1、Communications Sample Questions1. Which of the following is not a process of Project Communcations Management? A. Administrative Closure B. Performance Reporting C. Information Distribution D. Communications Planning E. Conflict Resolution2. Which of the following are outputs from the Communications
2、 Planning process? A. Project records B. Communications management plan C. Performance reports D. Formal acceptance E. b and c3. The receiver filters messages based on all but the following: A. Culture B. Semantics C. Language D. Distance E. Knowledge4. How much time does the typical project manager
3、 spend communicating both formally and informally? A. 40-60% B. 50-70% C. 60-80% D. 75-90%5. In communications management, to assimilate through the mind or senses is the process of: A. Receiving B. Decoding C. Comprehending D. Understanding6. The sending or conveying of information from one place t
4、o another is the process of: A. Networking B. Transmitting C. Encrypting D. Promoting7. Group brainstorming encourages all of the following except: A. Team building B. Analysis of alternatives C. Convergent thinking D. Uninhibited verbalization8. The three major types of communication are: A. Writte
5、n, verbal, and non-verbal. B. Verbal, formal documentation, informal documentation. C. Verbal, written, and graphic. D. Verbal, written, and electronic.9. All of the following are outputs from performance reporting EXCEPT: A. Trend analysis B. S curves, histograms, bar charts, and tables C. Performa
6、nce reports D. Change requests E. Stakeholder reports10. All of the following aid in achieving consensus EXCEPT: A. Maintaining a focus on the problem, not each other. B. Avoiding conflict. C. Seeking facts. D. Avoiding voting, trading, or averaging.11. All of the following are communication tools E
7、XCEPT: A. Memos B. Verbal circulation of a rumor C. Videos D. Body language E. Inputing data into a spreadsheet12. Communication is the PRIME responsibility of a Project: A. Manager in a weak matrix B. Manager in a projectized environment C. Coordinator D. Expeditor13. A tight matrix is: A. A balanc
8、ed matrix organization. B. Where all team members are brought together in one location. C. Where functional managers operate in a dual reporting structure reporting to both their own departments and to the project manager. D. a and c14. The sender is responsible for: A. Confirming the message is und
9、erstood. B. Ensuring the receiver agrees with the message. C. Scheduling communication exchange. D. Presenting the message in the most agreeable manner.15. What are the four parts of the communications model? A. Sending, Receiving, Decoding, and Comprehending B. Sender, Message, Medium, Receiver C.
10、Communicator, Message, Receiver, Decoder D. Communicating, Transmitting, Receiving, Comprehending16. A leadership style in which the project manager shares problems with team members and formulates solutions as a group is called: A. Autocratic B. Consultation in a group C. Consensus D. One-to-one co
11、nsultation17. In negotiating with functional department managers, project managers often find themselves using what two-party conflict management approach? A. Win-Lose B. Win-Win C. Lose-Lose18. A type of organization in which the project manager has little formal authority and basically acts as a s
12、taff assistant to an executive who is ultimately responsible for the project is called: A. Functional B. Weak matrix C. Project coordinator D. Project expediter19. Formal acceptance by the client or sponsor of the project should be preapred and distributed during which process? A. Information Distri
13、bution B. Administrative Closeout C. Organizational Planning D. Performance Reporting20. In which of the following organizations is the project manager role likely to be part-time? A. Weak matrix B. Functional C. Balanced matrix D. a and b E. All of the aboveContract Sample Questions1. A unilateral
14、contract under which the seller is paid a preset amount per unit of service is called:A. A cost reimbursable contractB. A lump sum contractC. A unit price contractD. A fixed price contractE. b or d2. Which of the following is considered during the Procurement Planning Process?A. Whether to procureB.
15、 How to procure and how much to procureC. What and when to procureD. b and cE. all of the above3. From a buyers standpoint, which of the following is true?A. Procurement planning should include consideration of potential subcontractsB. Procurement planning does not include consideration of potential
16、 subcontracts since this is the duty of the contractor.C. Subcontractors are first considered during the Solicitation ProcessD. none of the above4. Which of the following processes involves obtaining information (bids and proposals) from prospective sellers?A. Procurement PlanningB. Source Selection
17、C. Contract AdministrationD. SolicitationE. Solicitation Planning5. Which of the following is true about procurement documents?A. Procurement documents are used to solicit proposals from prospective sellers.B. Invitation for Bid and Request for Proposal are two examples of procurement documents.C. P
18、rocurement documents should be structured to facilitate accurate and complete responses from prospective sellers.D. b and cE. all of the aboveContract Sample Questions, cont.6. Which of the following is a method for quantifying qualitative data in order to minimize the effect of personal prejudice o
19、n source selection?A. Weighting systemB. Screening systemC. Selecting systemD. none of the aboveE. all of the above7. Which of the following is true concerning evaluation criteria?A. Can often be found in procurement documentsB. Can be objective or subjectiveC. Used to rate or score proposalsD. May
20、be limited to purchase price if procurement item is readily available from number of sourcesE. all of the above8. Which of the following are inputs to the Source Selection Process?A. Evaluation criteriaB. Organizational policiesC. Procurement documentsD. a and bE. all of the above9. A significant di
21、fference between independent estimates and proposed pricing could mean that:A. The independent estimates are most likely incorrect and the proposed pricing correctB. The SOW was not adequateC. The prospective seller either misunderstood or failed to respond fully to the SOW.D. b or cE. a or c10. Whi
22、ch of the following are examples of indirect costs?A. Salaries of corporate executivesB. Salaries of full-time project staffC. Overhead costsD. a and bE. a and c11. Which of the following contract types places the greatest risk on the seller?A. Cost-plus-fixed-fee contractB. Cost plus-incentive-fee
23、contractC. Fixed-price-incentive contractD. Firm-fixed-price contract12. In which of the following contract types is the sellers profit limited?A. Cost-plus-percentage-cost contractB. Cost-plus-fixed-fee contractC. Fixed-price-plus-incentiveD. b and cE. none of the above13. A cost-plus-percentage-co
24、st (CPPC) contract has an estimated cost of $120,000 with an agreed profit of 10% of the costs. The actual cost of the project is $130,000. What is the total reimbursement to the seller?A. $143,000B. $142,000C. $140,000D. $132,00014. A cost-plus-incentive-fee (CPIF) contract has an estimated cost of
25、 $150,000 with a predetermined fee of $15,000 and a share ratio of 80/20. The actual costs of the project is $130,000. How much profit does the seller make?A. $31,000B. $19,000C. $15,000D. none of the above15. A fixed-price-plus-incentive-fee (FPI) contract has a target cost of $130,000, a target pr
26、ofit of $15,000, a target price of $145,000, a ceiling price of $160,000, and a share ratio of 80/20. The actual cost of the project was $150,000. How much profit does the seller make?A. $10,000B. $15,000C. $0D. $5,00016. Under what circumstances is it better for a contractor to subcontract?A. The s
27、ubcontractor possesses special technical and engineering skills that the contractor does not have.B. The work to be subcontracted represents almost all of the overall work effort.C. The subcontractor can perform the work at a lower cost than the contractor.D. all the aboveE. a and c17. Which type of
28、 bilateral contract is used for high dollar, standard items?A. Purchase orderB. Request for proposal (RFP)C. Invitation for bid (IFB)D. Request for quotation (RFQ)E. all of them are appropriate18. Which of the following are characteristics of a purchase order?A. A bilateral contract used for low dol
29、lar itemsB. A unilateral contract used when routine, standard cost items are required.C. A bilateral contract used for high dollar, standard itemsD. a and c19. In which stage of the negotiation meeting are points of concession identified?A. probingB. closureC. agreementD. scratch bargaining20. Which type of warranty is enacted if a service or product does not meet the level of quality specified in the contract?A. Implied warranty of merchantabilityB. Implied warranty of specified qualityC. Express warranty D. none of the above
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。