1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit

2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,

3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi

4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail

5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the

6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi

7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free

8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i

9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al

10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material

11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev

12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan

13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to

14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen

15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of

17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple

18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize

19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma

20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels

21、cadres in enterprise development in the营口隆兴建筑工程有限责任公司 大石桥龙首商业街挡土墙、车库施工组织设计大石桥龙首商业街挡土墙、车库施工组织设计编制人:审批人:审核人:编制单位:营口隆兴建筑工程有限责任公司编制日期:2013年7月28日目 录第一章 工程概况 1第二章 施工总体部署 3第三章 施工准备与资源配备 5第四章 施工现场平面布置 9第五章 土建工程主要项目施工方案13第六章 外脚手架施工方案43第七章 边坡支护施工方案第八章 安装工程主要项目施工方案46第九章 工期计划69第十章 质量通病防治措施69第十一章 争创市优良工程保证措施76第十

22、二章 安全生产保证措施91第十三章 文明施工保证措施94第十四章 工程施工协调配合97第十五章 降低工程成本节约资源99第十六章 工程技术资料管理与技术计划101第十七章 保修服务103recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste

23、 someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construct

24、ion personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4,

25、 construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the developmen

26、t of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must

27、 be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspectio

28、n score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution pre

29、vention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction si

30、te entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road,

31、 grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal l

32、ife of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialof backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, st

33、rengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traf

34、fic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we clea

35、rly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight more

36、spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in th

37、e new year, good health, happy, happy第一章 工程概况第一节 工程概况1、工程概况本工程为大石桥龙首商业街挡土墙、车库工程。地上一二层,结构形式为现浇框架结构,建筑结构的安全等级为二级。抗震设防类别为丙类,抗震设防烈度为7度第一组,设计基本地震加速度值为0.10g;框架抗震等级均为三级。设计使用年限为50年该工程。总建筑面积为 ,建筑基底面积 。屋面防水等级为类。建设地点:大石桥市蟠龙山广场东侧。2、本工程计划工期为60日历天。3、质量等级:合格。4、工程施工范围:施工蓝图及合同约定的工程内容。包括:建筑工程a)基础回填、基坑清槽、房心回填土;b)基础、垫层

38、;c)防水工程;d)地上及地下主体工程;e)内外墙砌筑及抹灰工程;g)外墙保温工程(甲方保留委托的权利);h)屋面工程;a)室外至环型箱配管。环型箱至电表箱、电表箱后的电缆、桥架、配管、穿线、灯具及电气设备的安装调试等内容。每户照明点安装一个灯泡,开关面板、插座等均安装到位,换气扇仅预留电线、接线盒。b)弱电工程及消防工程预留预埋(配管、接线盒、接线箱等)。c)避雷、接地,按图纸要求施工到位;给排水工程包含不同材质的各种给排水、热水、管道配管、管件、支架、阀门、水表、水泵等的制作、预埋、预留及及安装,管道冲洗、消毒、试压等。采暖工程包含不同材质的各种采暖管道配管、管件、支架、阀门、暖气片等的制

39、作、预埋、预留及及安装,管道冲洗、消毒、试压等。其他建筑物施工完成后,建筑物室内清扫(含配套分包项目的污染面清除),建筑物室外周围红线范围内的平整、清理、清扫、建筑垃圾外运等。5、现场条件:本工程“三通一平”,由建设单位委托施工单位自行施工,工程竣工时统一决算。第二节基础、主体结构特征1、基础(1)、柱下独立基础:地基承载400Kpa;(2)、基础垫层:C15混凝土垫层;(3)、伐板基础、剪力墙:C30P6混凝土。2、主体: C30(1)、构造柱、圈过梁、女儿墙压顶、窗台板混凝土强度:均为C25混凝土;(2)、混凝土板:为C30混凝土;(3)、墙体:填充墙:地上建筑填充墙体为轻集料混凝土小型空

40、心砌块墙体(部分为轻集料混凝土小型实心砌块)外墙填充墙采用200厚轻集料混凝土小型空心砌块墙体砌块强度不低于MU3.5女儿墙采用MU15黄河淤泥烧结砖,M7.5水泥砂浆砌筑,外墙采用A3.5加气混凝土砌块,M5加气混凝土砌块专用砂浆砌筑。第三节 编制依据及原则1、 编制依据1.1 大石桥龙首商业街车库、挡土墙工程施工招标文件;1.2大石桥龙首商业街车库、挡土墙工程施工合同;1.3 大石桥龙首商业街车库、挡土墙工程施工图纸;1.4国家现行的有关施工验收标准及规范、施工工艺标准;2、采用的技术标准及规范:2.1建筑工程施工质量验收统一标准(GB50300-2001);2.2地基与基础工程施工质量验

41、收规范(GB50202-2002);2.3混凝土结构工程施工质量验收规范(GB50204-2002)2.4砌体工程施工质量验收规范(GB50203-2002)2.5屋面工程施工质量验收规范(GB50207-2002)2.6建筑装饰装修工程施工质量验收规范(GB50210-2002)2.7建筑地面工程施工质量验收规范(GB50209-2002)2.8建筑给水排水及采暖工程施工质量验收规范(GB50242-2002)2.9建筑电气工程施工质量验收规范(GB50303-2002)2.10建筑工程项目管理规范(GB/T50320-2001)2.11建筑施工现场管理标准(DBJ14-033-2005)2

42、.12建筑工程文件归档整理规范(GB/T50328-2001)2.13建筑工程施工工艺规程(TBJ14-032-2004)2.14工程测量规范(GB50026-93)2.15建筑机械使用安全技术规程(JGJ33-86)2.16施工现场临时用电安全技术规程(JGJ46-2005)3、编制原则:3.1认真研究招标文件、施工合同、施工图纸,及现场条件等资料;3.2坚持“高起点、高标准、严要求”的原则;3.3贯彻执行国家、省市有关标准以及企业标准;3.4统筹安排、合理组织、突出重点;3.5确保工程质量及施工安全;3.6加强经济核算、落实增产节约;第二章施工总体部署第一节施工项目管理目标工期计划、施工控

43、制点(一)工期计划总工期:总日历天数为 60天。施工控制点:1、基础工程:20天2、主体工程:20天3、屋面工程:10天(与砌体、抹灰工程同时施工)4、楼地面工程:5天5、竣工清理:5天6、水电卫安装调试配合土建进行,工程竣工调试完毕。7、因本工程是边设计边施工,施工图纸的出图时间会对本工程的施工进度产生严重影响,会造成不可避免的工期延误及窝工情况。第二节施工组织1、实行项目责任制管理,成立项目经理部,由杨宇担任项目经理,土建、安装专业项目技术负责人及有关技术管理人员组成,按照公司服务控制,项目授权管理,专业施工保障,各方通力协作的模式,卓有成效地实施质量、工期、安全、成本、及环境的目标。2、

44、施工人员实行专业化组织,按不同工种,不同施工部位划分作业班组,使各专业班组人员从事性质不相同的工作,提高操作工人的熟练程度和劳动生产率。3、专业班组实行物资消耗考核,定额计件工资管理,项目部管理人员负责监督其施工方法、质量、进度、安全等,项目经理统筹安排项目的人力,物力的平衡调度。第三节施工规划1、本工程的施工程序遵循:“先地下、后地上,先主体、后围护,先结构、后装饰”的原则。2、基础、主体结构施工:该工程拟配4台QTZ40塔吊(具体位置见平面图)负责材料的垂直输送;钢筋集中加工,原位绑扎;模板采用竹胶板模板,满堂红承重钢管支撑体系.为加快施工进度,塔吊在基础施工前安装,以充分发挥机械利用率。

45、由于施工现场狭长,各种建筑原材料都须要二次倒运才能送达施工部位。3、装饰施工:装饰工程的好坏直接影响到建筑物的观感和使用功能,我们把装饰工程的质量控制作为重点.外饰由上而下,内饰由下而上分段进行,此阶段装饰、水电暖各专业处于交叉施工阶段,人员和材料进场较多,应加强施工工序的协调和配合。4、水电暖安装施工:水电暖安装工程的质量影响着建筑物的使用功能,所以要加强施工质量和进度控制,做好隐蔽前的试验和验收工作,使水电暖工程的一次验收合格率达到标准要求。6、尾工:建筑物工程量即基本结束后,应派专人负责成品的保护,同时现场留有足够的人力物力进行善后工作,工程技术资料着手整理、装订、送审,积极准备工程的竣

46、工验收。第三章施工准备与资源配备第一节技术准备1、测量放线,根据业主提供的测量坐标控制点进行复核,布设坐标控制网,引测半永久型施工水准点。2、组织学习、熟悉施工图纸、设计文件及有关标准,领会设计意图,做好图纸会审准备工作。3、对施工技术人员和操作工人组织培训学习,进行分级交底。4、编制施工进度控制实施细则,分解工程进度控制目标,明确各自责职,确保工期。5、编制工程质量实施细则,确定质量控制点,分解施工质量目标,建立施工质量保证体系,对特殊部位和特殊工艺等编制详细的作业指导书。6、编制施工成本控制实施细则,分解施工成本控制目标,建成施工成本信息监控体系,编制材料、设备进货计划,落实材料货源,提供

47、业主所供材料、设备供应计划。第二节场内准备1、配合建设单位向有关部门提交申请报告,领取项目施工许可证与安全许可证。2、配合建设单位与当地卫生、环境、市容、交通、派出所等部门联系,办理有关手续。 第三节主要施工机械设备使用计划表主要施工机械设备使用计划表(土建)序号设备名称型 号规 格本工程用量产地定 额功 率进场时间1塔吊QTZ404东营25KW13.8.153搅拌机JZC3504青岛5.5KW13.8.104对焊机UN1-1006潍坊50KW13.8.105立焊机BX3-3604维坊15KW13.8.106弯曲机GW-406青岛3.5KW13.8.57切断机GQ-406青岛5.5KW13.8

48、.58电焊机AX7-3006淄博5KW13.8.59平板振动器BP1.58河南1.1KW13.8.510插入式振动器ZX50-612河南1.1KW13.8.511圆盘锯6济南5.5KW13.8.512平板刨MB903A6济南2.2KW13.8.513潜水泵QY3210维坊2.2KW13.8.5第四节主要施工周转材料使用计划序号名 称规 格单 位本工程数量进场时间1钢 管483.5千米813.8.15-13.8.202扣 件万只513.8.15-13.8.203平网60001200块200013.8.164立网60001500块300013.8.165脚手架板3000250块100013.8.1

49、66电缆4*50+1*16米8013.8.107电缆4*16+1*6米5013.8.108水管DN100米30013.8.5第五节主要工艺检测计量器具使用计划表序号仪器名称型号数量单位厂家1激光垂准仪DZG64台苏光2光学经纬仪J2JD3台苏光3自动安平水准仪DSZ36台北京4水准仪DS34台南京5钢卷尺50m5把南京6对讲机GP6820对天津7接受靶4个8L1普通型锢钢尺3m4个淄博9组合检测工具4套10磅秤6台11钢卷尺5m5把12砼抗压模5组13砂浆试压5组第六节专业施工人员使用计划根据预算工程量与工期安排,结合以往施工经验,各专业施工人员使用计划如下:基础结构施工:工程木工钢筋工砼工架

50、子工瓦工现场电工合计本工程人数502015101061110.00以上主体结构施工工种木工钢筋工砼工架子工安装工瓦工现场电工其它合计本工程人数11035253020201045285装修施工阶段工种木工抹灰工油漆工架子工现场电工安装工其它合计本工程人数10602040202040210公司根据项目部每月提供的施工形象进度与劳动力使用计划及时予以补充调整,以确保施工正常进行。第四章施工现场平面布置第一节现场布置原则与标准化管理要求1、布置原则:科学、合理、文明、规范:a、施工现场实行办公区、生活区与施工区三区分离,办公区、生活区布置于生产区南侧,以便于管理。b、接受建设单位的委托自行解决现场“三

51、通一平”,施工现场场地做硬化处理,建立有效的排污系统。c、现场分阶段布置,现场道路全部采用山皮石和石粉做硬化处理,钢筋模板制作区、搅拌站等位置按要求搭设防护棚,地面做混凝土硬覆盖。d、充分考虑周边环境,做好防护、亮化、绿化工作。2、标准化管理:科学规范,卫生整洁a、标准化管理由项目经理负责,日常工作由标准化负责人与值勤员负责实施。b、实行平面图管理,经项目经理审批后实施,现场划区划段,材料标识堆放。c、生活区轮流值班,定时打扫,每周检查评比。d、生产区挂牌施工,谁做谁清,随做随清,工完料净现场清,以组为单位实行旬查考核。e、施工大门净化,亮化,24小时值班,人员挂牌上岗。f、施工现场设置水冲厕

52、所和淋浴室。g、现场设吸烟室,施工现场禁止吸烟,按规定设置消防器材。3、施工现场平面布置图。(附图)第二节施工现场用电平面布置1、电源概况:在本工程的两个标段交汇处设置了现场施工电源总箱,但是因为本标段施工现场过长,中后段电压不能满足施工要求,须设置备用电源;另外因为距离太远现场须另外增加大量施工电缆;根据机械设备实际使用情况设置二级箱和三级箱。2、现场线路布置:a、本工程的临时用电采用TN-S供配电系统,现场临时用电干线供电采用(VV-450+116)五芯电缆埋地敷设,施工机具采用(VV-310+14)五芯电缆供电,生活用电采用绝缘塑料三芯护套线供电;供电干线依据施工平面图布置。b、线路布置

53、,供电干线沿现场围墙供至各分配电箱,跨越主要通道的干线均埋地60CM以下,外加保护套管且进行填砂保护。c、现场采用“三级配电三级保护”。即总配电柜-分配电箱-开关箱,每级都设漏电保护装置。d、生活区职工宿舍敷设日光灯照明、空调、插座三路总线,均单独控制。e、楼层供电:由分配电箱引出干线,设分配电箱壹只,分别向首层、二层供电,各楼层施工时,设移动式开关箱。3、安全技术措施:a、所有临时施工均采用橡套电缆供电,采用五芯电缆,实行埋地的线缆,套管保护,架空线跨越主要通道时,线缆最低点与地面净高不小于5M。b、所有施工设备必须进行保护接零。c、在总配电柜及分配电箱处保护零线须进行重复接地,按地电阻4。

54、d、实行“一机一闸一漏一保”,漏电开关不动作电流动力不大于30MA,照明不大于15MA,动作时间小于0.1S。e、单相或二相用电,坚持保证三相用电平衡的原则,照明干线须采用三相线和工作零线同时引出,均匀负荷等。f、楼梯间及阴暗潮湿场所,采用36V安全电压供电。g、建立临时用电的“五大制度”,执行安装、检修的“八大措施”等。h、各供电干线、支线,须在控制电器上写字标识清晰。i、至楼层的临时干线,每二层固定一次。第三节施工现场用水现场平面布置1、水源概况:在现场西南面提供了施工水源一处,水源仅设闸门,场内供水管线由公司自行敷设,现场布置须满足消防及施工要求。2、施工用水现场平面布置:本工程的施工用

55、水按施工平面图布置,敷设75塑料水管,送至各用水处。在搅拌机处设置蓄水罐,并在水罐处安装高压水泵壹台,敷设50的竖管,通过管道井向楼层供水,施工用水采用橡胶管和给水管连接供水。3、消防用水除施工用水可以利用外,另外在现场设置蓄水池,用来灭火。第四节现场主要垂直施工机械布置整个限场设四台QTZ40塔吊,详见平面布置图。塔吊在基础施工前安装。在砌筑、装修、屋面及安装工程施工期间,现场设置三台门式架。第五节现场生产、生活设施1、生活设施:按照施工计划,本工程施工高峰期职工人数在260人左右,结合工程际情况,需搭设如下设施:a、职工食堂: 100M2b、职工宿舍: 600M2c、施工及监理办公:80M

56、2d、厕所: 40M22、生产设施:a、钢筋加工棚:本工程搭设300M2,内设对焊机、切断机、弯曲机等机械。b、木工棚计300M2。第六节施工现场排水、消防通讯平面布置1、排水:a、沿建筑物周边及场内道路设300宽排水明沟,间隔25M左右设窨井,根据现场自然地势,由西向东排放,经沉淀后就近排入排水管道。b、施工大门设汽车冲洗台与沉淀池,确保运输车辆洁净出入。c、生活区地下敷设300排污管,经二级沉淀池沉淀后排入生产区南河道内。d、建现场水冲厕所一座,建临时化粪池一座。2、消防:A、现场设宽6M道路,作为消防与施工材料运输通道,施工中注意通道畅通,不得占用或堆放任何材料。B、木工房、钢筋房、脚手

57、架等按规定设置防火器材。第五章土建工程主要项目施工方案第一节工程测量方案本工程测量分平面控制测量,轴线竖向控制测量,高程控制测量和变形测量四个方面。1、平面测量在该工程平面控制测量中我们采用经纬仪和全站仪进行,根据图纸、现场情况和建设单位提供的有关数据通盘考虑,全场进行精确测量,且注意控制点的稳固性,防止交叉施工作业中破坏或位移。根据工程的特点,在每栋建筑的平面控制网中的主要轴线相互交接处布设四个控制点,并对其垂直度和对角线要严格复核,然后向外引测,形成控制网,在工程施工中把控制轴线引测到结构层上。为了防止各控制点在施工中受到破坏,将所有控制桩点,轴线桩点用混凝土加以保护,做好标志。所有控制点

58、的测量经测量人员自检无误后形成正式的测量报告,交公司技术科验收,然后交监理单位、建设单位验收审核后方可进行下道工序。人员配备:成立测量小组由项目技术负责人任组长,负责制定方案、设定测量程序。设专业测量员2名,负责仪器的操作和维护保养,负责测量工作及数据整理与记录等。2、轴线竖向控制测量楼层轴线的引测采用内控法,使用激光垂准仪投点,逐层引测。在各楼层的纵横主轴线交点内侧部位留四个矩形孔,即将激光垂准仪架设在储藏室楼面控制点上,向上层楼面投点,上引轴线,形成内控控制线。为防止施工用水沿孔口流淌到测量仪器上,在孔口的四周用砖砌筑200高阻水圈,各层楼面上的投点经复核无误后,弹出墨线,依据墨线控制线再

59、放出建筑各部位尺寸线。3、高程控制高程控制点在一层柱施工完成后用水准仪引测到一层柱上,数量为四个,且点的高程要闭合一致,标高标注为米,用红漆标注好,要符合标高标注方式。每一结构层用校验好的钢卷尺向上引测,并用水准仪闭合后注好标志作为所在楼层施工的标高控制点,注意每层施工时标高引测起点都必须是一层标高控制点,防止层层推进造成累计误差,认真复核后作为上部楼层标高的控制起始点。4、沉降观测根据变形测量规范的要求,结合本工程的特点,注重对楼层的变形测量,计算出每次沉降量和累计沉降量,且定时对施工楼层进行垂直测量,发现异常情况及时向设计单位、建设单位和监理单位呈报。本工程共设六个沉降观测点。所设观测点的

60、高度要求一致。沉降观测采用闭合法按三等水准测量要求进行,测量工作定人(专业培训过的二人小组负责)、定机。观测周期如下:主体工程每完成一层观测一次,装饰阶段每月一次,竣工后每两月一次,直至工程沉降趋于稳定为止。观测资料专人保管,每季度根据观测结果绘一份沉降量与时间关系曲线图,最终纳入工程资料一并存档。第二节基础工程1、土方开挖土方开挖前,清理外运场地地表土及原设备基础混凝土等,外运土方量及设备使用情况见工程量签证单。本工程基槽开挖采用320反铲挖掘机,设计基础地面20cm以上采用挖掘机挖土,以下采用人工挖土,因现场过于狭小,开槽土方全部外运,基础施工完毕购土回填。为保证工程质量,土方工程施工应做

61、到:1)、施工区域内的水准点和控制桩必须妥善保护,用混凝土镶牢,土方开挖前,必须对控制桩进行检查,复测,施工过程中不得任意碰撞或在其上堆土。2)、土方施工前,对操作人员进行施工方案中操作方法、质量标准和安全规程的书面和口头交底,在施工过程中应随时检查执行情况,如发现有违反,应立即给予纠正。3)、机械挖土时,人工配合,无地下室的开挖深度不大,土方开挖一步到位,开挖时,有地下室的分两层开挖,为防止机械破坏土层,基底留20cm厚土层,采用人工挖掘。土方开挖后,及时请有关人员进行地基验槽,并做好验槽记录工作。 4)、基坑周边挖排水明沟,在每个单位工程基坑内设置2个集水井,用4寸泥浆泵24小时抽水,以保证基底干燥,直至基础施工验收完毕。2、土方回填回填土要求干松、无大块颗粒、无杂质,如果坑内有积水时应先将水排净而后进

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!