1、4,000,000 tons laterite-nickel ore Project in IndonesiaFeasibility Study ReportChapter 1 General Introduction1.1 Overview of the project.71.2 Research conclusions of the project established. 8 1.2.1 Marketprospects. 81.2.2 Supply of the raw material . 8 1.2.3 Policy protection.91.2.4 Capital assuran

2、ce .91.2.5 Organization guarantee. 91.2.6 Technical support. 91.2.7 HR building. 91.2.8 Risk control.101.2.9 Financial Benefit conclusion .111.2.10 Social benefits conclusion .111.2.11Feasibility compositive estimation of the project established. 111.3 Main technical and economic indexes. 11Chapter

3、2 Background of the Project2.1 The background of construction.132.2 The necessity of construction .132.3The feasibility of construction .132.3.1 Economic feasibility .132.3.2 Policy feasibility.142.3.3 Technical feasibility.142.3.4 Model feasibility.142.3.5 Organization and HR feasibility.15Chapter

4、3 Project Analysis and Forecasting3.1 The market scale survey .153.2Themarketcompetence survey.163.3 The market prospect forecasting.173.4 The product schemes and construction scale173.5 The forecast of the product sales revenue .18Chapter 4 Construction conditions and site selection4.1 Resources an

5、d raw materials.184.2 Selection area for the construction.194.3 Site selection.19Chapter 5 Plant Know-How5.1 Project composition .205.2 Technical solutions in production.215.2.1Selection of process technical scheme.215.2.2 Process flow.235.2.3 Brief outline of the process.255.3 29 full intelligent t

6、unnel kiln.265.3.1 Brief description of the tunnel kiln development.265.3.2 Structure of the tunnel kiln.275.3.3 Kiln structure.295.3.4 Main technical parameters of the tunnel kiln .345.3.5 Comparative advantages and disadvantages of the rotary and tunnel kiln.355.4 24 sets3. 6m two-stage gas furnac

7、e, air-cooled, cooling process cold gas stations. 365.4.1 Overview of gas furnace.365.4.2 Planning design basis.375.4.3 Project scale and main technical requirements.385.4.4 National standard (adopted or referenced)385.4.5 Design of gas station.395.4.6 Brief outline of the process and advantages in

8、energy saving and environment protection.435.4.7 Flowing process.445.4.8 Main characters of 3.6m two stages generator.485.4.9 Electronic control and instrument system in gas station.495.4.10 Pipe network system in gas station.495.4.11 Coal feeding system.515.4.12 Gas wet desulfurization.515.4.13 Man

9、ufacturing standards, testing standards, acceptance criteria, detection means.555.4.14 Gas preparation and safe production of gas station.565.4.15 Gas preparation and firefighting of gas station.575.4.16 The organization and working personnels of the gas station.575.4.17 Direct cost calculating.575.

10、4.18 Device configuration detail of gas system.585.5 Material balance, water balance, nickel element balance, gas balance, and equipment capacity matched of the project.615.5.1 Material balance, water balance, nickel element balance, gas balance .625.5.2 Main equipment scheme in production.645.6 Wor

11、king system.685.7 Production inspection.685.8 General layout and transportation, utility and ancillary engineering. 68Chapter 6 Environmental Protection and Labor Safety6.1 Environmental state of the construction region .776.2 The main pollution sources and contaminants of the project.776.3 The envi

12、ronmental protection standards to be adopted. 776.4 Environment control scheme.786.5 Investment estimation of the environment protection.806.6 Evaluation conclusions of the environment impact.816.7 Labor protection and production safety.816.7.1 Analysisofrisk、occupationalharmfulness in the productio

13、n.816.7.2 The main countermeasures in labor safety design.826.8 Energy saving .85Chapter 7 Business Organizations and Labor Quota7.1 Business organizations.877.2 Labor requirement and personnel training.88Chapter 8 The Implementation Schedule of the Project 8.1 The various stages of the implementati

14、on.898.2 The implementation schedule of the project.898.3 The cost of the implementation.89Chapter 9 Financial Estimation of the Project 9.1 Total investment estimation.899.2 Funds raising.90Chapter 10 Financial Economy and Social Benefits10.1 Production costs and sales revenue estimation.9010.2 Fin

15、ancial evaluation and risk assessment.92Chapter 11 Conclusions and Recommendations11.1 Conclusions.9311.2 Recommendations.94400万吨印尼红土泥镍矿项目可行性研究报告第一章 总论1.1 项目概况 71.2 立项研究结论 81.2.1 项目产品市场前景 81.2.2 项目原料供应问题 81.2.3 项目政策保障问题 91.2.4 项目资金保障问题 91.2.5 项目组织保障问题 91.2.6 项目技术保障问题 91.2.7 项目人力保障问题 91.2.8 项目风险控制问题

16、101.2.9 项目财务效益结论 111.2.10 项目社会效益结论 111.2.11 项目立项可行性综合评价 111.3 主要技术经济指标汇总 11第二章 项目背景2.1 项目建设背景 132.2 项目建设必要性 132.3 项目建设可行性 132.3.1 经济可行性 132.3.2 政策可行性 142.3.3 技术可行性 142.3.4 模式可行性 142.3.5 组织和人力资源可行性 15第三章 项目分析及预测3.1 项目市场规模调查 153.2 项目市场竞争调查 163.3 项目市场前景预测 173.4 产品方案和建设规模 173.5 产品销售收入预测 18第四章 建设条件与厂址选择4

17、.1 资源和原材料 184.2 建设地区的选择 194.3 厂址选择 19第五章 工厂技术方案5.1 项目组成 205.2 生产技术方案 215.2.1工艺技术方案的选择 215.2.2 工艺流程 235.2.3 工艺流简述 255.3 29条3.2m168m全智能化隧道窑 265.3.1 隧道窑发展简述 265.3.2 隧道窑的结构 275.3.3 窑体结构 295.3.4 隧道窑的主要技术参数 345.3.5 回转窑与隧道窑优缺点对比 355.4 24台3. 6m两段煤气发生炉风冷间冷工艺的冷煤气站 365.4.1 煤气发生炉概述 365.4.2 规划设计依据 375.4.3 工程规模及主

18、要技术要求 385.4.4 采用或参照的国家标准 385.4.5 煤气站设计 395.4.6 工艺流程简述及节能环保优势 435.4.7 技术工艺流程 445.4.8 3.6m两段煤气发生炉主要技术特点 485.4.9 煤气站常规控制电控、仪表系统 495.4.10 煤气站管网系统 495.4.11 上煤系统 515.4.12 煤气湿法脱硫 515.4.13 制造标准、检测标准、验收标准、检测手段 555.4.14 煤气制备和煤气站安全生产 565.4.15 煤气制备和煤气站消防 575.4.16 煤气站生产组织和劳动定员 575.4.17 煤气直接成本测算 575.4.18 煤气系统设备配置

19、明细 585.5 项目物料平衡、水平衡、镍元素平衡、煤气平衡和各设备产能匹配 615.5.1 项目物料平衡、水平衡、镍元素平衡、煤气平衡 625.5.2 主要生产设备方案 645.6 工作制度 685.7 生产检验 685.8 总图运输和公用与辅助工程 68第六章 环保与劳动安全6.1 建设地区环境现状 776.2 项目主要污染源和污染物 776.3 项目拟采用的环境保护标准 776.4 治理环境的方案 786.5 环境保护投资估算 806.6 环境影响评价结论 816.7 劳动保护与安全生产 816.7.1 生产过程中危险、职业危害因素分析 816.7.2 劳动安全设计中采取的主要措施 826.8 节能 85第七章 企业组织和劳动定员7.1 企业组织 877.2 劳动定员和人员培训 88第八章 项目实施进度安排8.1 项目实施的各阶段 898.2 项目实施进度表 898.3 项目实施费用 89第九章 项目财务测算9.1 项目总投资估算 899.2 资金筹措 90第十章 财务经济和社会效益10.1 生产成本和销售收入估算 9010.2 财务评价及风险评价 92第十一章 结论与建议11.1 结论 9311.2 建议 94

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!