1、 PMP试题(435道)1. Communications is best described as:A. an exchange of information.B. providing written or oral directions.C. consists of senders and receiversD. effective listening.E. All of the aboveANS: E2. Fixed Price contracts place more risk on the:A. ownerB. buyerC. sellerD. contractorE. C or D

2、ANS: E3. Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the costof _, _, and _.A. R & D, maintainability, operation and support.B. R & D, production, operation and support.C. Acquisition, operations, ma

3、intenance.D. Production, operations, maintenance.E. None of the aboveANS: B4. Management By Objectives assumes that the team:A. is receptive to an unstructured environment.B. does not require close supervision.C. possesses a self directed philosophyD. identifies with project objectives.E. All of the

4、 above.ANS: E5. Quality may be defined as:A. conformance to requirements.B. fitness for use.C. continuous improvement of products and servicesD. appeal to the customerE. All of the above except BANS: E6. Since risk is associated with most projects, the best course of action is to:A. cover all projec

5、t risks by buying appropriate insuranceB. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.C. avoid projects with clear and present risksD. eliminate all known risks prior to the execution phase of the projectE. identify various risks

6、and implement actions to mitigate their potential impactANS: E7. The process of choosing/documenting the best approach to achieve the project objectives is part of:A. The scope baseline.B. Scope authorizationC. Scope definitionD. Scope planning.E. All of the above.ANS: D8. Time management is the all

7、ocation of time in a projects life cycle through the process of:A. PlanningB. Estimating.C. Scheduling.D. ControllingE. All of the above.ANS: E9. A comprehensive definition of scope management would be:A. Managing a project in terms of its objective through the concept, development, implementation,

8、and termination phases of a project.B. Approval of the scope baseline.C. Approval of the detailed project charter.D. Configuration control.E. Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.ANS: A10. Cost Plus Percentage of C

9、ost contracts are more desirable for the:A. ownerB. buyerC. sellerD. contractorE. C or DANS: E11. Management styles associated with production environments, such as assembly lines commonly include:A. a directing style of leadership.B. a lack of confidence in their workersC. assumption that workers l

10、ack ambition and dislike responsibilityD. a Theory X style of leadershipE. All of the above.ANS: E12. Quality management:A. is another name for careful inspections.B. is inversely related to productivity.C. is primarily the responsiblity of management.D. is primarily the responsibility of the worker

11、s.E. is essentially a motivational technique.ANS: C13. Risk management allows the project manager and the project team to:A. eliminate most risks during the planning phase of the projectB. identify project risksC. identify impacts of various risksD. plan suitable responsesE. B, C and D onlyANS: E14.

12、 Scheduling is the process by which decisions are made concerning:A. Tasks to be accomplished.B. Personnel/organization that will be assigned to accomplish the task.C. Time when the tasks are to be completed.D. All of the above.E. A and C only.ANS: E15. The basic elements of communication include:A.

13、 Listening, talking and sign language.B. Communicator, encoding, message, medium, decoding, receiver, and feedbackC. Clarity of speech and good listening habitsD. Reading, writing and listeningE. All of the aboveANS: B16. Which of the following would most likely increase the accuracy of estimating t

14、he project cost?A. Pricing out the work at lower levels in the work breakdown structure.B. Using historical data.C. Talking to people who have worked on similar projects.D. All of the above.E. A and C only.ANS: D17. A variance envelope has been established on a project. The envelope goes from +-30%

15、in R&D to +-5% during manufacturing. The reason forthe change in thickness of the envelope is because:A. The management reserve has been used up.B. The accuracy of the estimates in manufacturing are worse than the estimates in R & D.C. Tighter controls are always needed as a project begins to wind d

16、own.D. Of the personal desires of the project sponsor.E. Of none of the aboveANS: E18. Cost of quality is:A. associated with non-conformance to specifications and requirements.B. primarily caused by poor workmanship of workers who are building or manufacturing the product.C. used to determine whethe

17、r a quality management program is suitable for a given project.D. negligible for most large projects.E. A and BANS: A19. Management plans include all of the following except:A. Organization of project.B. Job decriptions.C. Policies and procedures.D. Linear responsibility charts.E. Scope baseline.ANS

18、: E20. The Japanese resource management model exhibits:A. a cooperative spirit of goal setting.B. non-specialized career pathsC. frequent changes in team assignmentsD. a Theory Z style of managementE. All of the above.ANS: E21. The highest degrees of project risk and uncertainty are associated with

19、the following phase of the project:A. conceptualB. executionC. cut-overD. post project evaluationE. A and D onlyANS: A22. The most common types of schedules are Gantt charts, milestone charts, line of balance, and:A. Networks.B. Time phased events.C. Calendar integrated activities.D. A and C only.E.

20、 B and C only.ANS: A23. Which of the following is often overlooked in achieving effective communication?A. speaking clearlyB. listeningC. interpretingD. maintaining eye contactE. manipulating the conversationANS: B24. Which type of contract requires that the buyer keep the tightest labor/material co

21、st control?A. Cost Plus Incentive FeeB. Cost Plus Percentage of CostsC. Cost Plus Fixed FeeD. Firm Fixed PriceE. Firm Fixed Price Plus IncentiveANS: B25. A task-oriented family tree of activities is a:A. Detailed plan.B. Linear responsibility chart.C. Work breakdown structure.D. Cost account coding

22、system.E. Work package decription.ANS: C26. Adding 5 people to a 4 person team increases the communication channels by a factor of:A. 2 timesB. 3 timesC. 4 timesD. 5 timesE. 6 timesANS: E27. Cost management includes:A. Cost estimating/forecasting.B. Cost budgeting/cost control.C. Cost applications.D

23、. All of the above.E. A and B only.ANS: D28. Participative Management:A. involves the solicitation of information from all team members.B. assumes that members avoid work and responsibility.C. suggests the sharing of power and decision making.D. employs a Theory X style of leadership.E. A and CANS:

24、E29. The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above.ANS: C30. The lowest dollar amount at stake is associated with the following phase of the project:A. c

25、onceptualB. executionC. cut-overD. post project evaluationE. A and D onlyANS: A31. The major disadvantage of a bar chart is:A. Lack of time-phasing.B. Cannot be related to calendar dates.C. does not show activity interrelationships.D. Cannot be related to manpower planning.E. Cannot be related to co

26、st estimates.ANS: C32. Which contract type consists of - target costs & profit, ceiling prices and shared ratio of risk?A. Cost Plus Incentive FeeB. Cost Plus Percentage of CostsC. Cost Plus Fixed FeeD. Firm Fixed PriceE. Firm Fixed Price Plus IncentiveANS: E33. Methods and techniques used to examin

27、e cost and technical data are called feasibility studies. The economic aspects of a feasibility studyinclude interest rates, present worth factors, operating costs, depreciation and _.A. Capitalization costs.B. Technical skill requirements.C. Technology forecasting.D. Strategic marketing intelligenc

28、e.E. All of the above.ANS: A34. Standard of purchased material:A. Simplifies inventory controlB. reduces the risk of obsolescenceC. reduces cost of purchasing and storageD. All of the above.E. A and C only.ANS: E35. The control points in the work breakdown structure used for isolated assignments to

29、work centers are referred to as:A. Work packages.B. Subtasks.C. Tasks.D. Code of accounts.E. Integration points.ANS: C36. The utility of network-based schedules:A. Reveals interdependencies.B. Facilitates what if exercises.C. Highlights critical activities.D. Provides information on resource require

30、ments, time requirements and tradeoffs.E. All of the above.ANS: E37. The way a project manager sends and receives information depends upon:A. How others relate to the project managerB. The project managers level in the organizational hierarchyC. the size and nature of the projectD. the project manag

31、ers salary and ageE. the number of projects going on at one time in the companyANS: A38. Uncertainty refers to a situation where:A. the outcomes are known but their probabilities are highB. the outcomes and their probabilities are knownC. neither the outcomes nor their probabilities are knownD. stat

32、es of nature can change at any timeE. probabilities of various states of nature can change at any timeANS: C39. Which of the following is closet to Demings definition of Quality:A. conformance to requirements.B. fitness for use.C. continuous improvement of products and services.D. customer focus.E.

33、All of the above.ANS: C40. It is useful to conduct project risk assessment according to the projectsA. charterB. statement of workC. Work Breakdown structureD. networkE. budgetANS: C41. Management decision-making includes:A. Analysis of alternatives.B. Revisions/replanning.C. Resource allocation.D.

34、Modification or updating of goals and objectives.E. All of the above.ANS: E42. The basic terminology for networks includes:A. Activities, events, manpower, skill levels and slack.B. Activities, documentation, events, manpower and skill levels.C. Slack, activities, events, and time estimates.D. Time

35、estimates, slack, sponsorship involvement, and activities.E. Time estimates, slack time, report writing, life cycle phases, and crashing times.ANS: C43. The project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people.The project

36、 managers communication dilemma is one of:A. encodingB. decodingC. choice of a mediumD. one-way communicationE. All of the above.ANS: E44. The technique most commonly used to determine the profitability of a project includes _ methods.A. Net present value (NPV).B. Return on investment (ROI).C. Disco

37、unted cash flow (DCF)D. Payout time and risk sensitivity analysis.E. All of the above.ANS: E45. Which of the following are part of the purchasing cycle:A. define needB. prepare and issue purchase orderC. inspect incoming goodsD. All of the above.E. A and B onlyANS: E46. Which of the following is clo

38、sest to Jurans definition of Quality:A. conformance to requirements.B. fitness for use.C. continuous improvement.D. customer focus.E. All of the above.ANS: B47. A project element which lies between two events is called:A. An activity.B. A critical path method.C. A slack milestone.D. A timing slot.E.

39、 A calendar completion point.ANS: A48. Employee unions would most likely satisfy which level in Maslows hierarchy of needs?A. BelongingB. Self-actualizationC. EsteemD. SafetyE. EmpowermentANS: A49. Management calls a meeting to explain to all employees the new benefits package for the rank and file.

40、 This is an example of:A. Upward communicationB. Downward communicationC. One-way communicationD. Two-way communicationE. None of the above.ANS: C50. Project management/project planning is most closely aligned with:A. Long range/strategic planning (5 years or more).B. Intermediate range planning (1

41、to 5 years)C. Short range/tactical planning (1 year or less).D. All of the above.E. B and C.ANS: E51. The profitability and technical data studies are provided in report format to owners and funders for acceptance. This type of report, used tosolicit funding, is referred to as a(n) _.A. Project feas

42、ibility study.B. Economic evaluation analysis.C. Risk management manual.D. Prospectus.E. None of the aboveANS: D52. Which of the following constitute Jurans quality trilogy:A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, custom

43、er.E. design, build, deliver.ANS: B53. Which of the following is most closely associated with business risk:A. profit and lossB. personnel turnoverC. workmens compensationD. liability insuranceE. All of the above.ANS: A54. Which of the following types of contracts is equivalent to a cost plus contra

44、ct:A. Fixed firm priceB. Cost reimbursableC. Fixed price plus incentive feeD. progress paymentsE. All of the above.ANS: B55. A project manager recently rewarded an individual with a promotion that carried with it a very small salary increase but substantially moreresponsibility. The project manager

45、appears to be appealing to the employees _ need.A. MonetaryB. PhysiologicalC. EsteemD. Self-actualizationE. Team-buildingANS: C56. Most project (and non-project) managers prefer _ communications.A. OralB. WrittenC. UpwardD. DownwardE. LateralANS: A57. On a precedence diagram, the arrow between two b

46、oxes is called:A. An activity.B. A constraint.C. An event.D. The critical path.E. None of above.ANS: B58. Quality control charts show a characteristic of the product or service against:A. the specification limits.B. customer requirements.C. control limits based on three standard deviations in each d

47、irection.D. control limits based on six standard deviations in each direction.E. A and D onlyANS: C59. The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives areindentified in the _ phase of the project but first docum

48、ented in the project _.A. Conceptual, charter/baseline.B. Conceptual, master schedule.C. Development, charter/baseline.D. Development, master schedule.E. Development, masterplan.ANS: A60. The work breakdown structure, the work packages, and the companys accounting system are tied together through th

49、e:A. Code of accounts.B. Overhead rates.C. Budgeting system.D. Capital budgeting process.E. All of the above.ANS: A61. Which of the following is an element of procurement management:A. inspectionB. purchasingC. estimatingD. expeditingE. A, B and D onlyANS: E62. Which of the following is most closely

50、 associated with pure risk:A. profit and lossB. personnel turnoverC. insuranceD. market fluctuationsE. A and D onlyANS: C63. Assignable cause or special variation is:A. is indicated when a point falls outside the control limits.B. is indicated when a point falls outside the specification limits.C. i

51、s indicated when a run of seven or more points fall above the center line of a standard control chart.D. is indicated when a run of seven or more points fall below the center line of a standard control chart.E. A, C, and D.ANS: E64. In the arrow diagramming method (ADM), _ do not consume time or res

52、ources.A. Events.B. ActivitiesC. Slack elements.D. B and C only.E. All of the above.ANS: A65. Management reserve is generally intended to be used to:A. implement additional unbudgeted scopeB. compensate for inaccurate estimatesC. cover major unforeseen catastrophesD. cover unforeseen problems in the

53、 projectE. All of the above.ANS: D66. Project management has been proven to be successful because employees get to see the entire effort, from beginning to end, rather than justsmall pieces. This could be considered an example of:A. Behavioral modificationB. Linking performance to payC. Positive job

54、 reinforcementD. Job enrichmentE. All of the aboveANS: D67. Project managers that are available to answer questions, provide guidance when need, and generally do not interfere with day-to-day activitieshave a(n) _ managerial style.A. AutocraticB. ConciliatoryC. EthicalD. FacilitativeE. JudicialANS:

55、D68. The scope baseline once established and approved, is used:A. as the basis for making future decisions.B. to accomplish verification measures.C. to evaluate potential changes.D. All of the above.E. A and C only.ANS: D69. The three most common types of project cost estimates are:A. Order of magni

56、tude, parametric, and budget.B. Parametric, definitive and top down.C. Order of magnitude, definitive and bottom up.D. Order of magnitude, budget and definitive.E. Analogy, parametric and top down.ANS: D70. To calculate the expected value of an outcome:A. divide the value of each outcome by its prob

57、ability, then add the results.B. divide the value of the desired outcome by the value all possible outcomesC. multiply the value of each outcome by its probability, then add the resultsD. use linear regression to assess the expected value of the outcomeE. B and D onlyANS: C71. Activities with zero t

58、ime duration are referred to as:A. Critical path activites.B. Noncritical path activities.C. Slack time activities.D. DummiesE. None of above.ANS: D72. For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8, and the standarddeviation

59、associated with measurement variation is 0.6. The total standard deviation for this characteristic is:A. 1.4B. 1.2.C. 1.0D. 0.8E. 0.2ANS: C73. Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other thanpossibly financin

60、g (interest) costs and taxes, the three most common escalation factors involve changes in:A. Overhead rates, labor rates and material costs.B. Overhead rates, schedule slippages, and rework.C. Rework, cost-of-living adjustments, and overtime.D. Material costs, shipping cost, and scope changes.E. Lab

61、or rates, material costs, and cost reporting.ANS: A74. Selective perception is _ of new conflicting information that may result, in a breakdown in communication.A. EncodingB. Blocking outC. TransmissionD. AcceptanceE. DecodingANS: B75. The work breakdown structure (WBS) is an excellent tool for obje

62、ctive control and evaluation. Which of the following is generally NOTvalidated through the WBS?A. Time, schedule and cost.B. Management coordination and organization structuring.C. Work methods and accountability.D. Quality of work.E. Risk and impact decision-making.ANS: D76. When working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related toperformance is to provide the team members with an individual salary plus bonus based up

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!