1、BGD 880/881/882 Salt Fog Cabinet operation manualBiuged Laboratory Instruments (Guangzhou) Co.,Ltd-Address: No.8,Fuhe Industrial Area, Zhongfu Road, Zhongxin Town, Zengcheng district, Guangzhou City. ChinaTel:020-32955999 Fax:020-32955818e-mail:service website:About UsBiuged Laboratory Instruments (

2、Guangzhou) Co., Ltd is committed to localization of high-quality, high-precision imported testing instruments for paint & Inks. Since its inception, we always adhering to provide the most professional and sophisticated testing instruments for the paint, coating, ink, printing and other industries .

3、We have many professional sales engineers and service personnel, we can provide you with all aspects of best supporting laboratory instrumentation solutions and solve your GB, ISO, ASTM, ES, JIS, or any non-standard test equipment requirements .Meanwhile, we also provide a variety of instruments in

4、the industrys technical support, specially modified and performance optimization, the overall design of the laboratory, testing personnel training and a full range of standard consulting services. As a member of national paint and pigment Standardization Technical Committee, We have maintained long-

5、term close and good relations of cooperation with most of the national party coating inspection organization, large paint laboratories, universities and research institutes, we active participation in national standards revision and provide them with a variety of the standardized test substrate and

6、the standardized consumables. And ensure Laboratory data accuracy, reproducibility and comparability between different laboratories.Our company headquarters is located in the entrance of Guangzhou Economic and Technological Development Zone and the Guangzhou Science City. So far, BIUGED in more than

7、 thirty countries and regions established agents or offices, In China, we established offices in Shanghai, Wuhan, Chongqing, Xiamen. The company production base is located in Zhongxin Town, Zengcheng district, Guangzhou, our workshop equipmented many imported precision equipment (such as CNC precisi

8、on grinding machines, lathes, milling machines, etc.) and a large number of engineers whom have rich experience in precision machining. We follow with trust, professional, enthusiastic business purpose wholeheartedly welcome yours suggestion and guide!Biuged Laboratory Instruments(Guangzhou)Co. Ltd.

9、 FactoryAddress:No.8,Fuhe Industrial Area, Zhongfu Road, Zhongxin Town, Zengcheng district, Guangzhou City. ChinaTel:020-32955999(10line)Fax:020-32955818E-mail:carishGuangzhou officeAddress:Room 101, No.1, Daguan Middle Road , Dongpu Town, Tianhe District. Guanghzou, ChinaTel:020-82169666Fax:020-823

10、40996E-mail:andysunShanghai officeAddress: No.6066, Huqingping Road., Zhujiajiao Town, Qingpu District, Shanghai City, China. Tel:021-59240298Fax:021-59249719E-mail:xjxWith the continuous development of modern industrial technology, the application field of electronics, electrical products and other

11、 materials is increasingly broad , the environmental conditions become more and more complex and diverse, and only reasonable choice of materials and products for environmental protection measures in order to ensure that products to avoid damage in storage, ensure that products be safe and reliable

12、during use, so, the artificial simulation tests for products and materials are essential important links to ensure the high-quality of them.The artificial natural environment simulation test is scientific generalization to the actual environment , with a typical, standard, easy to use, easy to compa

13、re and other characteristics, the diversity of environmental conditions and the importance of environmental testing put forwarded higher requirements to the environmental testing equipment .We are a professional research and production company who work on environmental testing equipment , we has acc

14、umulated ample experience in the field of environmental testing equipment. Our products are widely used in aviation, military, scientific research, electronics, electrical, automobile, motorcycle, chemical, instrumentation, medical and other fields, in the new century, the company has established a

15、perfect platform for product testing to ensure product quality, in good faith to provide you with first-class equipment and first-class serviceFor you understanding and proper operation of equipment better, we carefully prepared this manual, Please read it serious when you start using the device, an

16、d put it near the device, you must follow the instructions listed attentions and method of operation in order to ensure that the test successfully completed.BGD series of salt spray corrosion test chamber, is one of the leading products of Biuged Laboratory Instruments (Guangzhou) Co., based on the

17、truth-seeking, pioneering as well as innovative enterprise spirit, a group of professional technical elite adopt the Germany advanced concepts, painstaking research and developed a number of advanced technology, stable and reliable environmental testing equipment. This new series of salt spray corro

18、sion test chamber is design and production based on requirements of The Peoples Republic of China GB/T2423.17 electrical and electronic products environmental testing procedures for test Ka: Salt test method. This series of products over a long period tests by market , it achieved widespread acclaim

19、 from users, and represents the most advanced level of environmental testing in China. The following is specific instructions of technical basis , parameters, specifications, construction, installation, operation procedures and maintenance and other related content of the BGD series of salt spray co

20、rrosion test chamber,1. ApplicationThis series of salt spray test machine is suitable for coating, protective layer of metallic material, parts, electronic components and industrial products such as accelerated salt spray corrosion test. According to GB / T 1771 Paints and varnishes - Determination

21、of resistance to neutral salt spray, GB / T 10587 salt spray test chambers, GB / T 2423.17 electric and electronic products environmental testing procedures Ka: Salt test methods and the relative equivalent IEC, DIN, MIL, ASTM, CNS and other standards for a variety of salt spray corrosion test.This

22、product has been tested by Chinese environmental adaptability Electrical Products Testing Center , and through provincial and municipal identification2、Model & specificationsModelBGD 880BGD 881BGD 882Workroom sizeDWH600450400mm900600500mm1100750500mmpower supply220V 50/60HZ220V 50/60HZ220V 50/60HZto

23、tal power1.5KW 2.5KW 3.5KW capacity150L250 L750 L3: Technical parameters & Spray feature3.1 Workroom temperature range: 35 +50 3.2 saturation barrel temperature range: 37 +55 3.3 Temperature uniformity: 2 (no load) 3.4 Temperature fluctuation: 0.5 (no load) 3.5 Heating rate: RT 55 less than 40 minut

24、es 3.6 Salt settlement: 1 2ml/h/80cm2 3.7 Spray: Spraying tower type 3.8 Spray features: continuous, periodic spraying4 : the installation environment conditions1. Ambient temperature: 15 30 ;2. Relative humidity: not more than 85% R H;3. Pressure: 86 106KPa;4. no strong vibration around;5. no stron

25、g magnetic fields affect around, no high concentrations of dust and corrosive substances or inflammable substances;6. No direct sunlight or other heat sources direct radiation;7. no strong airflow around, when the surrounding air should be compulsory flow, the airflow should not be blowing directly

26、on the box;8. test machine should be placed flat, to maintain the level, because the upper box with water seals to prevent salt spills;9. Around of test machine should be keep a certain distance, easy for operation and maintenance;10. Let the machine alone in a laboratory, dont place it together wit

27、h any other device to prevent corrosion other equipment and instruments;11. Not easy be move continual.5 : The constructor Introduction Salt spray chamber structure is as follows: For reference only, according to the real object please.5.1 Interior of test chamber1. spray tower (or baffle type): Bui

28、lt-in glass spray nozzle is placed inside the spray tube, spraying through the tower tube guide and then through the conical diffuser (or baffle) uniformly dispersed spray to the interior of test chamber2. spray adjuster: Adjusts the size of the spray volume, an turn up the conical dispersion (or ba

29、ffle) in the spray tower, the spray volume will increases . On the contrary, Turn down it , the spray volume will reduction.brine preheat tank, located in the bottom of spray tower, those brine through the brine supplement tank injected preheat tank preheat tanks water level by the float control, au

30、tomatic control of water level drain outfall in the bottom of tank, it controlled by a rubber stopper.3. Collector : the fog off volume from the spray nozzle in free mode fall at 80cm of measuring cup, then by the conduit flow to the metering cup.4. sample frame: This frame is made by plastic steel,

31、 so the focus point is limited of not more than 2Kg weight, but this frame can bear within 10Kg weight if dispersive place the sample. there is upper and lower two rows of holes arrange at the both sizes of racks, 5. Heating bath: This heating bath attached to the bottom of the test chamber, it use

32、for contain water and heating to keep temperature of test chamber stable, its function heating, insulation 5.2 External of test chamber Measuring cylinder: Collect spray volume of each test, each 50ml as highest scale. isolated bath: use the water seal principle to prevent leakage of salt fog. satur

33、ated air tank: placed at bottom of the control box, made by SUS # 304 stainless steel, its function is heating, humidifying, make the air reach to saturation humidity then send to the spray nozzle. Chamber lid: Rooftop type bavel 100 angle perspective lid use for covering the top of the test chamber

34、 to combined into one. pressure regulating valve: Manually adjusting the intake and spray pressure. Inlet pressure is controlled at 0.4MPa; spray pressure is controlled at 0.07 0.17MPa. Pressure meter: This meter shows the air pressure is at that moment when the air through the saturated air cylinde

35、r heated and reach to spray nozzle. exhaust pipe: 1/2 caliber pipelines, connect drainpipe to gutter to let wastewater drain out from there. water inlet: supply brine of test chamber and pure water of saturated brine until normal conditions of use.5.3 Control System 1.test chamber temperature contro

36、ller: Control test chamber temperature, according to the standard temperature setting.2. Saturated air barrel temperature controller: Control saturated air barrel temperature.3. Timer: adjustable 1 9999hr test time can be arbitrarily set, the end of automatic shutdown, with automatic zero device.4.T

37、ime counter: Direct reading 0 9999.9hr, it can indicate the cumulative test time.5. Heating tank over-temperature protection: protect of the water temperature of heating, it set temperature at 75 . Located in the control box6.Saturated air bucket over-temperature protection: Saturated air bucket tem

38、perature control, temperature safety settings value than the actual temperature 5 . (Located in the control box)7. Power Switch: Illuminated Rocker type, control the machines main power.8. Operation switch: Illuminated Rocker type, control heating system and spray system of heating tank of test cham

39、ber and saturated air barrel.9. The left low water warning light: when the water level of heating tank below the lower limit, then light on, and cut off the operating system.10. The right Low water warning light : Saturated bucket of water level below the lower limit, then the light on, and cut off

40、the operation system.(11) Lid switch: BGD882 salt spray chamber with handle rotary lid switch that controls the opening and closing lid.6 : Test Chamber Installation Instruction.6.1 please install a no-fuse breaker plus or knife switch between machines outside wire and 2.5mm total power wire.6.2 The

41、 chamber lid of BGD882 salt spray chamber equipped with a air pump , turn on the lid switch to lid open location, the lid will be support automatically when it up to the top, and then the lid switch is turn to lid stop location; if want to close the lid, please turn the switch to the lid off locatio

42、n . The lid will be support automatically after it off in place, and then turn the lid switch to lid stop location ;BGD880 salt spray chamber dont have air pump, you can manually open the chamber lid directly.6.3 PVC1 / 2 rigid pipe can be use as drain pipe, please note water pipes should be downwar

43、ds; exhaust pipe can be replace by other models soft pipe and extend it to outdoor to discharge, should to pay attention for installation of the exhaust pipe, it should be parallel up or down along the machine. Correct Incorrect 6.4 Installation of the spray tower(as is shown in the figure),which is

44、 erected in the center of the built-in sample stand.Note :A. Install glass nozzle must gently, in case to damage to glass nozzle by overexert.B. Let the outlet of glass nozzle up and put into circular the center location of the spray tower tube, while rotating the glass nozzle fastening nut.C. keep

45、a certain distance between the tip of spray tower and the cylindrical tower body to ensure the salt fog be spray out.6.5 Installation of the funnel cylinder(as is shown in the figure)Note: A. Stuff up the silicone pipe which leading to inside the cabinets with a rubber stopper to prevent salt fog le

46、ak, thus effecting electrical systems and other equipment.B. Install the rubber stopper 2 on the outlet of glass cylinder (as above figure), Install glass nozzle must gently, in case to damage to glass nozzle by overexert.C. Put the glass cylinders which installed rubber stopper 2 vertically upwards

47、 on the cylinder bracket, as shown above 6.6 Installation of Lid support: install the lid support at back of salt spray chamber with screws, let the screws into original threaded hole.6.7 The air source pipe connect to the air inlet of pressure regulating valve. Please turn off air source before you

48、 start installation, prevent too much pressure damage the device. 6.8 This machine is made of PVC plastic, do not drastic collision in case machine rupture. do not more than the standard temperature range of test, thus avoid distortion due to overheating7 : Preparation before start7.1 Replenish wate

49、r at the bottom of workroom: Turn on the power switch, The panel low water indicator light on, tap water should be added to the bottom of the workroom, until the water level reaches the overflow gap, then stop, subject to low water level light off which located at the left of panel, if there shows l

50、ow water in the chamber when starting up the machine, Please check whether the chamber hold on level .7.2 Replenish water in seal groove: adding water into the seal groove which located around the upside of chamber before test, not too full, subject to the water and salt fog not spill after close th

51、e chamber lid. 7.3 Replenish water in saturated barrel: adding distilled water or deionized water into air-saturated bucket , , subject to low water level light off which located at the right of panel, saturated barrel located at right corner of the chamber, there is a root of water level pipe near

52、to transparent plastic pipe , the water level should reach to four-fifths position of water level pipe is appropriate, when the water level is reduced to 1/4 means should to timely replenish water , thus prevent test interrupt caused by water shortages so then affect the test process. If the water l

53、evel of saturated barrel is not enough, please add the right amount of pure water or distilled , please turn off the spraying switch when replenish water, turn on the charging liquid valve of saturated barrel first ,and then , pure water or distilled water from the saturated barrel outlet, turn off

54、the charging liquid valve replenish water . Note: Do not add water in the spraying process, r must turn off the gas supply when adding water, otherwise, water will cant be add into saturated barrel. 7.4 Charging brine: put the concocted salt solution (as 5% concentration) into the storage tank which

55、 located at the top of control box of machine , exhaust gas which inside silicone tube, brine flow into the spraying tower automatically, brine cant be lower than the lower limit mark of storage tank .7.5 Install fog release pipe: when released fog affected other equipment in the room. User are allo

56、wed to lengthen exhaust pipe, let released fog flow to outdoor or into sewer. But exhaust pipe cant be block. In case to affect release salt fog. And blocked pipe will make pressure in workroom unceasing increase , result in chamber lid be open by air .thus to affect whole test . 7.6 Install funnel

57、inside the test chamber: Check the connection pipe between the funnel and the fog collector is unobstructed, make sure it dont affect the collection of falling Salt fog. 7.7 Place the sample: Open the chamber lid, put the samples on the sample holder of workroom correctly, and tilting angle should t

58、o according with required standards, such as the standard panel 130 70 (mm), can be place as 15 degrees, 30 degrees. There should keep some distance between the sample and the sample, let the exposed surface area of the sample is greater than 98%, then close the chamber lid. 7.8 Adjust inlet air pre

59、ssure regulating valve: You must adjust the valve in the smallest position, to avoid too much pressure damage the equipment after the valve connect with air source (for direction and quantity of pressure ,please see the instructions of pressure regulating valve ) 8, WarningThis chamber must cant be

60、used for test with following substance or any test which containing following substance : 1, explosives:1.1, nitrated glycol (ethylene glycol dinitrate), nitroglycerine (propylene glycol trinitrate), nitrocellulose, and other explosive nitrate.1.2, trinitrobenzene, trinitrotoluene, trinitrophenol (p

61、icric acid) and other explosive nitro compounds.1.3, Peracetic acid, methyl ethyl ketone peroxide, benzoyl peroxide and other organic peroxides2. Combustible materials:Metal: Lithium, K, soda, phosphorus sulfide, phosphorus, red phosphorus.Celluloid categories: carbide (carbide), phosphate of lime,

62、magnesium, aluminum, sodium hydrogen sulfite.3, Inflammable materials:(1) diethyl ether, petrol, propylene oxide, carbon disulfide, and other substances which the fire point lower than -30 .(2) General oxide, alkylene oxide, acetone, benzene, methyl ethyl ketone, and other substances which the fire

63、point higher than -30 but lower than 0 .(3) methanol, ethanol, xylene, amyl acetate, and other substances which the fire point higher than 0 but lower than 30 substances.(4) kerosene, light oil, turpentine, isoamyl alcohol, acetic acid, and other substances which the fire point higher than 30 but lower than 65 substances4. Flammable gases:Hydrogen, acetylene, ethylene, methane, ethane, propane, butane and other gas which could be burning at a temperature of

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!