇)
- 苏教译林版高中英语新课标3000词词性转换总结
- 高中英语阅读理解障碍词汇-总结
- 高中英语75个读后续写高频情绪描写词汇
- 高中英语读后续写21种场景句型积累与句子仿写
- 新员工培训的关键细节
- 某公司警示标志管理制度