1、普通螺纹基本牙型及其基本尺寸 普通螺纹基本牙型及其基本尺寸(GB/T 192,1981、GB/T 193,1981、GB/T 196,1981)(mm)D内螺纹大径;d外螺纹大径;D内螺纹中径;d外螺纹中径;D内螺纹小径;d外螺纹小径;P螺距;H原始三角形高度 2212 公称直径 D、d 螺距 P 中径 D 或 d 小径 D 或 d 2211 第一系列 第二系列 第三系列 *0.25 0.838 0.729 1 0.2 0.870 0.738 *0.25 0.938 0.829 1.1 0.2 0.970 0.883 *0.25 1.038 0.929 1.2 0.2 1.070 0.983
2、*0.3 1.205 1.075 1.4 0.2 1.270 1.183 the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the
3、drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find pla
4、nted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site
5、to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,accor
6、ding to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),
7、the two anchor points determine the horizontal position.Level according to use *1.373 1.221 0.351.6 0.2 1.470 1.383*0.35 1.573 1.421 1.8 0.2 1.670 1.583*0.4 1.740 1.567 2 0.25 1.838 1.729*0.45 1.908 1.713 2.2 0.25 2.038 1.929*0.45 2.208 2.013 2.5 0.35 2.273 2.121*0.5 2.675 2.459 2.621 3 0.35 2.773 t
8、he drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a constructi
9、on programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the
10、 curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis pos
11、itioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the c
12、ontent determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the ho
13、rizontal position.Level according to use 首先绘制螺纹线,首尾的螺旋半径具有一定的对称性,收尾的部分稍大一些为了快速退刀。定义方法如下图:新建轮廓所在的基准面,过螺旋线端点并垂直螺旋线,如下图:the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding o
14、f design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site
15、 to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:po
16、sitioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)f
17、ind anchor points:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning
18、is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehe
19、nsive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction sch
20、eme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is
21、 local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust
22、 errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the locatio
23、n points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use 新建草图绘制轮廓线图元,可根据具体的车刀规格来定义外形尺寸:如下图:the drawings,first to become familiar with the drawings,mainly ab
24、out the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and spe
25、cial treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all cur
26、tain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the o
27、rigin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points s
28、hall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use 定义扫描切除,某些选项选择默认即可,如下图:t
29、he drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a constructi
30、on programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the
31、 curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis pos
32、itioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the c
33、ontent determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the ho
34、rizontal position.Level according to use the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned
35、the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find
36、 planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction s
37、ite to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,a
38、ccording to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pi
39、pe),the two anchor points determine the horizontal position.Level according to use 螺纹起始处效果:渐进切削 螺纹整体效果 the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-drive
40、n dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design.(2)at the construction site to find subje
41、ct planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the
42、drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor poi
43、nts:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)
44、take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use the drawings,first to become familiar with the drawings,mainly about the following aspects:1)pages of drawings and diagrams,maps;2)a comprehensive understa
45、nding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)controlled construction drawings to verify construction scheme and design
46、.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entire project is a region-wide,only partial walls,the zone is local.(3)iden
47、tify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain walls;2)acceptance of the installation is accurate;3)adjust errors,and de
48、termine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must
49、ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use 螺纹收尾之效果:快速退刀 文件 sw2010 sp3.1 the drawings,first to become familiar with the drawings,mainly about the following a
50、spects:1)pages of drawings and diagrams,maps;2)a comprehensive understanding of drawing;3)finding of design-driven dimensions(),do not resize and adjust the size;4)questioned the drawings;5)develop buries a construction programme and technical clarification;6)clear corners and special treatment;7)co
51、ntrolled construction drawings to verify construction scheme and design.(2)at the construction site to find subject planted area:various engineering,first on the scene to find planted area,it must first understand the curtain wall installation section,and some projects are all curtain wall,the entir
52、e project is a region-wide,only partial walls,the zone is local.(3)identify the axis positioning:positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning,axis positioning function are:1)to help determine the origin of curtain wa
53、lls;2)acceptance of the installation is accurate;3)adjust errors,and determine the error range.(4)find anchor points:according to site to find the exact location of the axis,according to the drawings provided by the content determine the positioning point;number of anchor points shall not be less than two points.Repeated measurements determine the location points must ensure that the positioning is correct.(5)take level(level):level(minor works available in horizontal pipe),the two anchor points determine the horizontal position.Level according to use
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。