汽车GPS防盗系统和GSM防盗系统概述英文版

上传人:反馈****12 文档编号:251493382 上传时间:2024-11-08 格式:PPTX 页数:32 大小:148.42KB
收藏 版权申诉 举报 下载
汽车GPS防盗系统和GSM防盗系统概述英文版_第1页
第1页 / 共32页
汽车GPS防盗系统和GSM防盗系统概述英文版_第2页
第2页 / 共32页
汽车GPS防盗系统和GSM防盗系统概述英文版_第3页
第3页 / 共32页
资源描述:

《汽车GPS防盗系统和GSM防盗系统概述英文版》由会员分享,可在线阅读,更多相关《汽车GPS防盗系统和GSM防盗系统概述英文版(32页珍藏版)》请在装配图网上搜索。

1、*,,Click to edit Master title style,Click to edit Master text styles,SeClick to edit Master text styles,Second level,Third level,Fourth level,Fifth level,cond level,The Lean Enterprise,Introduction to TPM Total Productive Maintenance,Lean Foundations,Continuous Improvement Training,,Learning Objecti

2、ves,Learn the basic philosophy of TPM,ExplainOEE and how it contributesto a TPM project,explore OEE components;defineand calculateOEE,List 6major components of equipment loss,Reviewand adopt the7 stepsto AutonomousMaintenance,,TPM The Need,ProcessIndustry relies heavily onequipment thatis integrated

3、and runs continuously,When down,los,With lower inventories,machines need to be reliable,Machining and Assembly industries becoming more mechanized to save manpower and do difficult jobs,More machines to maintain,Need to save energy,,TPM The Philosophy,TPM aims at using equipmentto itsmaximumand aids

4、 in reducingLife Cycle Costs(LCC),In other words-going all out to eliminate the Losses(Waste)causedby theequipment,TPM improves work activitiesthat deal with Equipment Set-up,Operating parameters,Maintenance,Tear down,Repairs andBreakdowns,It specifically aimsat thecomplete eliminationof the,six maj

5、or losses while striving for a goal of zero unscheduled downtime,,TPM -The SixMajorLosses(Waste),Downtime Losses,(1)Equipmentfailures,(2)Set-up andadjustments,Speed Losses,(3)Idling andminorstoppages,(4)Reduced speed(actual operating,vs.designed),DefectLosses,(5)Defects inprocess,(6)Reduced yield be

6、tween start of,production andstableproduction,,OEE Formulas,1.Unexpected Eq.Breakdown,2.Set-up&adjustments,3.Idling andminor stoppages,4.Reduced speed,5.Defects inProcess,6.Reduced Yield,Overall Equip.,Effectiveness:,Availability,example:,Efficiency,example:,RatioofQuality,Products,example:,Load Dow

7、nTime,Load Time,460min 60min,460,TheTheoreticalCy,cle,Time xProcessed Qty,OperatingTime,0.5/unitx400units,400minutes,ProcessedAm,oun,t,AmountofDefects,ProcessedAmount,400,8,400,x 100%,=,87%,x 100%,=,50%,x 100%,=,98%,=,=,=,.,87x.50 x.98=46.2%,LossMeasureFormulaMetric,,OEEPareto Analysis by LossCatego

8、ry,Overall,Equipment,Effectiveness,Loss,3&4,46.2%OEE,Loss,1&2,Loss,5&6,,TPMattacks6 major“Losses,”,”plusElimination of other Wastes,(Mura,Muri,Muda),OperatorTime Losses,Manpowerlossesdue to operationtime being donemoreslowlythanstandardtime(CycleTime StandardTime),MaterialLosses,Lossesinyielddue to

9、inherentwaste(cut-offstock,set-uppieces,prototype,etc),Energylosses suchaselectricity,gas,and water whenmachinery is notdoingvalue-addedwork,Idlinglosses duetoinadequate sensorsand productbuilduponconveyorsand chutes,,Best PracticesWorld-ClassGoals(ATPM,“,“Vision”),BeforeAfter,Availability87%90%,Per

10、formanceEfficiency50%95%,RatioofQuality(Yield)98%99%,Overall Eq.Effectiveness42.6%85%,,TPM,OperationalGoals(Qualitative),Increasenumberofsuggestions,Improve level of teamwork of shopfloor,Improve cross-functionalteamwork,Establishmaintenancethroughoutthetotalequipment lifecycle,Peoplemaintaintheirow

11、n equipment,Machinesavailablefor just-in-time(JIT)application,Improve machineavailability,Improve workingenvironment(6S),Improve Corporateculture andimage,Improve Business performance,,TPM,OperationalGoals(Quantitative),Cost Reductions,Actualand to be reduced,Energysavings,Maintenance,EquipmentEffic

12、iencies,Zero failures(ultimategoal),MTBF(mean timebetweenfailures),MTTR(mean timebetweenrepairs),Idle Time,,TPM,OperationalGoals,cont.(Quantitative),Safety,Zero accidents,Quality,Zero failures,Zero complaints,Education,Hoursoftraining/number of sessions,NumberofKAIZEN projects,NumberofSuggestions,,T

13、PM,Definition of Total,TotalEffectiveness,Reductionin lossesof all equipment tooptimize its effectiveness andimprove costs,TotalMaintenance,Involves the whole maintenancesystem inclusive ofequipmentmanufacturer,equipmentengineering,and equipment user toimprove maintainability,TotalParticipation,Ever

14、yone has aroleto make TPM work,Managementto set policy,Middle management,staffto supportandlead,Maintenance tomaintain and train,Operatorsto take onnewmaintenance challenges,,TPM Roleof MaintenanceFunction,Provides technical support forautonomous maintenance done by operators,Restores deteriorated e

15、quipment throughchecks,inspections,andoverhauls,IdentifiesDesign weaknesses and improves theequipmentto error-freefunction(via poka-yoke),Improves technical maintenanceskills for checks,inspections,and overhauls,,TPM Roleof Operator Function,Maintainsbasiccondition(cleaningandlubrication),Maintainsp

16、roper condition andstandardsforequipmentusage,Partiallyrestores deterioration,Basicskill levels in:,Changeoverandset-up,Reductionof minor stoppages and adjustments,,TPM Autonomous Maintenance,Definition:,Operationsmaintainsitsown equipment,Utilize 7-stepplan*,(*Source:JapanInstituteof PlantMaintenance),,7 Steps toAutonomous Maintenance,Step1 Initial clean-up(External),“Kick-off”program,Closely alignedwith6S(5S+1),ManagementandStaffshowcommitment,Clean,Sand andPaint,Identify sources ofdefects:,Ga

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

相关资源

更多
正为您匹配相似的精品文档
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  sobing.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!