wz云南烟叶醇化仓储中心项目施工组织设计1

上传人:仙*** 文档编号:74654934 上传时间:2022-04-14 格式:DOC 页数:156 大小:1.31MB
收藏 版权申诉 举报 下载
wz云南烟叶醇化仓储中心项目施工组织设计1_第1页
第1页 / 共156页
wz云南烟叶醇化仓储中心项目施工组织设计1_第2页
第2页 / 共156页
wz云南烟叶醇化仓储中心项目施工组织设计1_第3页
第3页 / 共156页
资源描述:

《wz云南烟叶醇化仓储中心项目施工组织设计1》由会员分享,可在线阅读,更多相关《wz云南烟叶醇化仓储中心项目施工组织设计1(156页珍藏版)》请在装配图网上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .云南烟叶醇化仓储中心项目(一期)二标段建设项目投标文件(技术标)招标编号:SZZB15G025 项目名称: 云南烟叶醇化仓储中心项目(一期)二

24、标段施工文件内容: 投标文件技术部分 投标人(盖公章): 法 定 代 表 人或其委托代理人(签字): 日 期: 年 月 日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to pro

25、vide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same.

26、 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service char

27、ges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up a

28、nd down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and

29、 the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Pla

30、nning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service ch

31、arges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount

32、 as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale

33、 of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th ch

34、apter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting docume

35、nts, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .目 录第一章 编制说明1一、编制原则1二、编制依据1三、 执行的规范标准1第二章 施工部署及组织机构31、施工原则及施工区域划分32、机构设置33、总包管理和与发包人、监理及设计人的配合4第三章 施工技术

36、方案5第一节 土建工程施工技术方案5一、测量方法5二桩基础施工7三、基础土方开挖及回填施工技术方案11四、基础工程施工方法17五、砌体工程30六、预埋件工程施工方法32七、装饰装修工程施工方法35八、门窗工程36九、地面工程38十、 涂饰工程40十一、脚手架工程施工方法42第二节钢结构制作安装施工技术方案55一、钢结构制作施工方法55二、钢结构安装方案62第三节 给排水安装施工技术方案73第四节 电气工程施工技术方案79第四章 主要施工工艺101第五章 冬季和雨季施工方案103第一节 冬季施工技术措施103第二节 雨季施工技术措施108第六章 质量承诺及保证措施110第一节 项目质量计划110

37、一、质量方针110二、质量承诺110三、质量目标110四、组织措施110五、计量管理111第二节 质量控制和保证措施111一、施工准备阶段的质量控制和保证措施111二、土建工程质量保证措施:112三、钢结构制作安装阶段的质量控制114五、电气工程质量控制保证措施115六、外观质量控制115七、交工验评阶段的质量控制115六、质量保证控制体系图116第三节 项目质量体系的运行117一、文件和资料的管理:117二、采购物资的管理117三、施工过程控制117四、检验和试验118第七章 安全文明施工及保证措施119第一节 安全管理目标与保证措施119一、安全生产方针及安全管理承诺119二、安全管理目标

38、120三、安全保证体系120四、施工安全管理120五、安全管理保证制度121第二节 文明施工保证措施128一、目标及承诺128二、场容场貌管理128三、施工现场管理129四、现场总图规划管理129五、生活卫生管理130第三节 环境保护措施130一、环境管理目标130二、环境保护措施130三、环境管理体系的审核132四、对周围管线、建筑物的保护措施132第三节施工场地治安保卫管理计划;133第八章 工期承诺和保证措施133一、工程工期承诺133二、工期保证措施133第九章 成品保护和工程保修措施和承诺136第十章 施工进度计划144第十一章 劳动力投入计划145第十二章 施工机械投入计划147第

39、十三章 施工总平面布置图151151151第一章 编制说明一、编制原则2.1.符合业主招标文件的要求,按照标书目标及要求来编制施工组织设计,积极响应招标文件;2.2.符合基建工程施工的程序和客观规律以及本项目施工的工程特点;2.3.以我公司先进的技术、装备、人员素质为基础,采取科学的施工方法、先进的管理模式、现代化的配置、完善的措施,实现创优目标;2.4.针对本工程的特点及现场条件,选取先进合理的施工工艺;二、编制依据3.1. 云南烟叶醇化仓储中心项目资格预审文件,(招标编号:SZZB15G025)。3.2. 现行的国家技术规范、规程及标准;3.2. 我司对工程地形状况的熟悉掌握;3.5. 我

40、公司承担类似工程的施工经验。 三、 执行的规范标准 序号法规、标准及规范名称法规/标准号1建设工程安全生产管理条例国务院令第393号2建筑施工安全检查标准JGJ59-20113用电安全导则GB/T13869-20084施工现场临时用电安全技术规范JGJ46-20055建筑施工现场环境与卫生标准JGJ146-20046建筑机械使用安全技术规程JGJ33-20017建筑施工高处作业安全技术规范JGJ80-918施工现场消防安全技术规范GB5072020119工程测量规范GB50026-9310钢结构施工规范GB50755-201211钢结构工程施工质量验收规范GB50205-200112建筑工程施

41、工质量验收统一标准GB50300-200113建筑钢结构焊接技术规程JGJ81-200214钢结构焊接规范GB50661-201115气焊、手工电弧焊及气体保护焊焊缝坡口基本形式与尺寸GB/T986-198816钢结构高强螺栓连接的设计、施工及验收规范JGJ81-199117钢结构制作安装施工规程YB9254-9518钢焊缝手工超声波探伤方法和探伤结果分级GB/T11345-198919金属熔化焊焊接接头射线照相GB/T3323-200520涂装前钢材表面锈蚀等级和除锈等级GB8923-198821建筑防腐蚀质量检验评定标准GB50224-9522钢结构防火涂料GB14907-200223钢结

42、构防火涂料应用技术规范CECS24-9024屋面工程施工质量验收规范GB50207-200225建筑工程施工质量评价标准GBT 50375-200626低合金高强度结构钢GB/T1591-200827碳素结构钢GB/T700-200628碳钢焊条GB/T5117-9529低合金钢焊条GB/T5118-9530气体保护电弧焊用碳钢、低合金焊丝GB/T8110-200831埋弧焊用碳钢焊丝和焊剂GB/T5293-199932埋弧焊用低合金钢焊丝和焊剂GB/T12470-200333六角头螺栓 C级GB/T5780-200034六角头螺栓GB/T5782-200035钢结构用高强度大六角头螺栓GB/

43、T1228-200636钢结构用高强度大六角头螺栓、大六角螺母、垫圈技术条件GB/T1231-200637冷弯薄壁型钢结构技术规范GB/T50018-200238建筑用压型钢板GB/T12755-9139建筑施工扣件式钢管脚手架安全技术规范JGJ130-200140纲结构焊缝外形尺寸JB/T7949-199941建筑结构用钢板GB/T19879-200542云南省建筑工程施工质量验收统一规程DBJ53/T-23-200843云南省建筑工程施工质量验收统一规程DBJ53/T-23-200844建筑地基处理技术规范JGJ79-200545建筑桩基技术规范JGJ94-200446混凝土结构工程施工规

44、范GB50666-200247给水排水构筑物工程施工及验收规范GB50141-200348屋面工程技术规范GB50345-200249建筑内部装修防火施工及验收规范GB50354-200550外墙外保温工程技术规程JGJ144-200451建筑钢结构焊接技术规程JGJ81-200252建筑基桩检测技术规范JGJ106-200353建筑地基基础工程施工质量验收规范GB50202-200254混凝土结构工程施工质量验收规范GB50204-200255钢结构工程施工质量验收规范GB50205-200156建筑装饰装修工程质量验收规范GB50210-200157给水排水管道工程施工及验收规范GB502

45、68-200858建筑施工安全检查标准JGJ59-201159建设工程文件归档整理规范GB/T50328-200160建筑工程施工质量验收标准GB50300-2001第二章 施工部署及组织机构1、施工原则及施工区域划分施工原则坚持先准备、后施工;先预制、后安装;先地下、后地上;先大件后小件;先室外、后室内,由低到高的施工顺序。根据厂房平面布置情况,拟将本工程施工化分为两个流水作业段,3#醇化库为第一个流水作业段,4#醇化库为第二个流水作业段,拟安排两个施工队同时施工。2、机构设置3、总包管理和与发包人、监理及设计人的配合3.1该工程不允许分包,不存在总包管理3.2与发包方配合(1)施工准备阶段

46、,项目经理参与工程合同的洽谈,明确施工方与业主方的责权关系,业主应为工程顺利开工提供材料、设计图纸、场地、外部水、电;施工单位应落实施工必需的劳动力、材料、机具、大临设施等。(2)施工单位主动配合业主,做好建设过程中的准备工作及时提出积极建议,想业主所想,急业主所急。(3)施工单位及时提出应由业主供应的设备、材料供应计划,并对业主提供的设备、材料进行交接、验收。(4)施工单位对工程质量严格要求,尊重业主的监督,对重要的隐蔽工程,请业主参加认证签字,方可进行下工序施工。并随时向业主提供材料、设备和报验单及隐蔽工程验收通知等资料。(5)工程施工过程中,出现承包合同条约以外的重大设计变更。材料代用等

47、时,施工单位及时向业主办理手续,业主应积极配合,以此作为交工和结算依据。工程全部竣工,双方应按规定办理交工验收手续,施工单位应在规定时间内提供完整的竣工资料,对验收过程中存在的问题,应采取有效措施,尽快达到设计、合同、规范要求。3.3与监理配合(1)开工前,施工单位为监理开展工作提供必要的条件。(2)工程施工过程中随时接受业主代表和监理单位对工程质量进行监督管理,配合好监理单位对施工质量的随时进行检查或委托有资格的质检部门进行重点抽查。为其开展工作提供方便,提供规定原始记录、检查记录技术及其它资料。(3)隐蔽工程验收提前通知监理,并提供完整的隐蔽工程验收资料,任何分项工程必须通过监理验收方可进

48、行下道工序,监理检查过程中提出的问题必须及时整改,整改合格后必须经过监理检验合格方可继续下道工序的施工。3.4与设计人配合(1)主动参与发包方组织的设计交底,认真领会设计意图。(2)基槽施工完后主动要求设计人员参与,基槽验收工作。(3)施工中发现设计问题,应及时与监理、设计人员联系现场处理。第三章 施工技术方案第一节 土建工程施工技术方案一、测量方法1.1 施工测量的准备工作: 了解工程的总体布局、定位及标高情况。 对图纸进行校核。 确定放线精度。 测量设备、仪器确保在有效期内。1.2 建筑定位放线: 根据工程场地实际情况,采用主轴线控制法,测设和作好建筑位置控制桩,形成“#”形主轴线平面控制

49、方案。控制点需作永久保护。以甲方测量队指定的基准点为基准,全站仪测设轴线控制网,并据此测量出建筑物各轴线。各控制点测定后用混凝土浇筑成300300500mm桩,顶面覆以2002004mm钢板,板面上刻十字作为桩点标志,并砌筑窨井式加以保护。 平面控制网的精度要求:根据建筑的结构和使用特点,布网精度为二级,测角中误差为 12,边长相对误差为 1/15000。 距离丈量方法:距离丈量采用I级钢尺,丈量时必须使用弹簧秤,并进行往返测量。并考虑尺长、温度、倾斜、拉力等各项改正数。具体公式为:(考虑采用标准拉力,则拉力改正数不计)式中:L-丈量时钢尺读数 t0-鉴定时标准温度 L0-实际距离 a-钢尺线

50、膨胀系数 L实-钢尺实际长度 t-测量时实际温度 L明-钢尺名义长度 h-两端高差 角度测设方法:如图所示: 根据已知的起始方向,测设角度:用正倒镜法测出AOB1后,用经纬仪精确测设出AOB1=1,1与的差为,过B1点作OB1,并量取距离。 建筑物高程控制网测设:高程引入采用昆钢设计院测量队指定的已知水准点进行测设,本工程布设4个临时水准点,组成建筑物的高程控制网,控制网的测量采用附和测法。闭合差的要求: L:为附和线路长度。 测设轴线控制桩:根据已布好的建筑物平面控制网,测设轴线控制桩,测设时以两端控制桩为准,测定该边的控制桩,并校核各桩间距,精度同平面控制网。1.3 基础开挖和基础施工放线

51、: 桩位放线依据所测定的各轴线及柱中心与轴线的相互关系定出桩位,并据各种桩型直径+300mm撒出桩孔开挖线。 基坑(槽)开挖放线 根据轴线控制点,按图纸尺寸撒出基坑(槽)开挖边线及放坡线。 基坑(槽)开挖接近槽底时,随时进行抄平,及时在基底按3m3m设标高控制点,并在槽壁上测设出标高控制桩。基底标高允许误差为10mm。 基坑(槽)经相关部门验收合格后,在基底上测设垫层标高,每隔米测设一个标高并做上灰饼。 基础施工放线: 做完垫层后,检查垫层标高。 用经纬仪将控制线投测在垫层上,经闭合校测后,按设计图纸测设出轴线及墙、柱的位置线。 以轴线为准,检查垛子、管道穿墙孔洞、重要埋件等位置。 模板上口轴

52、线位移不得超过mm,内墙用线坠检查,外墙用经纬仪检查。1.4 安装工程施工测量:(1) 钢结构柱施工测量: 钢柱制作完毕后,在钢柱上测设标高点,用油漆标注,作为安装时标高控制的依据。 柱吊装时,用经纬仪校核钢柱垂直度,校核时用经纬仪在相互垂直的两轴线上同时测量(2)标高的传递方式采用起始点均以首层50cm控制线为准处进行传递, 标高传递时采用钢尺沿铅直方向(经纬仪配合)向上量至安装层。钢尺丈量时应考虑各项改正数。(3)放线前应在平面上校核轴线,闭合后测设安装“十”字线。二桩基础施工2. 1测量定位1、桩位测设及复测桩位测设采用NTS352全站仪测量。施测前测量工程师应根据现场测量平面控制网计算

53、出每一根桩的方位角和距离,施测时直接定桩中心点。桩位测设完成后,应按相关规定进行复测,复测采用全站仪测量。 测量时先定建筑各轴线位置及必要的控制线,再根据轴线位置关系用钢尺量出每一根桩的中心位置,并与测设的桩中心位置相复核,偏差大于规范规定的应重新测量。用全站仪测设桩位和复测不得由一个人进行。2、标高测量压桩施工的标高测量主要指桩中心自然地面标高测量和送桩阶段的标高测量。标高控制应根据已经通过监理工程师复核的高程控制网引出标高到施测现场,并进行测量作业。3、测量误差要求 桩基础测量误差不得大于工程测量规范及设计文件允许的偏差范围。2. 2 引孔本工程拟选用长螺旋桩机取土引孔。在施工过程中若遇地

54、下水较多,长螺旋桩机无法施工时,可使用回转钻施工方法进行引孔。施工方法1、钻机就位:钻机就位后,应使钻杆垂直对准桩位中心,确保桩身垂直度容许偏差不大于1%。现场采用经纬仪控制垂直度,也可采用钻机自带垂直度调整器控制钻杆垂直度。每根桩施工前现场工程技术人员进行桩位对中及垂直度检查,满足要求后,方可开钻。2、钻进成孔:钻孔开始时,关闭钻头阀门,向下移动钻杆至钻头触地时,启动马达钻进,先慢后快,同时检查钻孔的垂直偏差并及时纠正。在成孔过程中发现钻杆摇晃或难以下钻时,应放慢进尺,防止桩孔偏斜、位移和钻具损坏。根据钻机塔身上的进尺标记,成孔达到设计标高及设计持力层并经监理工程师检查后,停止钻进进行终孔。

55、钻进过程中,排出孔口的土应随时清除、运走。3、钻机在钻进过程中,不宜反转或提升钻杆。4、钻机在钻进过程中,为保证垂直度,应采用小压力慢转速旋挖,不可进尺太快。一定要密切注意孔壁稳定,预防由于场地局部土层的变化引起孔壁坍孔、缩径等质量问题,若出现类似问题,及时上报甲方及监理,并及时采取相应处理措施。 引孔成形后,清理多余土方,及时进行压桩施工。2.3混凝土的浇筑1、混凝土的运输为了确保混凝土浇注质量,混凝土主要采用商品泵送混凝土,连续浇注。其他少量混凝土采用现场搅拌,混凝土的运输采用混凝土翻斗车从搅拌站运至塔吊服务半径范围内。2、振捣方式振动器插点要均匀排列,可采用“行列式”或“交错式”的次序移

56、动,不应混用,以免造成混乱而发生漏振。振动器的操作,要做到“快插慢拔”。每一插点要掌握好振捣时间,过短不易捣实,过长可能引起混凝土产生离析现象。一般每点振捣时间应视混凝土表面呈水平不再显著下沉,不再出现气泡,表面泛出灰浆为准。现场配备50和30振动器,加强对钢筋密集处和截面较小处的振捣。3、混凝土的浇筑要求(1)为了避免发生离析现象,混凝土自高处倾落时,其自由倾落高度不宜超过2m,如高度超过2m,应设串筒、溜槽。为了保证混凝土结构良好的整体性,混凝土应连续进行浇筑,不留或少留施工缝,如必须有间隙时,间隙时间应尽量缩短,并应在上一层混凝土初凝前将次层混凝土灌筑完毕。(2)灌筑每层竖向结构时,为避

57、免墙脚产生蜂窝现象,在底部应先铺一层510cm厚同混凝土标号减石子砂浆,以保证接缝质量。(3)在进行墙体混凝土浇筑前,应对墙体钢筋的分布情况全面了解。尤其对暗柱、门窗洞口过梁及洞口加筋等钢筋较密的部位,进行技术处理,局部加大钢筋的间距,找出下棒的位置,并在模板上或相应钢筋位置做出明显标注,以备在混凝土浇筑时使用。(4)混凝土浇筑应分层振捣,每次浇筑高度应不超过振动棒有效长度的1.25倍,即不得超过500mm;在振捣上一层时,应插入下层中50mm左右,以消除两层之间的接缝。下料点应分散布置,一道墙至少设置两个下料点,门洞口两侧应同时均匀浇筑,以避免门口模板位移。(5)在浇筑中应使用标尺竿进行配合

58、,来保证振捣器插入深度。(6)混凝土浇筑过程中,要保证混凝土保护层厚度及钢筋位置的正确性。不得踩踏钢筋,移动预埋件和预留孔洞的原来位置,如发现偏差和位移,应及时校正。特别要重视竖向结构的保护层和板负弯矩部分的位置。(7)在浇注混凝土前,为了保护未浇注混凝土的钢筋,采取包裹钢筋的方法。要求包裹材料要防水,保护材料不得超过浇注高度。2.4紧急状态下的施工缝处理措施如果在施工中出现紧急情况又无法解决时,则留设施工缝。在下次浇筑混凝土前将接搓处的混凝土凿掉,表面做凿毛处理,保证混凝土接搓处强度和抗渗指标。施工缝应尽量留置在如下部位:有主次梁的楼板,宜顺着次梁方向浇筑,施工缝应留置在次梁跨度的中间三分之

59、一范围内;墙,留置在门洞过梁跨中1/3范围内,也可留在纵横墙的交接处。2.5混凝土养护1、降低混凝土块体里外温度差和减慢降温速度来达到降低块体自约束应力和提高混凝土抗拉强度,以承受外约束应力时的抗裂能力,对混凝土的养护是非常重要的。2、混凝土浇筑前,应准备好在浇筑过程中所必须的抽水设备和防雨防暑措施。3、当气温较高时,覆盖浇水养护应在混凝土浇筑完毕后的12小时以内进行。4、混凝土的浇水养护时间不得少于28天。2.6质量保证编制完善的混凝土浇筑施工方案,建立质量保证责任制,现场由执行经理牵头,质检部负责实施,现场统一协调,统一管理,精心安排施工。确保混凝土原材料质量和浇筑质量,并随时进行混凝土各

60、指标的测试、现场施工工序的监督,严禁现场违反操作规程和施工规范施工。2.7混凝土试块留置各构件拆强度以及同条件强度试块预留结构类型拆模要求试块留置组数竖向结构混凝土强度达1.2Mpa以上或24小时后留置同条件试块2组楼梯支撑强度过100%以上留置同条件试块2组悬臂梁板强度过100%以上留置同条件试块2组梁板(跨度8m)80%按80%强度留置试块2组三、基础土方开挖及回填施工技术方案1、 土方开挖施工技术方案及质量保证措施 1.1 主要机具: 1.1.1 挖土机械有:挖土机、推土机、铲运机、自卸汽车等。 1.1.2 一般机具有:铁锹(尖、平头两种)、手推车、小白线或20号铅丝和钢卷尺以及坡度尺等

61、。1.2 作业条件: 1.2.1 土方开挖前,应多方调查详细了解施工场地情况,将施工区域内的地下、地上障碍物清除和处理完毕。 1.2.2 建筑物或构筑物的位置或场地的定位控制线(桩)、标准水平桩及开槽的灰线尺寸,必须经过检验合格;并办完预检手续。 1.2.3 夜间施工时,应有足够的照明设施;在危险地段应设置明显标志,并要合理安排开挖顺序,防止错挖或超挖。 1.2.4 开挖有地下水位的基坑槽、管沟时,应根据当地工程地质资料,采取措施降低地下水位。一般要降至开挖面以下0.5m,然后才能开挖。1.2.5 施工机械进入现场所经过的道路、桥梁和卸车设施等,应事先经过检查,必要时要进行加固或加宽等准备工作

62、。 1.2.6 选择土方机械,应根据施工区域的地形与作业条件、土的类别与厚度、总工程量和工期综合考虑,以能发挥施工机械的效率来确定。 1.2.7 施工区域运行路线的布置,应根据作业区域工程的大小、机械性能、运距和地形起伏等情况加以确定。 1.2.8 在机械施工无法作业的部位和修整边坡坡度、清理槽底等,均应配备人工进行。 1.2.9 熟悉图纸,做好技术交底。3 、 操作工艺 3.1 工艺流程:确定开挖的顺序和坡度分段分层平均下挖 基础梁及承台土方开挖 修边和清底 3.2 坡度的确定:3.2.1 在天然湿度的土中,开挖基础坑(槽)、管沟时,当挖土深度不超过下列数值规定时,可不放坡,不加支撑。 3.2.1.1 密实、中密的砂土和碎石类土(充填物为砂土)一1.0rn。 3.2.1.2 硬塑、可塑

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!