建设3MW光伏电站光能水能互补工程项目可行性研究报告

上传人:仙*** 文档编号:105286062 上传时间:2022-06-11 格式:DOC 页数:84 大小:1.80MB
收藏 版权申诉 举报 下载
建设3MW光伏电站光能水能互补工程项目可行性研究报告_第1页
第1页 / 共84页
建设3MW光伏电站光能水能互补工程项目可行性研究报告_第2页
第2页 / 共84页
建设3MW光伏电站光能水能互补工程项目可行性研究报告_第3页
第3页 / 共84页
资源描述:

《建设3MW光伏电站光能水能互补工程项目可行性研究报告》由会员分享,可在线阅读,更多相关《建设3MW光伏电站光能水能互补工程项目可行性研究报告(84页珍藏版)》请在装配图网上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .3MW光伏电站光能、水能互补 可行性研究报告建设3MW光伏电站光能水能互补工程项目可行性研究报告(此文档为Word格式、下载后您可任意修改编辑

24、!)目 录1项目概况1.1项目概况1.2报告编制原则及依据1.3编制范围1.4项目主要内容1.5项目实施的总体目标2地区概况及电力系统2.1地区概况2.2电力系统3项目提出的背景3.1目前我国的能源形式3.2我国电力供需现状及预测3.3世界光伏发电发展现状3.4世界光伏发展目标和发展前景3.5世界光伏技术发展趋势3.6中国光伏发电市场的现状3.7中国光伏发电市场的发展3.8中国光伏产业发展现状 3.9太阳能光伏发电在我国能源电力供应中的地位4项目的必要性4.1满足某机场用电需求,提高用电可靠性的需要4.2合理开发利用光能资源,符合能源产业发展方向4.3加快能源结构调整的需要4.4改善生态、保护

25、环境的需要5太阳能光伏电站与当地水电站电网的互补运行5.1 地区负荷特性5.2 太阳能光伏电站发电特性5.3 水电站发电特性5.4太阳能光伏电站与当地水电站电网的互补运行6工程任务及规模6.1工程建设厂址及规模6.2建设任务6.3电站与系统连接方案设想7光能资源7.1 某州太阳辐射总量及时空、日照时数分布7.2气象站光资源资料7.3光伏电站光资源计算7.4光资源综合评述8地质工程8.1厂址区域稳定性评价9光伏发电电池组件选择和发电量估算9.1光伏电池组件型式确定9.2发电量估算10电气10.1电气一次10.2电气二次11土建、给排水及暖通工程11.1土建工程采用的主要设计技术数据11.2 主要

26、建筑材料11.3 建(构)筑物抗震分类和抗震设防原则11.4 主要建筑设施及结构体系及结构选型11.5 光伏电站接地网及电缆沟11.6 给排水及消防水11.7 采暖系统11.8 通风系统11.9 空调系统12环境保护与水土保持12.1主要污染源和主要污染物12.2设计依据及采用的环境保护标准12.3控制污染的设想与影响分析12.4绿化及水土的保持12.5环境条件对太阳能光伏发电效率的制约因素分析12.6结论13 消防、劳动安全与工业卫生13.1消防13.2劳动安全13.3工业卫生13.4其它安全措施14 电站总平面布置14.1厂址概况14.2交通运输14.3电站总体布置设想15 工程设计概算1

27、5.1编制说明15.2工程概算投资附图附图1:结古镇电网地理接线图附图2:结古35kV变电所主接线图附图3:3MW光伏电站主接线图附图4:3MW光伏电站总平面布置图4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than sel

28、ect file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should

29、 be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tenderin

30、g agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall

31、 not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the ra

32、tes of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the

33、State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tender

34、ing agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted w

35、ith tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change

36、 price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be p

37、repared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the requi

38、red supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .51. 项目概况1.1 项目概况1.1.1 项目名称3MW光伏电站光能、水能互补工程。1.1.2 项目执行机构:某省某水电安装有限公司1.1.3 建设地点某省某州

39、某飞机场。1.2 报告编制原则及依据1.2.1 编制原则 (1)认真贯彻国家能源相关的方针和政策,符合国家的有关法规、规范和标准。 (2)对厂址进行合理布局,做到安全、经济、可靠。(3)充分体现社会效应、环境效益和经济效益的和谐统一。(4)论证研究太阳能光伏电站与水电站的运行、互补,提出效益最大化的运行方案。1.2.2 编制依据 (1)310kV高压配电装置设计规范(GB50060-1992) (2)供配电系统设计规范(GB50052-1995) (3)建筑设计规范(GB50016-2006)(4)电力工程电缆设计规范(GB50217-2007)(5)有关规程规范。1.3 编制范围对当地有关电

40、力系统状况进行分析,进行光能资源、水能资源分析,进行工程地质初勘、光伏电池组件选型和优化布置、发电量估算,以及对应的电气工程、土建、暖通、给排水工程、施工组织、工程管理设计、环境保护和水土保持综合评价,劳动安全与工业卫生,效益分析,工程投资概算,财务评价等。1.4 项目主要内容新建某州太阳能光伏电站1座,容量为3MW;研究3MW光伏电站光能、水能互补运行方案,解决运行效益最大化问题。1.5 项目实施的总体目标 开发当地丰富的太阳能资源,解决某州机场供电可靠性,形成对机场用电负荷的双电源供电,满足机场近期及中长期发展需要;研究3MW光伏电站光能、水能互补运行方案,解决运行效益最大化问题。2 地区

41、概况及电力系统2.1 地区概况某藏族自治州位于某省青藏高原南部,该州总面积26.7万平方公里,约占某省总面积的三分之一以上。总人口26.7万人,其中藏族占总人口的96.3%,是某省主要的林、牧区。境内有格拉丹东雪峰、可可西里冰川、各日各雅雪山和扎日根雪山,这些巨大的固体水库蕴育了长江、黄河和澜沧江三大水系,其正源沱沱河,卡日曲和扎曲都出自某境内。二江一河,水量充沛,支流发达,水力资源颇为丰富,某境内干支流水能理论蕴藏量约542.7万千瓦。某州交通闭塞,经济落后。该州的水能资源丰富,二十世纪八十年代以后,随着当地生产力水平的不断提高,对电的需求日益增长,在这期间修建了结古镇西杭,某县安冲、小苏莽

42、、上拉秀、下拉秀、巴塘相古村、称多县二级、尕朵、拉布、下赛巴,昂欠县扎曲,曲麻莱县聂恰、周木尕卡等县、乡、村十三座小水电站。二十世纪九十年代以后,又新建了治多县同卡电站,某县当托电站,称多县科玛电站和某州禅古电站。截止2007年末,该州已建成小水电站24座,总装机容量17157千瓦。某州下辖六个县,目前某省大电网尚未延伸到某州,结古镇独立小电网已初具规模,各县小水电电网初步形成基本上形成了独立电网。从这一实情出发,某州必须大力发展水电及太阳能发电。2.2 电力系统某州远离某省主电网,为独立运营的小电网。目前,全州已建成运营的小水电站有数十座,除目前新建成的4座外,主要的几座骨干水电站如禅古、科

43、玛、扎曲等电站的出力均达不到60%,其他水电站达不到50%。由于某地区目前的电源供应远远满足不了当地用电需求,从而制约了经济社会等各项事业的发展。随着近年相继开工并建成的拉贡、龙青峡两个水电站建设的快速推进和聂恰、白扎、香达三个水电站改造开工在即,某藏族自治州将实现以水电为骨干、以光伏电源为补充的电力供应网络,大大的改善了当地农牧民的生产生活条件。某州是长江、黄河、澜沧江的发源地,其支流由雅砻江、卡日曲、孜曲、当曲、结曲等众多大小河流组成,多年平均总流量达1022.3米/秒,水能理论蕴藏量约为543万千瓦。长期以来,由于地处偏远,经济发展滞后,大量的水能资源得不到及时开发,已建成的24座小水电

44、站的总装机容量仅为1.7万千瓦,不足水能总资源的0.3%,缺电成为某经济发展、社会进步的“瓶颈”。近年来,某州委、州政府紧紧抓住西部大开发的历史机遇,争资金、跑项目,不断加快电力资源的开发步伐。继总装机6000千瓦、总投资1.7亿元的拉贡电站和总装机2400千瓦、总投资7600万元的龙青峡电站相继开工建设之后,总投资2.6亿元的治多聂恰河一级电站,囊谦白扎、香达电站改造前期工作也已相继开工。这些工程完工后,将彻底解决结古镇及其他五县县城的缺电问题。与此同时,作为补充电源的光能资源开发也实现了历史性突破,先后完成投资1.06亿元,分别在40个边远乡镇和19个边远村建成乡、村级光伏电站59座,基本

45、解决了这些边远乡镇、村的生活用电。距离某飞机场较近的供电电源点为某州结古35kV变电所。目前已由该变电所架设1回35kV线路向飞机场供电。本线路导线采用LGJ-70/10型钢芯铝绞线,地线选用1X7-7.8-1270-B钢绞线。年最大负荷利用小时为5000小时,导线LGJ70/10,其经济输送容量为4MVA,极限输送容量为17.5MVA。三江源(某)机场变目前用电负荷2000kVA,随着经济的进一步发展,用电负荷将继续增加。某机场变至结古35kV变电所输电距离22.079千米。结古35kV变电所现状:现有三相双卷变压器13.15+16.3MVA,电压比为35/10.5kV。35kV母线为单母线

46、接线,目前有3回进出线,1回来自蝉古水电站,1回来自结古35kV变电站,1回去某机场变电所。10kV规划出线8回,现出线6回,分别至西杭水电站、东方红水电站、疗养院、扎西科、巴塘、大桥,2回备用。 目前某州用电最大负荷已达20000kVA,根据某州“十一五”国民经济发展规划,“十一五”期间某州结古地区用电负荷将得到较大的发展。某州结古地区电力负荷预测结果如下表:表2-1 某州结古地区电力负荷预测表 项 目 2008年(实际)2009年2013年2018年供电量(万kw.h)3870418056868355最大负荷(MW)8.99.613.119.2目前结古地区主要有两个水电站供电:禅古水电站(

47、4800kW)、拉贡水电站(8000kW)。禅古水电站冬季枯水期可发电3500kW;拉贡水电站冬季枯水期可发电6500kW。根据近年来当地用电负荷需求,两座水电站已难以满足当地(包括某飞机场用电负荷需求)。某飞机场用电容量约为2000kW,负荷性质主要为一级负荷,目前仅由结古变电所以35kV单电源供电。3 项目提出的背景某飞机场作为某州的唯一民用机场,对当地国民经济发展起着不可替代的重要作用,用电负荷大部分等级属于一级用电负荷。为提高机场供电可靠性,有必要利用当地太阳能资源建立第二电源。某机场位于青藏高原,属于太阳能资源较为丰富的一类地区,建设某太阳能光伏电站作为飞机场第二供电电源是具备太阳能

48、资源保障的。考虑到太阳能光伏电站与水电站有潜在的互补供电可能性,本工程将研究3MW光伏电站光能、水能互补问题,尽力提高项目投运后经济效益。3.1 目前我国的能源形式我国是世界上最大的能源消费国之一,同时也是世界能源生产的大国。随着国民经济的快速增长,2006年能源消费总量增至24.6亿tce(吨标准煤),比2005年增长了9.3%。2006年各种一次能源比例为:煤炭占69.7%、石油占20.3%、天然气占3.0 %、水电占6.0 %、核电占0.8 %。2006年,中国的原油进口达到1.5亿t,大约是中国原油总需求的50%。 预测到2020年,中国一次能源需求量为33亿tce,煤炭供应量为29亿

49、t,石油为6.1亿t;然而,到2020年我国煤炭生产的最大可能约为22亿t左右,石油的最高产量也只有2.0亿t,供需缺口分别为7亿t和4.1亿t。显然,要满足未来社会经济发展对于能源的需求,完全依靠煤炭、石油等常规能源是不现实的。我国能源供应状况为煤炭比重过大,环境压力沉重;人均能耗远低于世界平均水平,能源技术落后,系统效率低,产品能耗高,资源浪费大。我国能源供应面临严峻挑战:一是能源决策国际环境复杂化,对国外石油资源依存度快速加大,二是石化能源可持续供应能力遭到严重挑战.长远来看,能源资源及其供应能力将对我国能源系统的可持续性构成严重威胁.显然,从能源资源、环境保护的角度,如此高的能源需量,

50、如果继续维持目前的能源框架是绝对不可行的。因此,在大力提高能效的同时,积极开发和利用可再生能源,特别是资源量最大,分布最普遍的太阳能将是我国的必由之路。3.2 我国电力供需现状及预测2005年,全国发电装机容量达到5.0841亿千瓦,同比增长14.9%。其中水电达到1.1652亿千瓦,约占总容量22.9%;火电达到3.8413亿千瓦,约占总容量75.6%;全国发电量达到24747亿千瓦,同比增加2804亿千瓦,增速12.8%。2006年,全国发电装机容量达到6.22亿千瓦,同比增长20.3%。其中水电达到1.4亿千瓦,约占总容量22.5%;火电达到4.7252亿千瓦,约占总容量75.97%;全

51、国发电量达到28344亿千瓦,同比增加2804亿千瓦,增速14.5%。根据专家预计2007年至2010年全社会用电量的年均增速在12%左右,20102020年增速在8%左右。根据以上预测结果,到2020年,中国电力装机容量将突破12亿千瓦,发电量将超过6万亿千瓦,在现有基础上翻一番多。我国的一次能源储量远远低于世界平均水平,大约只有世界总储量的10%,必须慎重的控制煤电、核电和天然气发电的发展;煤电的发展不仅仅受煤炭资源的制约,还受运输能力和水资源条件的制约;核电的发展同样受核原料和安全性的制约,核废料处理的问题更为严重,其成本是十分高昂的;我国的环境问题日益显现,发展煤电和大水电必须要考虑环

52、境的可持续发展,必须计入外部成本。因此大力发展可再生能源发电是我国解决能源危机和保证可持续发展的重要举措,而太阳能发电将在未来中国能源供应中占据重要地位。3.3 世界光伏发电发展现状世界光伏产业迅速发展,最近10年太阳电池组件生产的年平均增长率达到33%,最近5年的年平均增长率达到43%,2006年世界太阳能电池产量达到2500MWp,累计发货量达到8500MWp。而中国2006年太阳能电池的产量达到了369.5 MWp,紧随日本和德国之后,位于世界第三大光伏电池生产国。世界光伏产业和市场的另一个突出特点是:光伏发电在能源中的替代功能越来越大,主要表现在并网发电的应用比例增加非常快,并成为光伏

53、发电的主导市场。并网发电在光伏市场中的主导地位在人类能源变革中具有重要意义,它标志着光伏发电由边缘地区离网和特殊应用向电网能源发展、由补充能源向替代能源转变、人类社会开始建设可持续发展的能源体系。3.4 世界光伏发展目标和发展前景世界上一些主要国家都制定了国家光伏发展路线和发展目标,现对比如下:表3-1 世界主要国家光伏发电成本预测一览表光伏发电成本预测年份200420102020日本(日元/kW.h)302314欧洲(欧元/kW.h)0.250.180.1美国(美元/kW.h)0.1820.1340.1中国(元/kW.h)531.4表3-2 世界主要国家光伏发电装机预测一览表光伏发电装机预测

54、/GWp年份200420102020日本1.24.830欧洲1.2341美国0.342.136中国0.0650.31.8其他 1.1953.891.2世界 414200从长远看,太阳能光伏发电在不远的将来占据世界消费的重要位置,不但要替代部分常规能源,而且将成为世界能源供应的主体。根据欧盟联合研究中心(JRC)的预测,到2030年世界可再生能源在总能源结构中将占30%左右,太阳能光伏发电在世界总电力的供应中到达10%左右;2040年可再生能源占总能耗50%以上,太阳能发电将占电力的20%以上;到21世纪末可再生能源占总能耗50%以上,太阳能发电占到60%以上,显示出重要战略地位。3.5 世界光

55、伏技术发展趋势技术进步是降低成本、促进发展的根本原因。几十年来围绕着降低成本的各项研究开发工作取得了辉煌的成就,表现在电池效率的不断提高,硅片厚度的持续降低和产业化技术不断改进等方面,对降低光伏发电成本起到了决定性的作用。(1)电池效率的不断提高单晶硅电池的实验室最高效率已经从50年代的6%提高到目前的24.7%,多晶硅电池的实验室最高效率也达到了20.3%。薄膜电池的研究工作也获得了很大成功,非单晶硅薄膜电池、碲化镉(CdTe)、铜铟硒(CIS)的实验室效率也分别达到了13、16.4和19.5。其他新型电池,如多晶硅薄膜电池、燃料敏化电池、有机电池等不断取得进展,更高效率的新概念电池受到广泛

56、重视被列入开发计划。随着实验室效率的不断提高,商品化电池的效率也得到了不断提升。目前单晶硅电池的效率可达到1620,多晶硅电池可达到1416;与此同时,光伏产业技术和光伏系统集成技术与时俱进,共同促使光伏发电成本不断降低和光伏市场及产业的持续扩大发展。(2)商业化电池厚度持续降低降低硅片厚度是减少硅材料消耗、降低晶体硅太阳电池成本的有效技术措施,是光伏技术进步的重要方面。30多年来,太阳电池硅片厚度从20世纪70年代的450500um,降低了一半以上,硅材料用量大大减少,对太阳电池成本降低起到了重要作用,是技术进步促进降低成本的重要范例之一。预计2010年硅片厚度将降至150200um,202

57、0年将降至80100 um,届时成本将相应大幅降低。(3)生产规模不断扩大生产规模不断扩大和自动化程度持续提高是太阳能电池生产成本降低的另一个重要方面,太阳电池单厂生产规模已经从20世纪80年代的15MWp/a发展到90年代的530MWp/a和目前的50500MWp/a。生产规模与成本降低的关系体现在学习曲线率LR(Learning Curve Rate)上,即生产规模扩大1倍,生产成本降低20%。预计,在未来的两年之内,单厂年生产能力达到1GWp的企业将会出现。(4)太阳电池组件成本大幅度降低光伏组件成本30年来降低2个数量级。2003年世界重要厂商的成本为22.3美元/Wp,最近因材料紧缺

58、有所回升。当供求关系越过平衡点后,成本会比前一个供求关系对应点更低,这也是30年来经验曲线中曾经出现过的现象。(5)晶体硅电池技术持续进步,薄膜电池技术快速发展2006年各种电池技术的市场份额,其中多晶硅46.5%,单晶硅43.4%,带硅电池2.6%,薄膜电池约7.6%。多晶硅电池自1998年开始超过单晶体硅后一直持续增长,各种薄膜电池市场份额近年来也在稳定增长,反映出技术进步的推动力量。3.6 中国光伏发电市场的现状中国的光伏发电市场目前主要用于边远地区农村电气化、通信和工业应用以及太阳能光伏商品,包括太阳能灯、草坪灯、太阳能交通信号灯以及太阳能景观照明等。由于成本很高,并网光伏发电目前还处

59、于示范阶段。所有这些应用领域中,大约有53.8%属于商业化的市场(通信工业和太阳能光伏产品),而另外的46.2%则属于需要政府和政策支持的市场,包括农村电气化和并网光伏发电。3.7 中国光伏发电市场的发展中国于1958年开始研究光伏电池,1971年首次成功应用于我国发射的东方红二号卫星上,1973年开始将光伏电池用于地面。2002年,国家计委启动“西部省区无电乡通电计划”,通过光伏和小型风力发电解决西部(西藏、某州、某、甘肃、内蒙古、陕西和四川)700多个无电乡的用电问题,光伏电量达到15.5MWp。该项目大大刺激了国内光伏工业,国内建起了几条太阳电池的封装线,使太阳电池的年生产量迅速达到10

60、0 MWp(2002年当年产量20 MWp)。截止到2003年底,中国太阳电池的累计装机已经达到55 MWp。2003-2005年,由于欧洲光伏市场的拉动,中国的光伏生产能力迅速增长,截止到2005年底,中国太阳电池组件的生产能力已经达到400 MWp,当年产量达到140 MWp,绝大部分太阳电池组件出口欧洲,2005年国内安装量只有5 MWp,2006年为10 MWp。下图给出中国光伏发电市场的发展进程。表3-3 中国光伏发电各年装机及累计装机一览表年份1976198019851990199520002002200420052006年装机/kWp0.587050015503300203001

61、0000500010000累计装机/kWp0.516.52001780663019000450006500070000800003.8 中国光伏产业发展现状太阳能光伏系统中最重要的是电池,是收集光和实现光电转换的基本单位。大量的电池合成在一起构成光伏组件。并网发电系统由光伏组件、太阳跟踪装置、逆变器、高低压配电装置构成。太阳能电池通常由晶体硅和薄膜材料制造,前者由切割、铸锭或者锻造的方法获得,后者是一层薄膜附在低价的衬背上。目前,世界上85%以上的市场份额是晶体硅太阳电池,包括单晶硅太阳电池和多晶硅太阳电池,其他类型的太阳电池所占比例很小,因此在考虑太阳电池产业链时主要分析晶体硅太阳能光复电池

62、的产业链。光伏发电产业链的构成见下图:硅 矿冶金矿(工业矿)高纯多晶硅/SOG硅单晶硅电池多晶硅电池光伏组件光伏阵列光伏发电系统单晶硅棒多晶硅锭3.8.1 多晶体硅原材料产业状况光伏技术发展至今,晶体硅光伏电池始终是商品化光伏电池的主流,国际市场上98%以上的光伏电池是利用高纯多晶体硅制备的。作为光伏电池生产最基本材料-高纯多晶体硅制造业也就成为光伏产业链上最重要的环节。目前,多晶体硅原材料的先进生产技术基本上掌握在8家主要生产商手中。由于种种原因,多晶体硅原材料生产量的增长远远落后于光伏产业需求量的增长,这导致了自2004年以来世界范围内多晶体硅原材料的持续紧缺并导致价格的持续上涨,预计这种

63、紧缺状况至少还将持续2年左右的时间。多晶体硅的生产已经成为整个光伏产业链的瓶颈,不但限制了太阳电池产量的增长而且使太阳电池的成本持续保持在34美元/峰瓦的水平,严重制约了光伏产业和市场的发展。中国多晶体硅原材料产业存在的问题包括:(1)技术落后。主要技术基于改良的西门子法,但工艺落后,能耗为世界先进水平的1.52倍。(2)规模小。多晶体硅生产是规模效益型产业,一般认为临界规模为2000t/a,产量低于1000t/a的企业被认为不具有经济合理性。2006年,中国多晶体硅的年生产能力为400t,实际生产量为300t,仅够30MWp太阳电池的生产需求,实际生产量与需求存在巨大的差距,多晶体硅原材料基本依赖进口。3.8.2 晶体硅锭制造产业状况硅锭切片,即硅片的生产是晶体硅太阳能光伏电池制备的第一道工序,晶体硅电池组件成本的65%来自硅片,而电池制造和组件封装只占成本的10%和25%。随着硅材料成本的持续走高,硅锭切割工艺在光伏电池制造环节中的重要性也日益提高。通过不断提升硅片制备的工艺、设备和技术水平来降低硅片成本、节约原材料,提高生产效率,已成为光伏产业目前关注的焦点。中国晶体硅材料产业有以下特点:u 发展迅速。近几年的年平均增长率超过70%。u 对原材料的依存度高。由于国内无法提供高纯多晶体硅材料,因此企业原料基本

展开阅读全文
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!