1、Family decoration construction mainly includes six aspects: water supply and drainage engineering, electrical engineering, pipeline flooring base, clapboard grassroots, sets of doors and windows, ceiling base plate base.给排水工程 Water supply and drainage engineering1需要按照事先规划设计好的设计图来进行安排管位,开凿,固定等作业。安置后,

2、需要及时的检查管位的通畅性,如果是顺畅的,需要用物体胶袋等盖好管口,防止有其他东西进入管内,造成日后的堵塞。1 in accordance with the needs of advance planning design designed to arrange the tube position, cut, fixed operations. Post placement, need patency check pipe position in time, if it is smooth, need to cover the nozzle used body bags, prevent ot

3、her things into the pipe, resulting in blocking.2如果是发现堵塞的,需要几时的找出堵塞的部位,做出应急措施。一切正常了,需要对水管进行封闭状态,进行打压试水实验。安排管位时,需要预留检修口以及开关阀门,方便日后维修使用。2 if it is found that the blockage, need when find blockages, make emergency measures. All normal, need to be closed on the water, to test the water pressure experime

4、nt. Arrange the tube position, the need for maintenance and repair switch valve, to facilitate future use.3厨房,卫生间,部分阳台,需要做防水层的必须按照国家标准做好防水层处理,做好验收结果。3 kitchen, toilet, balcony part, need to do waterproof layer of waterproof layer processing must be done in accordance with national standards, do the

5、examination results.电器管线工程 Electric pipeline engineering1电源线埋管时,必须穿外面套上专用的PVC管,一根管需要按照口径合理分布电线的根数,电线在管内套用时,不能出现有结合扭结。1 power line pipe, must wear is sleeved outside the special PVC tube, a tube according to the root diameter distribution wire, wire in the tube form, cannot appear with a kink.2电线PVC管

6、在弯曲处,应使用配套弯头,保证管内外完好,顺畅。2 wire PVC tube in the bend, should be supporting the use of elbow, ensure pipe and intact, smooth.3电源线跟弱电线路不得同时在一个PVC管内套入,强弱电的间距应该保持有50CM左右,以减少它们之间的电磁干扰。整体必须符合:“火线进开关,零线进灯头”,“左零右火接地在上”的规定。3 power line with weak lines shall not simultaneously in a PVC tube sleeve, spacing of

7、electric strength should be about 50CM, in order to reduce the electromagnetic interference between them. The whole must meet: line into switches, zero line into cap, the left zero right fire grounded in provisions.地板基层工程 The floor base engineering1地板基层需要对地面的水泥砂浆面层面进行验收。保证不开列,不起砂,面层水平延伸。The 1 floor

8、level need to cement mortar surface layer on the surface of the acceptance. Promise not to make, not sand, surface layer extending horizontally.2厨房,卫生间,阳台等有地漏的位置,需要考虑坡度的放线处理。2 Kitchen, toilet, balcony floor drain location, need to consider the slope of the line processing.3保证日后使用排水要顺利。砌筑用的材料需要做好准备,横

9、平竖直拉好线。3 ensure the future use of drainage to smoothly. Building materials need to be prepared, Wang Ping vertical pull wire.门窗套板基层 A plate base1门窗工程是建立在泥水工的基础上。根据设计好的图纸,放好门窗洞口,进行批荡抹平。1 doors and windows is based on Mason. According to the design drawings, put the doors and the windows were smoothed

10、, plaster.2门窗如果长度较大时,需要倒置横梁来固定,增加牢固性跟安全性。2 doors and windows if the length is larger, need to be inverted beam fixed, increase the stability and security.3安置好门窗框架后,方可安装玻璃,撕开保护膜。如果顺序错误,容易导致框架外观磨损,玻璃破坏等现象发生。The 3 set of window and door frames, can be installed glass, tearing protective film. If the se

11、quence error, easily lead to the appearance of glass frame of wear, damage and so.吊顶基层 Ceiling base1吊顶工程需要根据图示说明,采用合适的龙骨进行固定支架。如果是采用木龙骨,有必要的需要刷防火漆,不锈钢螺丝钉。According to the 1 ceiling engineering illustration, using proper keel fixed bracket. If using wooden keel, necessary need to brush fire paint, st

12、ainless steel screws.2中间的板材,缝隙,需要用胶带贴上,再进行刮腻子,打磨,油漆作业。Plate, the 2 intermediate gap, need to use the tape, then blows the putty, sanding, paint job.3除了严格遵守工艺要求,绝不偷减流程外,还要灵活掌握现场的温度、湿度等影响因素。3 in addition to strictly comply with process requirements, not steal reduction processes, but also flexible factors affecting scene temperature, humidity etc.

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!