1、 SECCO IPMT Site Safety PracticeHSE DOCUMENT健康、安全和环保文件Shanghai SECCO Petrochemicals Company Limited上海赛科石油化工有限公司Integrated Project Management Team一体化项目管理组Caojing, Shanghai, P R China 中国,上海,漕泾Document Title文件名Emergency Response 紧急事件响应PR-00-SIJ-SE-0004A00Approved 审批P02For Review 供审核MJT01/07/02P01For IP

2、MT Review 供IPMT审核12/04/02LYB01/05/02P00For Review 供审核P.G19/03/02LYB12/04/02Issue RevIssue or Revision DescriptionOrigin byDateCheck byDateApprovebyDateApprove byDateThis Document is Owned by Michael Tousignant IPMT AuthoritySite Safety Practices现场安全惯例Emergency Response 紧急事件响应 INDEX目录1 PURPOSE目的2 SCO

3、PE范围3 LEVELS OF RESPONSE响应等级4 ACTIONS / REQUIREMENTS行动4.1 GENERAL通则4.2 RESPONSE TO EMERGENCIES对紧急(事件)的响应 5 EMERGENCIES 紧急事件5.1 FIRE 火灾5.2 VEHICLE ACCIDENTS车辆事故5.3 WEATHER EMERGENCIES 气候方面的紧急事件5.4 ENVIRONMENTAL RELEASE/RESPONSE ACTIONS 环境性释放5.5 SECURITY INCIDENTS保安事故6 SITE EVACUATIONS现场疏散7 TRAINING /

4、 RESPONSE DRILLS培训/应急演习8 TELEPHONE NUMBERS应急电话号 APPENDICES附录Appendix 1EMERGENCY RESPONSE CHECKLIST附录1 应急响应审核单1. PURPOSE目的The purpose of this procedure is to provide a safe system of work by the implementation of emergency response measures and to identify the responsibilities and legal requirements

5、at worksites where SECCO has the prevailing influence. 本程序的目的是通过执行紧急反应措施为工作提供一个安全体系,明确赛科具有主导影响力的工地的责任和法律要求。2. SCOPE 范围2.1 This procedure describes the actions to be taken by key personnel in the event of an emergency situation arising on the SECCO Project Site and offsite construction activities ass

6、ociated with this project.本程序说明与赛科项目现场及与本项目有关的场外施工活动中出现紧急状态时,关键人员可以采取的措施(行动)。2.2 The procedure also caters for emergencies arising out of office hours. It is anticipated that notification of emergencies occurring during office hours will be via normal channels. The response arrangements will however

7、, be as per the procedure.本程序还考虑办公时间以外出现的紧急事件。可以预料,在办公时间出现的紧急事件将由正常的渠道通知,但响应安排将按本程序。3. LEVELS OF RESPONSE反应等级3.1 As emergency situations differ in severity, for the purpose of establishing the appropriate level of response required, incidents are ranked as Levels 1, 2 and 3.由于紧急事件在严重性方面是各不相同的,为了满足适当

8、的响应级别的要求,将事故分为1,2和3级。Level 1 -This would be, but may not be limited to, a medical rescue, which is the result of illness or minor injury or minor incident. Some examples would be:1级-包含疾病、轻微的伤害或事故导致的医疗救护在内的轻微事件。例如:a) An environmental spill of I barrel or less. 1只桶或不到1只桶(的化学品)溢溅至环境中。b) A fire, that wa

9、s extinguished with a hand held fire extinguisher. 可以用手提式灭火器扑灭的火灾。c) A single vehicle accident without injury 没有人员伤害的单独的车辆事故。.In such instances the response would be limited to the immediate supervisor. 在这类事例中,响应(动作)应局限于直接的主管。Level 2-This would be a medical rescue, which is the result of an injury,

10、caused by an accident, serious enough to require investigation and which may have been reported to the local authority by the Contractor / Subcontractor. Some examples would be:2级-这将是一种医疗救助,是由于事故造成的伤害,它严重到足以要求调查(原因),它也可能已由承包商向当地有关部门报告,例如:a) An environmental spill greater than I barrel but less than

11、ten barrels. 1桶以上10桶以下的化学品溅溢至环境中。b) A fire requiring outside assistance. 要求外界援助的火灾。c) A vehicle accident resulting in minor injuries. 导致轻伤的车辆事故。In such instances, response would be limited to the Project Manager, Project / Construction HSE Manager or deputy.这种情况响应只局限于项目经理,项目HSE安全经理或其代表。Level 3-This

12、is an emergency situation, which has resulted in the mobilization of the site emergency response organization. In such instances the full SECCO Emergency Response Team will be mobilized. Some examples would be:3级-这种紧急事件会导致现场紧急事件响应组织的介入。此时,整个赛科紧急事件响应小组都进入现场,例如: a) A major environmental spill 重大的环境溢溅(

13、事件)b) A major fire. 重大火灾c) A vehicle accident resulting in fatalities or major injuries. 导致死亡和严重伤害的车辆事故3.2 The Primary Emergency Response Team is Described Below: 初级紧急事故响应小组如下所述:a) Project Manager (Emergency Team Leader)项目经理(紧急小组领导人)b) Construction Manager (Alternate Emergency Team Leader) 施工经理(紧急小组

14、候补领导人)c) Contractor / Subcontractor HSE Manager承包商/分包商HSE经理d) Construction / Project HSE Manager项目HSE经理3.3 A sufficient numbers of persons will receive Emergency Response Training to ensure that there is adequet coverage during absence periods.要有足够的人员经过紧急事故响应培训,保证有人缺席时有足够的人员可替代。4. ACTIONS / REQUIREM

15、ENTS 行动4.1 General通则4.1.1 In order that the Emergency Response Team can function properly the following will be provided:为使紧急响应小组能正确发挥作用,必须提供如下(条件):a) A listing of all personnel employed and their work locations.所有雇员的名单,及他们的工作场所。b) List of employees home addresses and telephone contact numbers 雇员家庭地

16、址及联系电话号码清单.c) Up-to-date roster list of Emergency Response Personnel and management personnel. 紧急响应人员和管理人员的最新名册。d) Telephone numbers of Emergency Response Personnel. 紧急响应人员电话号码e) Contractors / Subcontractor emergency contact numbers. 承包商/分包商的紧急联系(电话)号码。f) The allocation of an Emergency Response Cent

17、er. 紧急响应中心所在地g) Training for Emergency Response Team members. 紧急响应小组成员的培训h) Periodic drills and simulation exercises.周期性的练习和仿真实践 Emergency Response System FlowchartTypical Facilities and Equipment for Emergency Response Centers.典型的紧急响应中心设施和设备Location紧急响应中心的位置(Room, building number, etc).室,建筑物号等Arran

18、gements and fittings布置和装备Boardroom-style table and chairs 桌子和椅子Digital clock (day/date/24 hours) 数字钟(星期/日期/24小时)White board to record a central log of events 用来记录事件的白板Additional white boards or flip charts (plain or pre-printed) to record specific categories of status information such as personnel a

19、t site, casualties, external organisations notified 额外的白板或卡片簿(普通或预印的)以记录特殊类别的情况信息,诸如在现场人员,人员伤亡,通知外界组织等。Communications通讯Equipment to include:包括以下设备:Radios on an emergency frequency 紧急频率上的无线电Dedicated mobile telephone 移动电话,包括一只专门设置的“热线”电话,用来联系事故现场。PC for word-processing, electronic mail, FAX machine e

20、tc. 一台用于文字处理、收发电子邮件的电脑和传真机等Access to photocopier 影印机Documents and stationery 文件和文具To include:要包括:Emergency telephone directories 紧急通讯电话簿Company and area telephone directories 公司和现场电话簿Maps and diagrams at appropriate scales, e.g. topographic maps, aerial photos, plans, flow schemes, drainage diagrams

21、, firewater and electrical diagrams 以适当比例画的地图和图表,如地形图、航摄照片、流程草图、排水系统图、消防水和电气(连接)图Site plot plans (all major sites/locations/facilities) 现场平面图,包括所有主要的工地/位置/设施Emergency response plans/procedures 紧急响应计划/程序Contractor and subcontractor emergency response plans 承包商和合作者的紧急响应计划Log sheets, together with any

22、other standard forms 记录纸及其它各种标准表格Paper, pens, pencils, markers, etc 纸、钢笔、铅笔、记号笔Organisation diagrams 组织(结构)图Material Safety Data Sheets (MSDS). 物料安全数据表 4.1.1 The Construction Management will carry a mobile phone at all times while on duty or when on call.值班工程师在其当班时将随时身带移动电话和呼机。4.1.2 Out of office ho

23、urs a telephone answering machine may be activated to provide callers with SECCO out-of-hours emergency telephone numbers.下班后,应使电话应答机处于工作状态,以向来电者提供赛赛科下班时用的紧急电话号码。4.1.3 The identified conference room at the SECCO Project will also serve as the Emergency Co-ordination Room, to provide a base from whic

24、h the Emergency Response Team can co-ordinate efforts to help resolve any arising crisis. 赛科项目的指定会议室也将用作紧急事故协调室,成为紧急响应小组的指挥中心,进行协调作业,协助解决出现的危机。4.2 Response to Emergencies对紧急事故的响应4.2.1 Level 11级4.2.1.1 The immediate supervisor has the responsibility to contact the Contractors HSE Manager /Engineer to

25、 provide full particulars of the emergency. The Contractors HSE Manager / Engineer shall then take appropriate actions.直接的主管有责任与承包商HSE经理/工程师联系,向(其)提供紧急事件的全部详情。然后承包商的HSE经理/工程师必须采取适当行动。 4.2.1.2If for any reason the Contractors HSE Manager / Engineer cannot be contacted the call should be directed to t

26、he Area Construction Manager or designate, who can either deal with the matter directly or contact other suitable personnel. 如果由于种种原因,联系不上承包商的HSE经理/工程师,应直接打电话给区域施工经理或其指定人员,他可以处理这种事情或者能联系上其它合适人员。4.2.2Level 22级4.2.2.1Above actions will also apply to Level 2 emergencies but in the event of a more serio

27、us accident or incident, the SECCO Project/Construction HSE Manager, or his deputy, and the Area Construction Manager must be informed. The SECCO Project/Construction HSE Manager shall commence incident investigation activities. 对这一级的紧急事件也要采取上述行动,但若事故较为严重,还应通知赛科项目HSE经理或其副手、区域施工经理。赛科项目HSE经理必须开始事故调查活动

28、。4.2.3Level 3 3级 4.2.3.1All calls concerning a level 3 emergency should be made to the Project Manager. On receipt of a call indicating that a Level 3 Emergency has arisen the following actions shall be taken. The Project Manager shall immediately contact all Emergency Response Team Members advising

29、 them of the situation and instructing them to proceed to the site of the emergency and if necessary to mobilize the Emergency Co-ordination Room. Once contact has been made the Project Manager should immediately proceed to the scene of the emergency. 凡涉及3级的紧急事件均应打电话给项目经理。一旦收到出现3级的紧急事件的电话,应采取下列行动。项目

30、经理应立即与全体紧急响应小组成员联系,告诉他们发生的情况,并指示他们去事故现场,必要时将紧急事故协调室搬过去。一旦联系完毕,项目经理应立即去事故现场。4.2.3.2If the Emergency Co-ordination Room has been mobilized the Project Manager shall advise the Contractors HSE Manager that the Emergency Co-ordination Room has been mobilized and that all communications should be between

31、 the two centers. 一旦紧急协调室已经搬迁,项目经理应通知承包商HSE经理紧急协调室已完全搬好,所有的通信可在两个中心之间进行。4.2.4Once the nature of the emergency has been established, the Project Manager must determine the extent of back-up and support required. He must also liaise with the Contractors HSE Manager and establish whether a SECCO Repres

32、entative is required at the Contractors premises, Police Headquarters, Hospital, etc. 一旦紧急事件的性质已经确定,项目经理必须决定后援和支持的程度(范围)。他还必须与承包商HSE经理保持联系,以明确SECCO高级代表是在承包商办公室、警察总部还是在医院等(为好)。 4.2.5The Project Manager may require the Contractor to provide a print out of the up-to-date Persons on site list, for the a

33、ffected location. 项目经理可要求承包商提供一份受害地点更新的“现场人员”名单。4.2.6Anyone involved in an emergency response shall maintain a log of all information, (issued and received) and of all actions taken. For this purpose clear and legible notes on plain paper are acceptable. At the conclusion of the emergency, the notes

34、 must be collated and stored for possible future scrutiny by management or authorities. A full de-brief meeting will be carried out as soon as practicable after the incident. 涉及到紧急事件的任何人应保留所有(发出的和收到的)信息的日记以及采取的行动记录。为此,可以接受在普通纸张上作明确而易读的笔记。事件结束后,笔记必须加以分类保管,以备将来管理层或有关机关查阅。事故后应尽快进行汇报会议。 4.2.7Should it b

35、e necessary for a SECCO Representative Team to attend the contractors premises, the nominated person must be equipped with all SECCO Persons-on-Site family names and contact telephone numbers plus mobile telephone numbers. 如果必须要有赛科代表到承包商办公室,该指定人员必须配备以SECCO所有“在现场人员”集体名字、联系电话和手机号。4.2.8 Media - Media c

36、alls must be referred to the SECCO Director of Construction or Deputy If this proves to be impractical due to the contractor delaying release of information, the Project Manager may release a statement acknowledging awareness of the emergency, the location of the emergency and stating the fact that

37、SECCO Emergency Response Team has been mobilized and is working with the contractor to co-ordinate the response. 媒体-媒体的来电必须提交赛科建设部正副主任。假如由于承包商推迟发布信息而使之不能进行时,项目经理可发布一项声名,告知对突发事件的注意、突发事件的位置并指出事实上赛科应急小组已调动,正与承包商一起工作以协调应对。4.2.9Once the initial statement and further statements have been released, the Pro

38、ject Manager or his designate may be subjected to receiving numerous calls from the media. Only approved information given to them by Senior SECCO Management shall be issued. 一旦最初的声明和进一步的声明公布后,项目经理或其委派人可能会收到大量来自于媒体的电话。只有经高级SECCO管理部门同意提供给他们的信息方可发布。4.2.10On no account should anyone dealing with the em

39、ergency, assume or surmise anything. 媒体应对小组决不能推测,假定或臆想任何事情。4.2.11Emergency Evacuation - In the event that the emergency results in the evacuation of personnel from the site, the contractors HSE Manager shall ensure that is head count is conducted and that all employees have been accounted for and to

40、 arrange for the evacuees to be cared for as appropriate. 应急疏散-在突发事件造成人员从现场疏散的情况下,承包商的HSE经理应确保进行“人头清点”,所有雇员均有下落,对被疏散者安排相应的照料。4.2.12 Should personnel, (staff, agency, seconded), become hospitalized, the appropriate personnel department shall ensure arrangements are made for the injured parties family

41、 to be informed. 一旦有人员(职员、代理、临时调任的)住院,有关人员的部门应确保通知受伤方家属,并做好安排。5. EMERGENCIES紧急事件This section will outline procedures for addressing various emergency situations这一部分将概述解决各种不同紧急情况的程序The Security Team is responsible for maintaining clear emergency routes and to assist in directing emergency equipment a

42、nd personnel to an affected area of the site. They will also keep unauthorized personnel away from an emergency scene.保安小组负责维持畅通的应急通道,并协助指挥应急设备和人员至现场的事发区域。他们还应使未授权的人员离开应急现场。5.1 FIRE 火灾Equipment: The Site HSE Team will inspect and maintain the site fire fighting equipment.设备: 现场HSE小组将检查并保管消防器材。An app

43、ropriate number of site personnel will be trained in the proper use of fire fighting equipment. The training will include hands on use of fire hoses and fire extinguishers. Site personnel must be informed to always use their individual judgment as to whether it is safe to attempt to fight a fire wit

44、h available fire fighting equipment and they should never hesitate to leave the fire scene if they feel they are in imminent danger. 对适当数量的现场人员进行正确使用灭火设备的训练。训练将包括消防水管和灭火器的传递使用。现场人员须被告知在试图用现有的灭火设备进行灭火时,应始终判断他们自己是否安全,并且他们在感到自身将陷于危险时千万不应犹豫,要立即离开火灾现场。When a fire is detected, personnel must be able to al

45、ert the Project HSE personnel I.e. By using an air horn and signally the international distress (SOS) three short blasts, a pause, followed by three long blasts). The person detecting the fire must alert personnel in the immediate area of the fire and those personnel can either attempt to use the po

46、rtable fire extinguishers and hoses to fight the fire or immediately evacuate the area. Once the Project HSE personnel arrive on the scene they will determine whether the local fire department or mutual agreement partners need to be summoned. Site personnel are not allowed to attempt to fight any fi

47、re using equipment brought to the site by a local fire department or mutual aid partner.火灾发现时,人员首先必须使用现有的报警系统向项目HSE人员发出火灾出现的信号。例如,用汽喇叭(两声短促的响声,停顿,再接着三声短促的响声)。他们还必须说明伤害响应小组是否需要作出响应。发现火灾的人员必须向在火灾直接现场的人员报警,而这些人员既可以尝试用手提灭火器和水管灭火,也可以立刻从现场疏散。项目HSE人员一旦抵达现场就应决定是否需要召唤当地消防部门或共同协议的合作方。现场人员不得试图用当地消防部门或者互援合作方带到现

48、场的设备进行任何的灭火。Once the fire has been extinguished the affected Project Manager will ensure that a thorough incident investigation is conducted and that an incident report is prepared and duly communicated. The written report shall be sent to the SECCO HSE department as soon as reasonably possible.一旦火灾

49、被扑灭,则事发的项目经理应确保进行彻底的事故调查,并准备一份事故报告及时传达。报告应立即送达HSE部门。5.2 VEHICLE ACCIDENTS车辆事故The individuals involved in or witness to a vehicle accident must immediately alert the Construction Manager and the SECCO HSE Department. They must indicate whether there are actual or suspected injuries that require the a

50、ttention of the Injury response Team or local medical services. The Construction Manager may call for the dispatch of Security personnel and/or the Injury Response Team to the accident scene as required. 涉及或目睹车辆事故的个人必须立即向施工经理和赛科HSE部门报警。他们必需指出是否有实际或可疑的伤员需要引起伤害响应小组或当地医疗服务部门的注意。地区施工经理可以在需要时要求派遣保安人员或伤害响

51、应小组到事故现场。If summoned Security will secure the accident scene and determine whether the Construction Manager and the Manager of the Contractor affected by the accident should be notified. Once the scene is secured, Security will gather information and issue a written report. The Security Chief will i

52、nitiate an investigation and with the assistance of the SECCO HSE Department will determine the causes and develop appropriate preventative measures.保安部门在得到召唤后应保护事故现场并决定是否应通知事故相关的施工经理和承包商经理。现场一旦得到保护,保安部门应汇总信息并发表书面报告。保安部门主管在赛科HSE部门的协助下认定原因,提出相应的预防措施。5.3 WEATHER EMERGENCIES气候方面的紧急事件The SECCO HSE Depar

53、tment is responsible for drawing up contingency plans for Typhoons and other inclement weather. Weather monitoring software is recommended to provide hourly update reports to the Project Managers and Construction Managers; however, a formalized agreement with a local weather station may also be made

54、 to serve the purpose of attaining timely and accurate weather information.赛科HSE部门将负责制订对于台风和其它恶劣天气的应急计划。建议预先安装天气监控软件,便于向项目经理和施工经理提供每小时的最新报告。然而,也可以和当地气象站签订一个正式的协议,通过定期的服务获取正确的气象信息。Typhoons: The site will be made secure starting 48 hours prior to the potential arrival of a system that has winds greate

55、r than 75 kilometers per hour makes landfall. Within 12 hours of the anticipated arrival of the system the site must be completely secure.台风:现场将在风速每小时75公里的这一类大风可能抵达陆地之前48小时开始进行保护。在预期抵达的十二小时之内,现场必须做好全部的安全防范措施。Securing the project site entails the following: Construction work will stop and focus on ty

56、ing down loose material and equipment, disposal of rubbish / trash and garbage, securing objects and equipment that could become airborne, disconnecting electrical power to non-essential areas, lowering of crane booms and evacuation of non-essential personnel from the project site to a secure area.

57、On an occurrence basis, the Project Manager will deal with other arising weather emergencies.项目现场的安全要求如下:施工工作停止并捆住松散的材料和设备,处理垃圾/残屑和废料,固定那些可能被风刮走的物体和设备,切断不重要区域的电源,降下起重机的起重臂,并将无关紧要的人员从项目现场疏散到安全的区域。以此为基础,项目经理将处理其它的气象紧急事件。5.4 ENVIRONMENTAL RELEASE/RESPONSE ACTIONS环境性泄漏 / 响应行动In the event of an Environme

58、ntal Release the Project / Construction HSE Manager must be notified immediately, who will in turn notify Emergency Response personnel. The type and magnitude of release and current weather conditions must be considered and the hazards thoroughly assessed before mobilizing emergency personnel. All E

59、mergency Response personnel entering the release area must wear the proper personnel protective clothing and respiratory protection.在环境性泄漏的情况下,必须立即通知项目HSE经理,并由其通知应急小组成员。泄漏的类型和量度以及当时的天气状况必须予以考虑,并在调动应急人员之前对危险作出完全的评价。所有进入泄漏区域的应急小组成员必须穿戴合适的人身防护衣服和防毒面具。Non-Hazardous materials should be stopped at the sou

60、rce of release. Containment and clean up should begin as soon as reasonably possible. 非危险性材料应停放在释放原地。装封和清扫应尽快开始。Hazardous materials This site practice does not cover any significant Hazardous release. In case of significant release all personnel are to be evacuated from the immediate area and that a

61、rea is to be cordoned / barricaded off. Containment must not proceed until the associated hazards are assessed and worker safety is assured. Clean up must not proceed until a Job Hazard Analysis and Safe Work Plan is developed that will assure the well-being of clean up personnel. 危险性材料 这一现场操作不包括重大的危险性泄漏。在发生重大的泄漏时,所有人员均应从直接区域疏散且该区域应予以布设警戒线/隔离。装封只有等到有关的危险性作出评价且工人的安

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!