英国伦敦塔桥

上传人:仙*** 文档编号:77132317 上传时间:2022-04-19 格式:DOC 页数:4 大小:758.01KB
收藏 版权申诉 举报 下载
英国伦敦塔桥_第1页
第1页 / 共4页
英国伦敦塔桥_第2页
第2页 / 共4页
英国伦敦塔桥_第3页
第3页 / 共4页
资源描述:

《英国伦敦塔桥》由会员分享,可在线阅读,更多相关《英国伦敦塔桥(4页珍藏版)》请在装配图网上搜索。

1、英国伦敦塔桥(附图)TOWER BRIDGE LONDONOriginally, London Bridge was the only crossing over the Thames. As London grew, so more bridges were added, but these were all to the west of London Bridge, since the area east of London Bridge had become a busy port. In the 19th century, the east end of London became s

2、o densely populated that public pressure mounted for a bridge to the east of London Bridge, as journeys for pedestrians and vehicles were being delayed literally by hours.Finally in 1876, the Corporation of London, who were responsible for that part of the Thames, decided that the problem could be p

3、ut off no longer. Tower Bridge was completed in 1894, after 8 years of construction. However, many people dont realise why it is so different from Londons other bridges.How a Design was ChosenThe big problem for the Corporation of London was how to build a bridge downstream from London Bridge withou

4、t disrupting river traffic activities. To get as many ideas as possible, the Special Bridge or Subway Committee was formed in 1876, and opened the design of the new crossing to public competition.Over 50 designs were put forward for consideration, some of which you can see if you visit The Tower Bri

5、dge Exhibition. However, it wasnt until October 1884 that Horace Jones, the City Architect, in collaboration with John Wolfe Barry, offered the chosen design for Tower Bridge as a solution.The Building of the BridgeIt took 8 years, 5 major contractors and the relentless labour of 432 construction wo

6、rkers to build Tower Bridge.Two massive piers had to be sunk into the river bed to support the construction, over 11,000 tons of steel provided the framework for the towers and walkways. This was then clad in Cornish granite and Portland stone, both to protect the underlying steelwork and to give th

7、e bridge a more pleasing appearance.How it Works - Then NowWhen it was built, Tower Bridge was the largest and most sophisticated bascule bridge ever built (bascule comes from the French for see-saw). It was a hydraulically operated bridge, using steam to power the enormous pumping engines. The ener

8、gy created was then stored in six massive accumulators so that, as soon as power was required to lift the bridge, it was readily available. The accumulators fed the driving engines, which drove the bascules up and down. Despite the complexity of the system, the bascules only took about a minute to r

9、aise to their maximum 86 degrees.Nowadays, the bascules are still operated by hydraulic power, but since 1976 they have been driven by oil and electricity rather than steam. The original pumping engines, accumulators and boilers are on show as part of The Tower Bridge Exhibition, and you can also se

10、e the current machinery and control cabins when you come on a Behind The Scenes Tour. (Behind The Scenes Tours must be pre-booked)Interesting FactsTower Bridge has a fascinating history, which is explored in detail for visitors at The Tower Bridge Exhibition. Here are a few interesting facts you may

11、 not have known:1910 The high-level walkways, which were designed so that the public could still cross the bridge when it was raised, were closed down due to lack of use. Most people preferred to wait at the bottom and watch the bascules rise up!1912 During an emergency, Frank McClean had to fly bet

12、ween the bascules and the high-level walkways in his Short biplane, to avoid an accident.1952 A London bus had to leap from one bascule to the other when the bridge began to rise with the bus still on it.1977 Tower Bridge was painted red, white and blue to celebrate the Queens Silver Jubilee. (Befor

13、e that, it was painted a chocolate brown colour).1982 Tower Bridge opened to the public for the first time since 1910, with a permanent exhibition inside called the Tower Bridge Exhibition. The Walkways were glazed for the first time to house the new Exhibition.1993 The centenary exhibition - The To

14、wer Bridge Experience opened, featuring animatronic models telling the story of Tower Bridge.1994 Tower Bridge became available to hire for parties and receptions.2002 The current Tower Bridge Exhibition opened, refocusing on the magnificent views from the Walkways and the history of the Bridge.2003 Tower Bridge Exhibition came of age celebrating its 21st Birthday!

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!