欢迎来到装配图网! | 帮助中心 装配图网zhuangpeitu.com!
装配图网
ImageVerifierCode 换一换
首页 装配图网 > 资源分类 > PPT文档下载
 

港珠澳大桥英语演讲课堂PPT

  • 资源ID:181989510       资源大小:5.15MB        全文页数:15页
  • 资源格式: PPT        下载积分:10积分
快捷下载 游客一键下载
会员登录下载
微信登录下载
三方登录下载: 微信开放平台登录 支付宝登录   QQ登录   微博登录  
二维码
微信扫一扫登录
下载资源需要10积分
邮箱/手机:
温馨提示:
用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
支付方式: 支付宝    微信支付   
验证码:   换一换

 
账号:
密码:
验证码:   换一换
  忘记密码?
    
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

港珠澳大桥英语演讲课堂PPT

.1Hong Kong-Zhuhai-Macao Bridgeto make the world convenient姓名日期.2Contents4、The Immersed Tube Tunnel2、Features and Difficulties5、The Significances 1、Brief Introduction3、Two Artificial Islands3.工程工程总体方案总体方案l The first major combined bridge and tunnel sea-crossing project in China.l Cost approximately RMB 105 billion.l Construction began in 15 December 2009 at Zhuhai.l Will reduce travel time from Hong Kong to Macau or Zhuhai from over three hours to just half an hour.41.Brief IntroductionHong KongZhuhaiMacau Bridge:the worlds longest sea-crossing bridge,one of the most challenging constructions of its kind undertaken in the world to date.5l Two artificial islandsl An immersed tube tunnell The Y-shaped bridge 1.Brief Introduction.6l Total lenght:49.97 kilometersl Underwater tunnel:6.7 kilometersl Bridge over the sea:23 kilometers Macau Link RoadZhuhai Link RoadOffshore Bridge-and-TunnelHKLink RoadHK port1.Brief Introduction.71.the life span of the bridge is set at 120 years.2.It reportedly can stand magnitude-8 earthquake,scale-16 typhoon as well as the collision with a 300,000-ton ship1.Brief Introduction.8 this project features a design-and-build contract,coordination of the three regional governments in the construction and management,and close attention from the society.Moreover,there are environmental constraints as the alignment runs across the national conservation area for the Chinese white dolphins,as well as complicated navigation traffic conditions as the route crosses the busiest shipping area of the Lingding Sea.2.Features and Difficulties.9Hong Kong-Zhuhai-Macao Bridge is the national key project featured with strategic significance,large involvement,highly difficult level of construction,long construction time,high requirement on technical design and environmental protection,many participant parties,complex management and coordination.2.Features and Difficulties.103.Two Artificial Islandsthe West Artificial Islandthe East Artificial Island.11The East Island has 59 round steel cylinders圆钢筒.The West Island has 61 round steel cylinders.The diameter of a single cylinder is 22.0m,and the cylinder wall is 16mm thick.The height of round steel cylinder is 40.5m to 50.5m.The round steel cylinder weighs 445t to 507t.3.Two Artificial Islands.124.The Immersed Tube Tunnel.13The water resistance ratio must be limited to 10%to prevent accumulation of sediment at the Lingdingyang Channel,otherwise it will impose serious impact on the Pearl River flow path and flood-discharge capacity,according to a government report.Due to the long distances between the cities,the project is actually a series of bridges and tunnels,connected by artificial islands,this was the first time China has built an immersed tube tunnel(沉管隧道)in open waters.The 33 tubes will compose a 5.6-kilometer immersed-tube tunnel,which is designed to be an important part of the bridge.Each of the tube,with a weight of 80,000 tons and a length of 180 meters,takes about two months to build.4.The Immersed Tube Tunnel.145.The SignificancesBritish newspaper“The Guardian”named the megastructure one of its“seven wonders of the modern world near completion.”It will be the first new land transport link between the east and west coasts of the Pearl River,The bridge will benefit the economic development of the whole of the Delta.The bridge will create a regional transport network,improving upon what is considered to be a weak land transport network currently in placeThe End!Thanks for your attention!

注意事项

本文(港珠澳大桥英语演讲课堂PPT)为本站会员(无***)主动上传,装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知装配图网(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!