最新挂蓝施工工艺简介

上传人:仙*** 文档编号:54096789 上传时间:2022-02-12 格式:PPT 页数:44 大小:6.97MB
收藏 版权申诉 举报 下载
最新挂蓝施工工艺简介_第1页
第1页 / 共44页
最新挂蓝施工工艺简介_第2页
第2页 / 共44页
最新挂蓝施工工艺简介_第3页
第3页 / 共44页
资源描述:

《最新挂蓝施工工艺简介》由会员分享,可在线阅读,更多相关《最新挂蓝施工工艺简介(44页珍藏版)》请在装配图网上搜索。

1、1in which we have developed our knowledge and learn our skills.234 现浇混凝土及预制节块桥梁. 现浇混凝土桥梁(上行式及下行式) 预制节块施工 上行式及下行式567891011跨度 15 - 80 m一般适用长度 500m 以上施工周期/孔6 10 天12跨径: 20 100m一般施工长度: 最少 600 - 800 节块一般施工周期/孔1-2 天 / 孔13跨度: 60 300m一般施工周期:2 x 1 节段 / 周1415标准建桥者挂蓝每次浇注节段长度为5米,荷载(混凝土+模板)为100-600吨,用钢量为25吨-110吨。

2、标准建桥者可适用于几乎各种桥梁断面。当桥梁宽度,节段高度,翼板厚度发生变化时调整十分方便。 16 一般适用节块长度为3-5米,重量100-400吨。使用液压系统推进。横坡纵坡均可调整。 预制节块拼装挂蓝几乎可适用于未来项目的任何断面。 17FREE CANTILEVER BRIDGES WORLDS LONGEST SPANS No. 项目项目名称名称 Country 跨度跨度 Construction 设备设备提供商提供商 1 Stolmasundet bro Norway 301 1998 NRS 2 Raftsundet, Lofoten Norway 298 1998 NRS 3 Hu

3、men, Pearl River China 270 1997 4 Varrod bro, Kristiansand Norway 260 1993 NRS 5 Gateway bridge, Brisbane Australia 260 1986 NRS 6 Skye bridge UK 250 1995 7 Ponte San Joao , Porto Portugal 250 1991 NRS 8 Talbvergang Schottwien Austria 250 1989 9 Northumberland Strait Crossing Canada 250 1997 10 Chev

4、ire Viaduct, Nantes France 242 1991 14 Norddalsfjord bro Norway 231 1987 NRS 19 Stovset bro Norway 220 1993 NRS 18The use of rectangular hollow sections in the main structural components and recoverable high strength bars in all stays and ties reduces the total steel weight to a minimum. The Bridgeb

5、uilder may be adapted to almost any cross-section and is easily adjustable during operation to variations in segment length, box height, web thickness, deck width and road alignment (gradient, curvature, super-elevations). The vertical deflection at the front of the Bridgebuilder is less than 25 mm

6、at maximum load. Formwork beams are designed for a maximum deflection of L/400 of their length. One Bridgebuilder may be assembled in one week. Rolling forward on rails, the reset time is short. 1920主轨主轨液压油缸液压油缸下拉油缸推进油缸主千斤顶主千斤顶21前后工作车前后工作车主轨主轨液压油缸液压油缸22前后工作车前后工作车主轨主轨液压油缸液压油缸主框架主框架23前后工作车前后工作车主轨主轨液压油

7、缸液压油缸主框架主框架 前后框架前后框架底框架底框架横梁横梁内模内模24前后工作车前后工作车主轨主轨液压油缸主框架主框架前后框架前后框架底框架底框架横臂横臂内模内模外模外模底模底模内模内模25前后工作车前后工作车主轨主轨液压油缸液压油缸主框架主框架前后工作车前后工作车底框架底框架横梁横梁液压油缸液压油缸内模内模外模外模底模底模内模内模端模端模工作平台工作平台2627挂蓝除内模部分移动到新的混凝土浇注位置。 调整外模,并将其固定。底板及翼板钢筋绑扎内模推进顶板钢筋绑扎底板及翼板混凝土浇注,顶板混凝土在间隔一定时间后浇注,也可在第二天浇注。养护完成后张拉。松开模板,推进挂蓝。多数情况下施工周期为1

8、周,也有4-5天的实例。 28在墩顶长度仅为3米的情况下用挂蓝施工的方法。3 m在3米长的墩顶上安装29When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the

9、above 4 phases.在墩顶两侧浇注混凝土30When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.将建桥者分开31Wh

10、en the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.将建桥者分开32When the pier head is too small

11、 to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.完成12米墩顶混凝土,可进行标准挂蓝施工33When the pier head is too small to allow norma

12、l assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.完成12米墩顶混凝土,可进行标准挂蓝施工34When the pier head is too small to allow normal assembly of t

13、he Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.完成12米墩顶混凝土,可进行标准挂蓝施工35When the pier head is too small to allow normal assembly of the Bridgebuilde

14、r, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.完成12米墩顶混凝土,可进行标准挂蓝施工36When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented

15、 Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.完成12米墩顶混凝土,可进行标准挂蓝施工37Stolmasundet Bridge, Norway目前世界挂蓝施工的跨度最长的混凝土桥梁目前世界挂蓝施工的跨度最长的混凝土桥梁主孔主孔: 301 m桥宽桥宽: 12,1 m最大荷载最大荷载 :160 tons

16、施工周期施工周期:2 x 1 segment per week38Puente Internacional sobre el Rio Guadiana, Spain/Portugal最大荷载最大荷载 :155 tons最大桥梁宽度最大桥梁宽度: 18 m 最大箱梁宽度最大箱梁宽度:11 m 最大浇注长度最大浇注长度:4,5 m39Varodd Bridge, 挪威挪威40Seo Hae, 韩国韩国41Wadi Akbara Bridge, 以色列以色列最大跨度最大跨度:80 m最大荷载最大荷载 :150 tons最大桥宽最大桥宽: 13,7 m 最大箱梁宽度最大箱梁宽度:5,5 m 最大节段长度最大节段长度:4,5 m42Frouzi, 希腊克里克岛希腊克里克岛Main Span:72 mMax. Load Capacity:165 tonsMax. road width: 14,1 m Max. box width:8,0 m Max. length of segment:5,0 m43Frouzi, 希腊克里克岛希腊克里克岛44美国哥伦比亚河大桥美国哥伦比亚河大桥最大跨度最大跨度 :170 m最大荷载最大荷载 : 360 tons最大桥宽最大桥宽: 15 - 22 m 最大箱梁宽度最大箱梁宽度:(6,5 - 8,0) x 2 m最大浇注长度最大浇注长度: 5,0 m

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!