轮机英语期末考试第一卷

上传人:痛*** 文档编号:168043223 上传时间:2022-11-07 格式:DOC 页数:8 大小:109.50KB
收藏 版权申诉 举报 下载
轮机英语期末考试第一卷_第1页
第1页 / 共8页
轮机英语期末考试第一卷_第2页
第2页 / 共8页
轮机英语期末考试第一卷_第3页
第3页 / 共8页
资源描述:

《轮机英语期末考试第一卷》由会员分享,可在线阅读,更多相关《轮机英语期末考试第一卷(8页珍藏版)》请在装配图网上搜索。

1、1002级轮机英语期末考试(A)考试班级:1002轮机2.3.4.5班班级: 姓名: 分数: 第一部分:单选题1.1886 The starting current of an a.c. motor is_ the rated current. A. the same as B. much larger than C. less than D. equals2.1895 With a_ load the voltage and current are in phase. A. pure resistance B. capacitive C. inductive D. None of the a

2、bove3.1905 The emergency generator or emergency battery is connected to_ on most large ships. A. distribution boards B. section boards C. emergency switch boards D. main switch boards4.1906 Switchboards may be of the dead-front type in which all live parts are installed behind_ and only the operatio

3、n handles and instruments are on the front. A. the capstan B. the collector C. the panels D. the surface5.1907 Remote control means that_. A. the system is manned manually B. the system is situated remotely from the operator C. the system is controlled automatically D. all the above6.1911 The differ

4、ence between measured and desired values is called_. A. make-up B. desired value C. deviation D. set value7.1916 Prior to any overhaul work on electric equipment, it is important to ensure the circuits are_. A. live B. dead C. excited D. on line8. 228.Before starting an engine by air ,the engine mus

5、t _A. be turned by a turning gear for at least one minute B. be turned by a turning gear for at least two minutes C. be turned at least one complete turn D. be turned at least two complete turns9.1924 Shore power must be_ during dock repair. A. disconnected B. switched off C. cut off D. connected10.

6、1927 The switchboards for a.c. systems differ from the d.c. switch gear in that the open type panels are generally_ and the dead-front switch gear is the common rule. A. permissibly B. permissible C. no permissible D. not permissible11.1932 Current changing in direction and rising and falling in val

7、ue is_. A. A.C. B. D.C. C. generator D. fresh water generator12.1935 The separate supplies are connected in either star or delta formation. The star formation is most commonly used and requires_ slip-rings on the alternator. A. two B. three C. four D. five13.1941 The difference between measured and

8、desired values is called A. offset B. error C. deviation D. set value14.1946 After the trouble of the automatic control system has been completely eliminated, assistance is_ required. A. remained B. still C. no longer D. much mere15.1952 The field coils_ and the armature is_. This is in fact the arr

9、angement adopted for large, heavy duty alternators. A. stationary/rotate B. stationary/stationary C. rotate/stationary D. rotate/rotate16.1954 An a.c. switchboard is usually_ the corresponding d.c. board because of the higher voltage and lower currents and smaller bus-bars. A. larger and heavier tha

10、n B. as much as C. smaller and lighter than D. more dangerous than17.1963 In_ the control action is independent on(of) the output. A. a closed loop control system B. an open loop control systemC. a boiler control system D. a steering gear control system18.1965 It_ for an emergency generator to requi

11、re paralleling. A. is usual B. is not usual C. is necessary D. is not impossible19.1982 Which of the motors for the devices listed below is fitted with an instantaneous overload relay? A. Fan B. Pump C. Winch D. Machine tool20.1986 An electrical device which prevents an action from occurring until a

12、ll other required conditions are met is called a/an_. A. limit B. monitor C. modulator D. interlock21.1987 A circuit breaker and a fuse have a basic similarity in that they both_. A. can be reset to energize the circuit B. should open the circuit when overloaded C. will burn out when an over current

13、 flow develops D. All of the above22.1997 A constant output voltage from an AC generator is maintained by the_. A. prime mover governorB. exciter generator C. voltage regulator D. reverse power relay23.2005 What will be the phase angle relationship of a six-pole, three-phase, rotating field generato

14、r _. A. 60 B. 120 C. 180 D. 36024.2017 Copper is often used as an electrical conductor because it_. A. has high resistance at low temperatures B. has a highly polished surface C. is able to pass current with little opposition D. holds insulation together well25. In a series circuit, which value will

15、 remain unchanged at all places in the circuit? A. Voltage B. Current C. Resistance D. Inductance26.2027 The total resistance of a parallel circuit is always_. A. larger than the greatest branch resistance B. smaller than the lowest branch resistance C. equal to the sum of the individual branch resi

16、stances D. one-half the sum of the individual branch resistances272159 _ means the Government of the State whose flag the ship is entitled to fly.A. Assembly B. Organization C. Company D. Administration28.2035 The part of the shipboard electrical system used to control the distribution of power to t

17、he branch circuits, is the_. A. bridge control panel B. disconnect links C. governor relay boxD. main switchboard29. 2472 The port state control inspection is carried out on the basis of the following international conventions. Among them, which one was not set by IMO?A. LL66 B. ITC69 C. ILO No. 147

18、 D. SOLAS 74r30.2038 Possible phase relationships between voltage and current in an alternating current circuit include which of the following conditions? A. Current and voltage may be in phase. B. Current may lead the voltage. C. Current may lag the voltage. D. All of the above.31.2084 An ammeter s

19、hould be used to measure_. A. the voltage between two points in a circuit B. circuit continuity C. current flow in a circuit D. total or partial circuit resistance32. 2203 The International Oil Pollution Prevention Certificate required by MARPOL is issued to China flag by the_.A. IMO B. CCS C. USCG

20、D. PICC33. 2102 When voltage and current developed in an AC circuit reach their peak values at the same time, the power factor is_. A. lagging B. leading C. maximum D. minimum34. 2096 Voltage will always lead current in a/an_. A. capacitive circuit B. inductive circuit C. magnetic circuit D. resisti

21、ve circuit35. 2111 When paralleled, AC generators must have the same_. A. frequency B. number of phases C. phase rotation D. All of the above36. 2116 Prior to closing the breaker when paralleling two AC generators, the recommended practice is to have the frequency of the incoming machine_. A. slight

22、ly less than the line frequency B. the same as the line frequency C. slightly greater than the line frequency D. All of the above37. 2291 A person on a fixed or floating platform engaged in oil exploration MAY discharge food waste into the sea when the distance from the nearest land is at leastA. 3

23、nautical milesB. 5 nautical milesC. 12 nautical milesD. 25 nautical miles38. 2121 The unit of electrical power is the_. A. ampere B. kilovolt C. watt D. farad39. 2146 _is a precaution which contributes to avoiding trouble under normal operating conditions.A. Constant inspection B. Keeping constant l

24、oad C. Remaining constant temperature D. Varying speed40. 2465 _ should not undertake any task which will interfere with the supervision duties relating to the main machinery and associated equipment.A. The watch keeping personnel B. The chief engineerC. The person on a bunker barge D. The duty deck

25、 officer41. 2151 Bridge orders must be_ and a record of any required changes in speed and direction should be kept.A. slowly carried away B. carried out with a period of delayC. promptly carried out D. paid by the captain42. 2421 The officer in charge of the engineering watch shall ensure that all m

26、achinery involved with the maneuvering of the ship can immediately be placed in the_ of operation when notified that the ship is in congested waters.A. manual mode B. automatic modeC. remote mode D. follow-up mode43. 2161 While loading bunkers, you notice oil on the water near the vessel. What shoul

27、d you do first. A. Stop loading B. Notify the harbour administration C. Determine if the vessel is the source of the pollution D. Start the main engine and put them in gear to disperse the spill44. 2163 The basic training in fire prevention and fire fighting should include the practical elements whi

28、ch should allow the trainees to acquire the ability to_. A. use self-contained breathing apparatus B. use various types of portable fire extinguishers C. effect a rescue in a smoke-filled space wearing breathing apparatus D. All of the above45.2412 The order “_” means “Maximum maneuvering engine rev

29、olution for ahead propulsion.”A. Full Ahead B. Half Ahead C. Full Astern D. Half Astern46. 263. Why ship repair is an inherently difficult business to manage in the conventional sense? A. Because it is difficult to plan and manage B. Because it is cannot be will categorizedC. Because it is a difficu

30、lt work for people to undergo D. Because it is seldom researched by researcher47.2166 The fire-fighting practical training should take place in spaces which provide truly realistic training conditions, and whenever possible and practical should be carried out in_. A. darkness B. daylight C. simulate

31、d engine-room D. all of the above.48. 2186 The distance between the bottom of the hull and the waterline is called_. A. tonnage B. reserve buoyancy C. draft D. freeboard49. 2191 The approval period for a shipboard oil pollution emergency plan expires after _. A. one year B. two years C. four years D

32、. five years50. 2193 A shipboard oil pollution emergency plan is required of_. A. all vessels, regardless of size and commercial application B. any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboard C. an oil tanker of 150 gross tons o

33、r above, or other ship of 400 gross tons or above D. an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above51. 2196 To prevent the spread of fire by conduction, you should_. A. cool the bulkheads around the fire B. remove combustibles from direct exposure C. close all

34、openings to the area D. shut off all electric power52. 2199 Burning diesel oil should be treated as which class of fire? A. Class A B. Class B C. Class C D. Class D53. 2200 If your vessel has a starboard list after taking on fuel, you would transfer fuel_. A. to starboard B. to port C. forward D. af

35、t54. 2201 Convection spreads a fire as a result of_. A. transmitting the heat of a fire through the ships metal B. burning liquids flowing into another space C. heated gases flowing through ventilation systems D. the transfer of heat across an unobstructed space55. 2204 The International Oil Polluti

36、on Prevention Certificate is valid for a period of_. A. one year from the date of issue B. two years from the date of issue C. three years from the date of issue D. four years from the date of issue56. 2205 A class B fire would most likely occur in the_. A. main switchboard B. engine room bilge C. b

37、reathing compartment D. electric fresh water transfer pump57. 2208 If an oil spill occurs on deck, you should_. A. cover the area with foam B. cover the area with absorbent material C. wash down immediately with a fire hose D. wash down immediately with an oil dispersing solvent58. 2215 A class C fi

38、re would occur in_. A. bedding B. pipe insulation C. paint D. a generator59. 2458 At an unsheltered anchorage the chief engineer officer shall consult with_ whether or not to maintain an underway watch.A. the engineer officer in charge of watch B. the deck officer in charge of watchC. the master D.

39、the chief mate60. 2230 The class of fire on which a blanketing effect is essential to extinguish the fire is_. A. class A B. class B C. class C D. class D61. 2233 Which of the listed classes of fire would most likely occur in the engine room of a vessel? A. Classes A and B B. Classes B and C C. Clas

40、ses C and D D. Classes A and D62. 2234 One of the methods NOT usually allowed in cleaning up oil spills in the United States is_. A. skimmers B. straw C. dispersants D. sawdust63. 2235 A class D fire would be considered as burning_. A. wood B. oil C. electrical equipment D. magnesium64. 2242 The use

41、 of sinking and dispersing agents for the removal of surface oil is_. A. the most common method used in the United States B. too expensive for common use C. generally safe to sea life D. generally harmful to sea life65. 2238 Fires involving combustible metals are classified as_. A. class A fires B.

42、class B fires C. class C fires D. class D fires66. 2244 A tank which has been sealed for a long period of time can be dangerous because_. A. steel surfaces consume oxygen by rusting B. sealed tanks usually form a vacuum C. moisture condenses in the tank, displacing the oxygen D. most tank coatings g

43、ive off poisonous vapors in the presence of moisture67. 2246 A tank has been sealed and unventilated for a long period of time. Which of the following conditions does this indicate? A. The tank is safe to enter. B. The tank is especially dangerous to enter. C. Carbon monoxide is present. D. Water va

44、por present when the tank was sealed has oxidized.68. 2460 With UMS, when the engine room is unwatched,_ will control the main engine.A. the bridge officer on watch B. the chief engineer C. the duty engineer D. the duty motorman69. 2248 An example of class A fire is a/an A. electrical fire in the en

45、gine room B. oil fire in the engine room bilges C. oil fire involving a grade A petroleum product D. mattress fire in a stateroom70. 2250 Why is it necessary to warn engine room personnel before activating the fixed CO2 system? A. To make them aware there is a fire. B. To let them know they should l

46、eave the engine room. C. To prevent possible injury from frostbite. D. To make them aware that ventilation will automatically stop.71. 2279 Your assigned emergency stations aboard your vessel can be found on the ships_. A. muster list B. certificate of inspection C. clearance papers D. permit to pro

47、ceed72. 2283 The process that occurs when heat is generated by a chemical reaction within a substance and continues to a point of ignition is known as_. A. chemical ignition B. spontaneous combustion C. chemical combustion D. radiation ignition73. 2297 The term discharge, as it applies to the pollut

48、ion regulations, means A. spilling B. leaking C. dumping D. All of the above74. 2318 If a fire ignites in the engine room as a result of a high pressure fuel oil leak, you should FIRST_. A. secure the ventilation B. find a soda acid extinguisher C. shut off the fuel oil supply D. secure the generato

49、r75. 2321 The FIRST step to take in fighting an engine room fire resulting from a ruptured fuel oil service line, is to_. A. evacuate all engine room personnel B. fight the fire with hand portable extinguishers C. activate the main CO2 bank D. stop the flow of leaking fuel oil76. 2334 The necessity

50、for administering artificial respiration may be recognized by the victims _. A. vomiting B. blue color and lack of breathing C. irregular breathing D. unconscious condition77. 2335 All personnel should be familiar with the lifeboats_. A. boarding and operating procedures B. maintenance schedule C. n

51、avigational systems D. fuel consumption rates78. 2366 Which of the precautions listed should be observed when taking on diesel fuel? A. Secure all lighting to the main deck B. Provide a portable fan to blow away fumes C. Prohibit smoking in the area D. Display a black triangle during daylight hours7

52、9. 2367 To avoid excessive pressures in the fuel oil filling system during bunkering, you should _. A. close the tank filling valves quickly B. top off all tanks at the same time C. rill completely all tanks to less than 95 % full D. reduce the loading rate when topping off80. 2376 During fueling op

53、erations, which of the listed precautions should be taken when topping off fuel tanks? A. Reduce the pumping rate by closing the deck filling valve. B. Close all overflow valves. C. Place 5 gallon containers under all flange connections in the fuel line. D. Reduce the pumping rate and sound tanks fr

54、equently as the level rises.81. 2416 After the order “_” is given, the air system is shut down, the turning gear put in, all drains and indicator cocks opened, and the cooling water and lubricating oil systems kept running. A. Stand-by Engine B. Stop Engine C. Finished With Engine D. Dead Slow Ahead

55、82. 2426 The Port Authorities, in accordance with the IMO resolutions have been carrying out_ to enhance safety of ships. A. CPP B. FPP C. PSC D. FSC83. 2434 If you must enter a room or compartment to combat the fire , keep an escape path_. A. open B. close C. opens D. closes84. 0093 Additives_ prot

56、ective layers on metal surfaces guarding them against corrosion.A. damage B. form C. dissolve D. contaminate85. 1835 When a vessel is in dry-dock, the vessels engineers should_.A. examine the condition of the propeller B. chip and paint all hull protection zincsC. install new docking plugs in all co

57、fferdams D. inspect the hull for hogging or sagging86. 2382 The lengthening of a crack formed in the shell plating of a ship may be prevented by_.A. welding brackets across both ends of the crack B. chipping out and slot welding the entire crackC. drilling a hole at each end of the crack D. cutting

58、a square notch at each end of the crack87. 2497 A(n)_ is a mechanical attack on the metal surface which may be due to a disturbance in the flow of the water over the blade of the propeller.A. erosion B. corrosionC. pitting D. dezincification88. 264. Which one of the following repair will cost the least cost? _A. routing docking repair B. voyage repair C. damage repair D. convention第二部分:关联题1.The control officer may determine if all operational requirements of Annex I of MARPOL 73/78 have been met, taking in

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!