1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .四、施工组织设计第一章 施工方案与技术措施1第一节 编制说明11.1.1编制依据11.1.2编制原则1第二节 工程概况31.2.1工程设计情况

24、31.2.2工程地质及水文情况51.2.3工程沿线施工环境5第三节 施工组织及总体部署61.3.1施工管理目标61.3.2施工组织机构设置71.3.3施工现场平面布置171.3.4施工进度计划安排191.3.5资源配置计划201.3.6主要原材料、混合料采购办法241.3.7资金投入及使用计划25第四节 施工准备271.4.1施工技术准备271.4.2设备与物资准备281.4.3施工组织准备29第五节 施工测量方案311.5.1测量技术标准311.5.2测量设施人员配备311.5.3施工测量方案32第六节 拆迁施工方案361.6.1拆迁工程概况361.6.2绿化工程移植施工361.6.3地上建

25、筑物改移施工37第七节 施工期间交通组织方案401.7.1交通导流组织原则401.7.2施工现场的交通组织原则、方法401.7.3施工现场周边道路的交通组织原则、方法41第八节 雨水管道施工方案431.8.1沟槽开挖431.8.2雨水管线施工方案441.8.3雨水方沟施工方案471.8.4井室砌筑481.8.5雨水口施工491.8.6土方回填50第九节 道路工程施工方案571.9.1路基施工方案571.9.2石灰粉煤灰碎石底基层、基层施工方案581.9.3透层、粘层、封层施工611.9.4沥青砼面层施工方案631.9.5道路附属工程施工方案71第十节 主要施工技术措施731.10.1雨季施工措

26、施731.10.2成品保护措施74第十一节 技术资料管理措施771.11.1施工技术资料管路总体要求771.11.2施工资料管理措施77第十二节 项目风险预测与防范,事故应急预案791.12.1项目风险预测与防范791.12.2事故应急预案79第十三节 其他说明的事项821.13.1农民工工资支付保障措施821.13.2廉政建设措施821.13.3缺陷责任期对工程修复措施82第二章 质量管理体系与保证措施83第一节 质量方针、目标与承诺832.1.1质量目标832.1.2质量方针832.1.3质量承诺83第二节 质量管理体系842.2.1质量管理机构及质量职责842.2.2质量保证体系的建立和

27、运行852.2.3质检保证体系852.2.4试验保证体系852.2.5测量保证体系862.2.6现场过程质量控制体系862.2.7质量管理例会制度与质量奖惩制度体系86第三节 质量管理制度922.3.1技术交底制度922.3.2自检、互检、交接检制度922.3.3质量责任制度922.3.4隐蔽工程检查签证制度922.3.5原材料、成品和半成品的现场验收制度922.3.6岗位易人审批制度922.3.7质量事故申报制度922.3.8施工资料归档制度932.3.9测量双检制度932.3.10 奖惩制度932.3.11例会制度93第四节 质量保证措施942.4.1建立完善适用的管理制度942.4.2细

28、致严谨的过程控制942.4.3施工准备阶段保证措施952.4.4施工实施阶段保证措施952.4.5试验和检测962.4.6人员保证972.4.7设备保证972.4.8材料保证972.4.9技术保证97第五节 分项工程质量控制措施992.5.1路基填筑施工质量控制992.5.2二灰稳定碎石施工质量控制1002.5.3沥青面层施工质量控制措施1012.5.4路缘石施工质量控制措施1022.5.5交工验收阶段质量控制103第六节 质量通病与预防措施1042.6.1石灰粉煤灰稳定粒料质量通病1042.6.2沥青混合料面层质量通病1072.6.3人行道及附属设施质量通病109第七节 保修服务1122.7

29、.1服务宗旨1122.7.2售后服务管理1122.7.3售后服务112第三章 安全和绿色施工保障措施114第一节 安全管理体系及安全目标1143.1.1体系的建立1143.1.2项目安全目标116第二节 安全施工保障措施1173.2.1项目主要人员安全职责1173.2.2安全管理制度1193.2.3安全隐患分析、控制1213.2.4施工现场安全措施1213.2.5施工机械安全控制措施1233.2.6分部分项工程安全措施1243.2.7安全技术措施的交底1253.2.8消防保卫措施125第三节 文明施工保证措施1283.3.1管理目标1283.3.2文明施工管理组织体系1283.3.3文明施工管

30、理制度1283.3.4施工现场形象宣传管理1283.3.5施工现场场容管理1293.3.6施工现场料具管理1303.3.7现场卫生管理1303.3.8环境卫生管理1303.3.9夜间施工管理1313.3.10防疫管理131第四节 环境保护保证措施1333.4.1制定环境保护组织体系1333.4.2本工程环境因素分析1333.4.3针对不同噪声源的控制措施1333.4.4噪音扰民预防措施1343.4.4水污染控制管理1343.4.5固体废弃物控制管理1353.4.6施工现场扬尘污染防治措施135第五节 工程协调配合措施1373.5.1与设计单位的协调配合措施1373.5.2与监理工程师的协调配合

31、1373.5.3与管线单位的协调配合1373.5.4与供货商的协调配合1373.5.5与园林和文物保护单位的协调配合1373.5.6与市政、交通等其他相关单位的协调配合措施1373.5.7与受施工影响的单位和居民之间的协调配合138第六节 突发事件的处理方案1393.6.1生产安全事故应急救援组织机构1393.6.2生产安全事故应急救援程序1393.6.3生产安全事故应急救援预案1393.6.4施工现场防控传染病措施140第七节 廉政建设措施1423.7.1组织领导1423.7.2廉政行为规范1423.7.3廉政责任1423.7.4廉政监督机制1423.7.5廉政检查考核1433.7.6廉政责

32、任追究143第四章 工程进度计划与保证措施145第一节 施工总体进度计划安排1454.1.1计划总工期1454.1.2阶段进度计划安排145第二节 工期保证措施1464.2.1工期保证机构1464.2.2工期提前保证措施1464.2.3工期保证措施1464.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in

33、 the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (inc

34、luding supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the in

35、terim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of th

36、e specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been

37、 produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge con

38、trol the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the

39、interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be impo

40、rtant, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of no

41、tification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the for

42、m of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file;

43、the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .V第一章 施工方案与技术措施第一节 编制说明1.1.1编制依据1.1.1

44、.1招标文件及相关资料(1)东关南街(京港澳高速公路城内街)道路工程施工总承包招标文件。(2)东关南街(京港澳高速公路城内街)道路工程施工图招标文件。 (3)东关南街(京港澳高速公路城内街)道路工程雨水工程施工图招标文件。(4)现场考察所获取的资料。1.1.1.2工程建设标准(1)施工技术规范、规程北京市城市道路工程施工技术规程(DBJ01-45-2000);北京市城市桥梁工程施工技术规程(DBJ01-46-2001);北京市给水排水管道工程施工技术规程(DBJ01-47-2000);公路路面基层施工技术规范(JTJ0342000);公路沥青路面施工技术规范(JTG F40-2004);公路工

45、程技术标准(JTG B01-2003);公路路基施工技术规范(JTG F102006);公路桥涵施工技术规范(JTG/T F50-2011);公路工程施工安全技术规程(JTJ07695);给水排水管道工程施工及验收规范(GB 50268-2008)(2)质量检验评定标准城镇道路工程施工与质量验收规范(CJJ1-2008);北京市城市道路工程施工技术规程(DBJ01-45-2000);给水排水管道工程施工及验收规范(GB50268-2008);公路工程质量检验评定标准(JTG F80/12004);市政道路工程质量检验评定标准(CJJ12008);市政桥梁工程质量检验评定标准(CJJ22008)

46、;1.1.2编制原则根据招标文件要求,以现场考察踏勘为基础,按照“提高质量,确保安全,文明施工,均衡生产,降低成本,如期高效”的项目管理思路;全面体现“绿色北京、科技北京、和谐北京”的理念,确定施工组织设计编制原则如下:(1)确保工期原则根据招标文件对本合同段工期要求,编制科学、合理、周密的施工方案;采用信息化管理技术,实行网络控制,科学安排工程进度,确保实现工期目标,满足建设方要求。(2)精品工程管理原则实施比施工规范要求更高的技术和质量标准,项目实施过程中,对质量、工期、安全生产、文明施工、交通组织及环境保护各个环节的管理,更加规范和严格。强调过程控制和可追溯性、强调工艺和质量记录、通过贯

47、彻执行ISO9001质量体系标准,积极推广使用四新技术,进一步强化质量管理,确保精品工程的实现。(3)安全第一原则施工组织设计编制,始终按照技术可靠、措施得力、确保安全的原则确定施工方案。施工全过程中,充分考虑各种安全因素,保证安全措施落实到位,确保在万无一失的前提下组织本工程施工。(4)确保畅通原则充分考虑本工程的特点、重点及施工难点。采用成熟、可靠、先进、有效的施工方法,以确保现况交通安全、少占用道路为原则,尽量减少对现况交通的干扰,保证交通线路的安全畅通。(5)方案优化原则采用新技术、新工艺、提高工程质量,降低施工成本、科学组织、合理安排、优化施工方案是工程管理的行动指南,在施工组织设计

48、编制中,对关键工序进行多种施工方案比选,在技术可行的前提下,择优选用最佳方案。(6)科学配置原则充分发挥企业技术实力、施工机械设备配套能力及项目管理优势。根据本合同段的工程量大小及各项管理目标的要求,在施工组织中实行科学配置,选派对该类工程有丰富施工经验的管理人员和专业化施工队伍,投入高效先进的施工设备,工程启动阶段,先期投入启动资金,施工运作中,计量支付款项,专款专项,确保整个施工阶段有充分的资金周转和使用。(7)布局合理原则从节省临时占地、减少植被破坏、搞好环保、认真实施文明施工等多角度出发,合理安排生产及生活场地,优化项目经理部平面布置,做好环境保护,工程完工后,及时平整场地、恢复地貌和

49、植被。第二节 工程概况1.2.1工程设计情况(1)工程基本情况序号项 目内 容1工程名称东关南街(京港澳高速公路城内街)道路工程施工总承包2建设单位北京市公联公路联络线有限责任公司3设计单位北京市市政工程设计研究总院有限公司4建设规模东关南街南北走向,南起京港澳高速公路,北至城内街,道路规划为城市次干路,规划红线宽35米,设计速度为40公里/小时,道路全长337.74米。道路横断面采用三幅式,中间机动车道宽16米,两侧隔离带各宽2米,两侧非机动车道各宽3.5米,两侧人行道各宽4米(含树池)。本项目工程内容包括道路、交通、排水、照明、绿化等。5建设地点宛平城东侧,五环路与京港澳高速公路相交宛平桥

50、的东北角6资金来源政府投资7工期要求总工期:27日历天;计划开工日期:2015年6月5日8质量标准合格(2)道路工程设计概况序号项目内 容1道路等 级城市次干路。2设计速 度主路:40km/h。3横断面组成道路横断面采用三幅式,中间机动车道宽16米,两侧隔离带各宽2米,两侧非机动车道各宽3.5米,两侧人行道各宽4米(含树池)。4路面结构层设计机动车道细粒式沥青砼AC-13C(表面层,厚4cm) 乳化沥青粘层(PC-3)粗粒式沥青砼AC-25C(下面层,厚7cm)下封层(1cm)乳化沥青透层(PC-2)石灰粉煤灰稳定碎石(基层,厚16cm)石灰粉煤灰稳定碎石(基层,厚16cm)石灰粉煤灰稳定碎石

51、(底基层,厚16cm)总厚度:60cm机动车道(京港澳高速公路辅路路口)改性沥青SMA-13C(表面层,厚4cm) 乳化沥青粘层(PC-3)粗粒式沥青砼AC-25C(下面层,厚7cm)下封层(1cm)乳化沥青透层(PC-2)京港澳高速公路辅路路口范围内只将现状道路面层铣刨,施做上述面层结构。非机动车道细粒式沥青砼AC-10F(表面层,厚2.5cm) 乳化沥青粘层(PC-3)中粒式沥青砼AC-16C(下面层,厚4cm)下封层(1cm)乳化沥青透层(PC-2)石灰粉煤灰稳定碎石(基层,厚18cm)石灰粉煤灰稳定碎石(底基层,厚18cm)总厚度:43.5cm人行步道透水步道砖(厚6cm)水泥砂浆(厚

52、2cm)无砂砼(厚15cm )粗砂垫层(厚5cm)总厚度28cm(3)雨水工程设计概况序号项目内 容1设计标准雨水管道设计重现期为3年。2主要结构型式雨水方沟:盖板方沟,内径为2.22.0m,1.60.9m。雨水管线:雨水管采用钢筋混凝土管,管径D1000D1800。3雨水工程范围沿设计道路新建一条雨水管沟,上游承接宛平城区域内雨水,同时排除道路及两侧地块内雨水,由北向南接入京港澳高速规划雨水方沟。1.2.2工程地质及水文情况(1)工程地质本工程探查深度范围内的图层分为人工堆积层、新近沉积层和第四纪沉积层三大类,按岩性及工程性质进一步划分3个大层及亚层。表层为人工堆积层,厚度1.44.2m的杂

53、填土层,粉土素土填土1层及卵石素填土2层,人工堆积层下为新近沉积之卵石层,新近沉积层以下为第四纪沉积之卵石层。(2)水文地质拟建场地内的地下水埋深在现状地面以下18m左右,地下水类型为潜水。场区内潜水天然动态类型属渗入-径流型,主要接受大气降水入渗、地下水侧向径流等方式补给,以地下水侧向径流和人工开采等方式排泄,其水位变化规律一般为:11月份来年3月份水位较高,其他月份水位相对较低,水位变化幅度为56m。1.2.3工程沿线施工环境(1)现状道路东关南街现状道路为单幅路形式,沥青砼路面,南段路面宽11米,北段路面宽7.5米,道路两侧现状有行道树,树径约2530厘米,株距约5米。(2)自然条件拟建

54、道路穿越道路、停车场、现状民房、绿地等,地势较平坦,沿线地下分布有店里、通讯、燃气、上水、污水等管线,其具体位置、埋深等情况进场后需进一步查明。(3)沿线控制条件道路沿线无控制性用地及控制性建筑,本项目南侧由在建的地铁16号线,在宛平设有一站。(4)文物及古树本项目终点处道路范围进入了卢沟桥宛平县城墙保护范围,目前已征求文物主管部门的意见。(5)公交设施现状本项目沿线范围内无公交线及站点。(6)抗震评价该场地类别为类,在地震烈度为8度时,该场区地面下20m深度范围内的天然沉积土层不会发生地震液化。第三节 施工组织及总体部署1.3.1施工管理目标经过对招标文件的认真研读,以及对工程地点、规模、性

55、质等方面进行深入分析后,经公司经理办公会研究确立了本工程的各项管理目标,并围绕此目标进行投标阶段的施工组织设计。各项管理目标为: (1)工期目标确保招标文件规定合同工期中的总工期要求,计划开工日期2015年6月5日,计划工期27日历天。(2)工程质量目标本工程的质量目标为:合格。本工程施工质量达到城镇道路工程施工与质量验收规范(CJJ1-2008),北京市城市道路工程施工技术规程(DBJ01-45-2000)的要求。质量控制要求: 单位工程优良率达到90%以上,工程无重大质量事故发生; 混凝土强度合格率100%; 各工序隐蔽工程检查一次验收合格率100%; 道路各结构层宽度,厚度符合设计要求,

56、做到层层密,层层平; 树精品意识,建精品工程;(3)安全生产目标施工中始终贯彻“安全第一、预防为主”的安全生产工作方针,保证职工在生产工程中安全与健康,严防各类事故发生,以安全促生产。强化安全生产管理,通过组织落实、责任到人、定期检查、认真整改,不发生重大伤亡事故,重伤事故频率控制在0.5以内,工伤事故频率不超过10,无违法犯罪案件,无食物中毒和传染病事故。(4)文明施工目标以北京市建设工程现场文明施工管理办法及建设方有关安全文明要求为施工准则。工程弃渣、污水排放、机械噪声和扬尘控制及生活垃圾均按照文明施工和环保管理办法执行,创“北京市文明施工样板工地”。为公司赢得声誉,为建设方增添光彩,为环

57、保作出贡献。(5)环境保护目标认真贯彻执行国家、北京市环境保护的法律法规和环境标准,采用清洁工艺,坚持清洁生产,不断提高全体参建员工的环保意识,综合利用各种资源,最大限度的降低各种原材料的消耗。做到节能、节水、节约原材料。废气、废水、各种废弃物达标排放。从严把握噪声标准,控制施工噪声、扬尘污染。保护城市绿地及周边环境,维护城市交通正常秩序,贯彻“最大限度的保护,最小程度的破坏,最大限度的恢复”的环保理念,创北京市环保型建筑施工工地。(6)内业管理目标技术档案管理计算机化,确保内业资料准确完整、及时、美观、规范,符合建设方、监理方面要求;做到工程竣工与资料交验同步完成。1.3.2施工组织机构设置

58、(1)施工组织机构的设置根据本项目特点,公司选派多年参与北京地区综合市政工程施工并满足招标文件资质要求的专业管理人员组建“东关南街(京港澳高速公路城内街)道路工程施工总承包项目经理部”。由项目经理部统一指挥,全面负责工程的综合管理。详见图1.3-1“施工组织机构图”。项目经理部由工程部、安质部、经营部、机械部、材料部、人财部、综合办公室等职能部门组成。项目部下设经营管理系统、技术质量系统和工程管理系统。通过各部门间的紧密配合,全面完成本工程的合同履约。工作中,做到目标明确,责任到人。(2)项目部主要负责人及各职能部门主要职责序号岗位名称主要职责1项目经理作为公司在项目的执行代表,对工程进度、质

59、量、安全、文明施工向业主全面负责;代表公司履行对业主的合约,并在施工合同框架内行使对项目所有分包商的管理权。2项目副经理土建:主管土建工程施工,对土建施工生产的进度、安全、文明施工全面负责;负责与其它专业之间的施工协调。安全:全面负责现场安全工作。3项目总工程师为项目总技术负责人,全面负责工程技术与工程质量,负责各种技术措施的编制与修订,负责竣工资料的归档和编纂,对项目经理负责。4项目总经济师负责项目的合同、计划、统计、计量工作,协助项目经理进行工程成本控制,对项目经理负责。5项目总会计师负责项目资金的专款专用,负责资金的合理支配和流向,协助项目经理进行工程成本核算与控制,对项目经理负责。6工

60、程部负责项目施工技术管理、施工技术方案编制、图纸会审和技术核定、结构预控验算、结构变形监测、试验检测及施工测量管理工作;参与编制项目质量计划、项目职业健康安全管理计划、环境管理计划;负责技术资料及声像资料的收集整理工作;与质量管理部紧密配合,参与项目阶段交验和竣工交验,共同负责工程创优活动;协助项目总工程师进行新技术、新材料、新工艺在本项目的推广和科技成果的总结工作。负责职责范围内的进度计划的落实,对各专业施工进度计划的实施过程进行监控;组织生产协调例会,协调各专业之间的施工问题,建立合理完善的施工秩序;负责绘制及调整各阶段施工现场总平面布置图;负责施工现场总平面的管理及协调工作。7安全质量部

61、(质量组)贯彻国家及地方有关工程施工规范、工艺标准、质量标准;实施项目过程中工程质量的质检工作,并与政府质量监督对口工作;负责组织编制项目质量计划及质量目标的分解落实,编制质量奖惩责任制度并负责监督实施、过程控制和日常管理;负责项目全员质量保证体系和质量方针的培训教育工作;负责分部分项工程工序质量检查和质量评定工作;检查各工序的成品、半成品,保证上道工序为下道工序提供合格的产品并完成各种质量记录。负责工程创优和评奖的策划、组织、资料准备和日常管理工作;负责组织工程阶段和竣工验收工作,并进行交验技术资料和质量记录的整理、分装。8安全质量部(安全、环保、文明组)负责项目安全生产、文明施工和环境保护

62、工作;负责编制项目安全防护、消防方案和安全施工专项方案,并组织实施;研究项目施工潜伏性危险及预防方法,预计所需安全措施费用;负责编制项目职业健康安全管理计划、环境管理计划并监督实施;负责安全生产和文明施工的日常检查、监督、消除隐患等管理工作;负责组织实施员工安全培训、安全教育工作,负责安全技术审核把关和安全交底;负责每周的安全生产例会,定期主持召开安全工作会议;负责安全目标的分解落实和考核评比,开展安全生产竞赛和宣传活动;制定安全消防应急计划,负责项目安全消防救援工作,在危急情况下有权发出停工令,直至危险状况得到改善为止;负责安全生产日志和文明施工资料的收集整理工作;配合项目副经理协调周边关系,处理施工民扰和扰民问题及特殊交通运输问题等,做好项目对外宣传工作。9经营部负责项目预算成本的编制及成本控制工作,具体负责与业主和分包的结算工作,编制项目月度请款、分包付款文件;负责项目合同管理、造价确定以及二次经营等事务的日常工作;负责准备竣工决算报告其他与商务方面的工作。10人财部具体负责项目财务和税务事务,以及负责工程款的收支工作;积极配合业主财务安排,确保项目资金运作

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!