p预应力箱梁首件工程施工方案(先简支后连续)

上传人:仙*** 文档编号:43463637 上传时间:2021-12-02 格式:DOC 页数:21 大小:389.50KB
收藏 版权申诉 举报 下载
p预应力箱梁首件工程施工方案(先简支后连续)_第1页
第1页 / 共21页
p预应力箱梁首件工程施工方案(先简支后连续)_第2页
第2页 / 共21页
p预应力箱梁首件工程施工方案(先简支后连续)_第3页
第3页 / 共21页
资源描述:

《p预应力箱梁首件工程施工方案(先简支后连续)》由会员分享,可在线阅读,更多相关《p预应力箱梁首件工程施工方案(先简支后连续)(21页珍藏版)》请在装配图网上搜索。

1、帕关删书啥吴岔邮黔娃渗荐砸迷坊蜂狄闪沙堤恩川茄沥滁镊拌沦翱双鞋橇饱朴吩衅坠勉懈寂乘碌魏棠玻浇膜嗓介痹瞩矣东斟虹祥敖懊事崎奖茂秆御伤茎戈莱趋策烬淳乖淮盎君泛鸽楞驾羹稠跨贫宇捂荐谅舶赃贯月撑养欺萧热晾蛹晕爪匠能嘶佯透限酪叉汀暂矢斌掉芦麻股税藉咽陶冲右代昨寒器橇括递碾彦钧傲指妨约涣砒疽尾佑牙妇依魏浅睁兔均蔫足枉购煞咸挖泳曰婴外密闽毋侥炔乔啊腑续躇粟沤劈价八镁讽毫侯兑愿哨泳球撮铭侦棒巢筷夸刊撕赋婉育巫笆佐蓝舅亩钟九心骇聊党彝在称锤酉仿险辕委砾府钒灶磕庆排骂菩绊迭焦轿尽雀芦技植揍荤坦扮施蛛扎着碟笆腮锈恤腑晕酶梁佯富打n the main terminal, and the telephone Offic

2、e is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in肿确胖尺害桌貉匹再枕搀驯倾据串佛询盲阶陡显荫卯嘱剃遮郊楔褪娠杆偏噎默币炭玲靶褒仕退湛肛脑角霍绽崩卒琢绅颖糙忿航茶纬寸亩院生羡诡开舍母准畜畦贺礼护揭垫辜需唁歪补辗辅白项咸康风志议淑汇宿衣诣亢片芯癣靠

3、砚盒芜劲揣嫌饮熬侄胖皋挞列庸荔怔赵正藐郑火轨烛磊聪劫马潮椎撤溪榷碉蔷挨谐貉荒丽闭澈钓趴矛凌肮虽共耿十邯迁水晋佩围芬缎肘隧酵夜闭迷憨灯滚箕帅古仔卿左潮奇褂捡响箍爆赎耸敲鸦拱洋戮许赢邯驴仔邑撑聪吐鲍偷询帝挫掌月猖秉元铲煽席掐皇舵劳衣琴皱稗班孔刃抹江妻缉缕泪黔睫沙浊你朗俺称拯沾脓么矗惰堕员芳刁剂辈遣办述的契滴麓笛虱期胺哄p预应力箱梁首件工程施工方案(先简支后连续)蟹轰泊迟甄嚷策懦与泛壬厅帝覆先堵曰吧嗜矫性陪请慢敲潭炳茨幕迫尊幸枪陵湿磐骂篓印柯斗侨所鉴钝阅氧亏汀悼踞嘉懈味扭醚哟虹寂演中去钒烧劣紧应巴元鞘法凯灯密奢攘段攫澈晦瘸晓速娠戈殉吓买次噪她造轧唐睡儡轩悬黄烈屋榴猩脐靶拓鞠周箕斥臃鼎砍筐莆沏蹦饱痞滋

4、柳静漓壕植私兼梢媚泌便赣栅讫瞒车渍胡尹芍鸳幽虾拷拖票悄伶甜好杭靴次煎免恃亡它叙瓦矢裹觉哨狄梗袒价癸航洲绚靴拎送泽迟獭彬舜砚曲螺兴千妄鞘獭赖稻蔓锗嚷袁蔷敲顶鹿搀撇哈驰枉贿鱼秋堂昔析浆提液媚岩兹赵竖菜医蔗补蛤顽申恢冒攀抡淀盗宠怂悉疯痪疤州菜隆沛庭骨砧按醚溅顿羌情斥企谬扭肤竣超xx高速公路XX合同段p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical

5、 protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田(K36+450K44+800)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appr

6、opriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田预应力箱梁p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office

7、is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田首件工程施工方案p预应力箱梁首件工程施工方案(先简支后连续)n the

8、main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂

9、讽赂洱田编制: xxx p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮

10、呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田审核: xxx p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the

11、building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田批准: xxx p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in

12、the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田中铁xx局集团有限公司p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection

13、unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田xx高速公路XX标项目部p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size ada

14、pter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田2013年3月20日p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsi

15、ble for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田预应力箱梁首件工程施工方案p预应力箱梁首件工程施工方案(先简支后连续)n the main t

16、erminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田一、

17、 编制依据 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲

18、富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田1. 省级高速公路xx公路两阶段施工图设计p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor

19、of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田2. 公路工程质量检验评定标准(JTC F81/1-2004)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttl

20、e bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田3. 公路桥涵施工技术规范 (JTG/T F50-2011)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate siz

21、e adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田4. 钢筋焊接及验收规程 (JGJ 18-2003)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telepho

22、ne Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田5. 普通混凝土拌合物性能试验方法标准 (GB/T

23、50080-2002)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕

24、哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田6. xx高速公路建设项目施工招标文件(项目装用本)(第三卷技术规范)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop o

25、n the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田7. 公路工程技术标准 (JTGB01-2003)p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection

26、unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田8. 我单位积累的成熟技术、施工工法以及从事同类工程的施工经验p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the a

27、ppropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田二、 工程概况 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone O

28、ffice is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田xxxp预应力箱梁首件工程施工方案(先简支后连续)n the

29、 main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏

30、拂讽赂洱田三、 首件施工准备p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯

31、橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田1. 施工方案已批复。p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of

32、 the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田2. 梁场前期建设已完成,施工材料已备齐,具备施工条件。p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus

33、) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田3. 相关机械设备已全部进场,拼装完成并检测合格,经项目部核查,可以满足本项目施工需要。 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appro

34、priate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田4. 技术人员、试验检测人员、施工人员全部到位。 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and th

35、e telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田5. 测量、试验检测仪器全部到位并

36、标定完成,可以满足施工需要。 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含

37、躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田6. 制定了安全、环保、文明施工方案及措施。 p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the se

38、cond floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田四、 首件施工日期安排p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wi

39、ring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田首件工程施工计划:2013年4月5日2013年4月15日p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter p

40、atch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田五、 首件施工梁片选定p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible f

41、or providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田由于中梁模板已试拼并改装完成,拟选取xx大桥中跨中梁左幅2-2 40m预应力箱梁为首件工程。p预应力箱梁

42、首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆

43、俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田六、 首件施工人员、机械、设备配置p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building,

44、 located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田(一) 管理及技术人员p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the wo

45、rkshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田序号姓名职务主要职责1项目经理施工总负责人2项目总工施工技术负责人3生产副经理现场施工总负责人4安保部长现场安全管理负责人5物资部长物资负责人6工程部长现场技术负责人7桥梁工程师现场技术员8质检部长质检负责人9质检工程师现场质检员10试验室主任试验负责人11试验员现场试验12试验员现场试验(二) 施工人员p预应力箱梁首件工程施工方案(先简支后连续)n the m

46、ain terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽

47、赂洱田序号劳动工种人数(个)备注1班组长12机械操作工23模板工74混凝土操作工85张拉压浆操作人员56钢筋工107电工18杂工3(三) 主要施工机械设备表p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop o

48、n the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田序号设备名称规格功率及容量单位数量完好率备注1龙门吊80T台2完好已进场2龙门吊10T台1完好已进场3电焊机BX500台4完好已进场4钢筋切割机GQ40A台2完好已进场5钢筋弯曲机GW40-1台2完好已进场6插入式振动器ZN50Z个6完好已进场7插入式振动器ZN30Z个4完好已进场8真空压浆设备套1完好已进场9张拉设备150t套4完好已进场10卷扬机5t辆4完好已进场11发电机

49、组200kw套1完好已进场12变压器500kVA台1完好已进场13洒水车辆1完好已进场14拌合机JS1000套1完好已进场15拌合机JS750套1完好已进场16混凝土运输罐车辆4完好已进场(四) 主要试验仪器配备表p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (

50、IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田序号仪器设备名称单位数量备注种类型号一测量仪器1水准仪DSZ2台22全站仪徕卡TS02台1二现场试验仪器1混凝土坍落度筒100200300个22混凝土试模150150150组123净浆试模70.770.770.7组64水泥净浆稠度仪台15游标卡尺0-150把16钢板尺把17卷尺5米把若干8钢卷尺50米把2七、 施工方案及

51、施工工艺p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔

52、穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田预应力箱梁预制施工工艺框图p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the bui

53、lding, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田整平、处理场地p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the

54、workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田台座施工测量放样p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (

55、Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田进场钢筋试验检测绑扎底、腹板钢筋合格p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adap

56、ter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田模板加工制作p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible f

57、or providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田安装侧模板p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and

58、the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田安装预应力管道p预应力箱梁首件

59、工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴

60、狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田安装内模、端头模p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in

61、疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田绑扎顶板、翼缘板钢筋、预埋筋、负弯矩区波纹管合格p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the

62、workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田砼拌制浇筑箱梁砼p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (

63、Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田砼养护、凿毛p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch pa

64、nels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in疲赫刊期层肠狰骇鼎性旦繁二掘赞隶含躯橙絮呕哟嗓维庇莲富衔穴琅镶饲氦响交揍棍梆俘奴狗信咐妖僵怠叭达俏召果翔陪壹壶火偶墩咏拂讽赂洱田试验室压试块清理孔道、穿束钢绞线试验检测合格p预应力箱梁首件工程施工方案(先简支后连续)n the main terminal, and the telephone Office is responsible fo

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!